The DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.
Identifying and assessing critical risk factors for BIM projects: Empirical study
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Review of Psychometric theory (2nd ed.).
SITGREAVES, R. (1979) · Contemporary Psychology: A Journal of Reviews · doi:10.1037/018882 · Cited by 11,425
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry
Azhar, S. (2011) · Leadership and Management in Engineering · doi:10.1061/(asce)lm.1943-5630.0000127 · Cited by 2,192
An Instrument for Measuring the Critical Factors of Quality Management
Saraph, J. V., Benson, P. G., & Schroeder, R. G. (1989) · Decision Sciences · doi:10.1111/j.1540-5915.1989.tb01421.x · Cited by 2,030
Wang, X. (2012) · Construction Economics and Building · doi:10.5130/ajceb.v12i3.2749 · Cited by 1,495
The project benefits of Building Information Modelling (BIM)
Bryde, D., Broquetas, M., & Volm, J. M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.001 · Cited by 1,268
Identifying Software Project Risks: An International Delphi Study
Schmidt, R., Lyytinen, K., Keil, M., & Cule, P. (2001) · Journal of Management Information Systems · doi:10.1080/07421222.2001.11045662 · Cited by 1,252
Identification of the Critical Factors of TQM*
Black, S. A., & Porter, L. J. (1996) · Decision Sciences · doi:10.1111/j.1540-5915.1996.tb00841.x · Cited by 1,021
Understanding and facilitating BIM adoption in the AEC industry
Gu, N., & London, K. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.002 · Cited by 912
Understanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859
BIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
Project Risk Management: Processes, Techniques and Insights
Smith, J. U. M. (1998) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600022 · Cited by 555
Wallace, L., Keil, M., & Rai, A. (2004) · Decision Sciences · doi:10.1111/j.00117315.2004.02059.x · Cited by 487
Building Information Modeling (BIM) partnering framework for public construction projects
Porwal, A., & Hewage, K. N. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.004 · Cited by 482
Risk assessment of construction projects
Zavadskas, E. K., Turskis, Z., & Tamošaitienė, J. (2010) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2010.03 · Cited by 472
Risk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468
Risk management framework for construction projects in developing countries
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004) · Construction Management and Economics · doi:10.1080/0144619032000124689 · Cited by 445
Systematic Risk Management Approach for Construction Projects
Al‐Bahar, J. F., & Crandall, K. C. (1990) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1990)116:3(533 · Cited by 414
Risk management for overseas construction projects
Zhi, H. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00015-i · Cited by 407
Modified approach for prioritization of failures in a system failure mode and effects analysis
Ravi Sankar, N., & Prabhu, B. S. (2001) · International Journal of Quality & Reliability Management · doi:10.1108/02656710110383737 · Cited by 347
Project risk management in the Queensland engineering construction industry: a survey
Lyons, T., & Skitmore, M. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00005-x · Cited by 340
The Benefits, Obstacles and Problems of Practical Bim Implementation
Migilinskas, D., Popov, V., Juocevicius, V., & Ustinovičius, L. (2013) · Procedia Engineering · doi:10.1016/j.proeng.2013.04.097 · Cited by 337
Early Warning Signs of it Project Failure: The Dominant Dozen
Kappelman, L. A., McKeeman, R., & Zhang, L. (2006) · Information Systems Management · doi:10.1201/1078.10580530/46352.23.4.20060901/95110.4 · Cited by 336
Project risk assessment using the analytic hierarchy process
Mustafa, M. A., & Al-Bahar, J. F. (1991) · IEEE Transactions on Engineering Management · doi:10.1109/17.65759 · Cited by 331
A study of measuring the critical factors of quality management
Badri, M. A., Davis, D., & Davis, D. (1995) · International Journal of Quality & Reliability Management · doi:10.1108/02656719510080604 · Cited by 300
Where to Focus for Successful Adoption of Building Information Modeling within Organization
Won, J., Lee, G., Dossick, C., & Messner, J. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000731 · Cited by 267
Aligning building information model tools and construction management methods
Hartmann, T., van Meerveld, H., Vossebeld, N., & Adriaanse, A. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.12.011 · Cited by 266
Ghosh, S., & Jintanapakanont, J. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.004 · Cited by 242
Marketing strategy based on customer behaviour for the LCD-TV
Chiu, Y.-J., Chen, H.-C., Tzeng, G.-H., & Shyu, J. Z. (2006) · International Journal of Management and Decision Making · doi:10.1504/ijmdm.2006.009140 · Cited by 241
Risk Management in the Chinese Construction Industry
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., & Lu, Y. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:12(944 · Cited by 198
Critical success factors in small and medium enterprises: Survey results
Yusof, S. M., & Aspinwall, E. M. (2000) · Total Quality Management · doi:10.1080/09544120050007760 · Cited by 185
Project risk management in Hong Kong
Shen, L. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00045-2 · Cited by 125
Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms
Kaner, I., Sacks, R., Kassian, W., & Quitt, T. (2008) · Cambridge University Engineering Department Publications Database · Cited by 113
Risk-management infrastructures
Williams, T. (1993) · International Journal of Project Management · doi:10.1016/0263-7863(93)90003-6 · Cited by 86
Project risk management: Processes, techniques and insights
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)80942-9 · Cited by 79
Evaluating The Impact Of Building Information Modeling (BIM) On Construction
Suermann, P. C. (2009) · Cited by 77
Why the vasa sank: 10 problems and some antidotes for software projects
Fairley, R. E., & Willshire, M. J. (2003) · IEEE Software · doi:10.1109/ms.2003.1184161 · Cited by 44
Cited by
Si, S.-L., You, X.-Y., Liu, H.-C., & Zhang, P. (2018) · Mathematical Problems in Engineering · doi:10.1155/2018/3696457 · Cited by 1,082
Santos, R., Costa, A. A., & Grilo, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.005 · Cited by 318
Si, S., You, X., Liu, H., & Zhang, P. (2018) · RePEc: Research Papers in Economics · doi:10.17863/cam.17789 · Cited by 259
Qin, X., Shi, Y., Lyu, K., & Mo, Y. (2020) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/jcem.2020.12176 · Cited by 154
Metadata
- Authors
- Chien, K.-F., Wu, Z.-H., & Huang, S.-C.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2014-09
- Volume
- 45
- Pages
- 1-15
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2059043757
- Cited by
- 317
- References
- 37
- FWCI
- 23.53
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.