The DOI matches its Crossref record; 23 of the 23 references it cites were found in a registry or an index.
Automated construction progress measurement using a 4D building information model and 3D data
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Wu, Y. (1999) · Technometrics · doi:10.1080/00401706.1999.10485951 · Cited by 27,221
A method for registration of 3-D shapes
Besl, P. J., & McKay, N. D. (1992) · IEEE Transactions on Pattern Analysis and Machine Intelligence · doi:10.1109/34.121791 · Cited by 18,103
Robust registration of 2D and 3D point sets
Fitzgibbon, A. W. (2003) · Image and Vision Computing · doi:10.1016/j.imavis.2003.09.004 · Cited by 925
Credit scoring with a data mining approach based on support vector machines
Huang, C.-L., Chen, M.-C., & Wang, C.-J. (2007) · Expert Systems with Applications · doi:10.1016/j.eswa.2006.07.007 · Cited by 804
Bosché, F. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2009.08.006 · Cited by 482
Natural terrain classification using three‐dimensional ladar data for ground robot mobility
Lalonde, J., Vandapel, N., Huber, D. F., & Hebert, M. (2006) · Journal of Field Robotics · doi:10.1002/rob.20134 · Cited by 464
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000205 · Cited by 404
Automated progress tracking using 4D schedule and 3D sensing technologies
Turkan, Y., Bosche, F., Haas, C. T., & Haas, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.10.003 · Cited by 374
Widodo, A., Yang, B.-S., & Han, T. (2007) · Expert Systems with Applications · doi:10.1016/j.eswa.2005.11.031 · Cited by 296
Forecasting financial condition of Chinese listed companies based on support vector machine
Ding, Y., Song, X., & Zen, Y. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.06.037 · Cited by 246
Cited by
Towards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
Bosché, F., Ahmed, M., Turkan, Y., Haas, C. T., & Haas, R. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.05.014 · Cited by 550
Wang, Q., & Kim, M.-K. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.02.007 · Cited by 461
Computer vision techniques in construction: A critical review
Xu, S., Wang, J., Shou, W., Ngo, T., Sadick, A.-M., & Wang, X. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09504-3 · Cited by 409
Santos, R., Costa, A. A., & Grilo, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.005 · Cited by 318
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
Li, X., Wu, P., Shen, G. Q., Wang, X., & Teng, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.09.011 · Cited by 307
Yang, J., Park, M.-W., Vela, P. A., & Golparvar-Fard, M. (2015) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.01.011 · Cited by 292
Data acquisition technologies for construction progress tracking
Omar, T., & Nehdi, M. L. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.06.016 · Cited by 284
Kim, M.-K., Cheng, J. C. P., Sohn, H., & Chang, C.-C. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.07.010 · Cited by 275
Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis
Yalcinkaya, M., & Singh, V. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.012 · Cited by 272
Wang, Q., Tan, Y., & Mei, Z. (2020) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-019-09320-4 · Cited by 272
Charef, R., Alaka, H., & Emmitt, S. (2018) · Journal of Building Engineering · doi:10.1016/j.jobe.2018.04.028 · Cited by 255
Han, K. K., & Golparvar-Fard, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.007 · Cited by 246
GPT models in construction industry: Opportunities, limitations, and a use case validation
Saka, A., Taiwo, R., Saka, N., Salami, B. A., Ajayi, S., Akande, K., & Kazemi, H. (2024) · Developments in the Built Environment · doi:10.1016/j.dibe.2023.100300 · Cited by 202
Material Recognition for Automated Progress Monitoring using Deep Learning Methods
Mahami, H., Ghassemi, N., Darbandy, M. T., Shoeibi, A., Hussain, S., Nasirzadeh, F., Alizadehsani, R., Nahavandi, D., Khosravi, A., & Nahavandi, S. (2020) · arXiv · doi:10.48550/arxiv.2006.16344 · Cited by 25
Braun, A., Tuttas, S., Stilla, U., & Borrmann, A. (2018) · Building Information Modeling · doi:10.1007/978-3-319-92862-3_28 · Cited by 12
Metadata
- Authors
- Kim, C., Son, H., & Kim, C.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2013-05
- Volume
- 31
- Pages
- 75-82
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2027285680
- Cited by
- 317
- References
- 23
- FWCI
- 27.35
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.