The DOI matches its Crossref record; 38 of the 38 references it cites were found in a registry or an index.
Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,844
The Analytic Hierarchy Process
SAATY, T. L., & KEARNS, K. P. (1985) · Analytical Planning · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,357
Fuzzy Set Theory—and Its Applications
Zimmermann, H.-J. (2001) · Springer eBooks · doi:10.1007/978-94-010-0646-0 · Cited by 7,526
Fuzzy Sets and Fuzzy Logic: Theory and Applications
Klir, G. J., & Yuan, B. (1995) · Medical Entomology and Zoology · Cited by 6,240
Applications of the Extent Analysis Method on Fuzzy AHP
Chang, D.-Y. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00300-2 · Cited by 4,874
Extensions of the TOPSIS for group decision-making under fuzzy environment
Chen, C.-T. (2000) · Fuzzy Sets and Systems · doi:10.1016/s0165-0114(97)00377-1 · Cited by 3,844
Buckley, J. J. (1985) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(85)90090-9 · Cited by 3,360
A fuzzy extension of Saaty's priority theory
van Laarhoven, P. J. M., & Pedrycz, W. (1983) · Fuzzy Sets and Systems · doi:10.1016/s0165-0114(83)80082-7 · Cited by 3,045
A fuzzy approach for supplier evaluation and selection in supply chain management
Chen, C. A., Lin, C., & Huang, S.-F. (2005) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.03.009 · Cited by 1,623
Failure Mode and Effect Analysis: FMEA From Theory to Execution
Schneider, H. (1996) · Technometrics · doi:10.1080/00401706.1996.10484424 · Cited by 1,493
Multi‐criteria supplier selection using fuzzy AHP
Kahraman, C., Cebeci, U., & Ulukan, Z. (2003) · Logistics Information Management · doi:10.1108/09576050310503367 · Cited by 1,229
Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysis
Bowles, J. B., & Peláez, C. E. (1995) · Reliability Engineering & System Safety · doi:10.1016/0951-8320(95)00068-d · Cited by 687
Extension of the TOPSIS method for decision-making problems with fuzzy data
Jahanshahloo, G. R., Lotfı, F. H., & Izadikhah, M. (2006) · Applied Mathematics and Computation · doi:10.1016/j.amc.2006.02.057 · Cited by 643
Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean
Wang, Y.-M., Chin, K.-S., Poon, G. K. K., & Yang, J.-B. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.11.028 · Cited by 630
Modified failure mode and effects analysis using approximate reasoning
Pillay, A., & Wang, J. (2003) · Reliability Engineering & System Safety · doi:10.1016/s0951-8320(02)00179-5 · Cited by 581
Multicriteria decision making in energy planning using a modified fuzzy TOPSIS methodology
Kaya, T., & Kahraman, C. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.11.081 · Cited by 474
Development and evaluation of five fuzzy multiattribute decision-making methods
Triantaphyllou, E., & Lin, C.-T. (1996) · International Journal of Approximate Reasoning · doi:10.1016/0888-613x(95)00119-2 · Cited by 452
Plant location selection based on fuzzy TOPSIS
Yong, D. (2006) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-004-2436-5 · Cited by 443
Fuzzy Mathematical Programming
Lai, Y.-J., & Hwang, C.-L. (1992) · Lecture notes in economics and mathematical systems · doi:10.1007/978-3-642-48753-8 · Cited by 403
Fuzzy performance evaluation in Turkish Banking Sector using Analytic Hierarchy Process and TOPSIS
Seçme, N. Y., Bayrakdaroğlu, A., & Kahraman, C. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.03.013 · Cited by 383
Fuzzy assessment of FMEA for engine systems
Xu, K., Tang, L. C., Xie, M., Ho, S. L., & Zhu, M. L. (2002) · Reliability Engineering & System Safety · doi:10.1016/s0951-8320(01)00101-6 · Cited by 380
Modified approach for prioritization of failures in a system failure mode and effects analysis
Ravi Sankar, N., & Prabhu, B. S. (2001) · International Journal of Quality & Reliability Management · doi:10.1108/02656710110383737 · Cited by 347
Systematic failure mode effect analysis (FMEA) using fuzzy linguistic modelling
Sharma, R. K., Kumar, D., & Kumar, P. (2005) · International Journal of Quality & Reliability Management · doi:10.1108/02656710510625248 · Cited by 324
Selecting Plant Location via a Fuzzy TOPSIS Approach
Chu, T.-C. (2002) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s001700200227 · Cited by 298
Fuzzy TOPSIS approach for failure mode, effects and criticality analysis
Braglia, M., Frosolini, M., & Montanari, R. (2003) · Quality and Reliability Engineering International · doi:10.1002/qre.528 · Cited by 297
Modelling Failure Modes and Effects Analysis
Gilchrist, W. G. (1993) · International Journal of Quality & Reliability Management · doi:10.1108/02656719310040105 · Cited by 278
Fuzzy FMEA with a guided rules reduction system for prioritization of failures
Tay, K. M., & Lim, C. P. (2006) · International Journal of Quality & Reliability Management · doi:10.1108/02656710610688202 · Cited by 250
MAFMA: multi‐attribute failure mode analysis
Braglia, M. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010353885 · Cited by 244
An Assessment of RPN Prioritization in a Failure Modes Effects and Criticality Analysis
Bowles, J. (2004) · Journal of the IEST · doi:10.17764/jiet.47.1.y576m26127157313 · Cited by 210
Development of a fuzzy FMEA based product design system
Chin, K., Chan, A. M. M., & Yang, J. (2007) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-006-0898-3 · Cited by 201
Failure mode and effects analysis using fuzzy method and grey theory
Chang, C., Wei, C., & Lee, Y. (1999) · Kybernetes · doi:10.1108/03684929910300295 · Cited by 198
A revised failure mode and effects analysis model
Ben‐Daya, M., & Raouf, A. (1996) · International Journal of Quality & Reliability Management · doi:10.1108/02656719610108297 · Cited by 192
Risk evaluation of green components to hazardous substance using FMEA and FAHP
Hu, A. H., Hsu, C.-W., Kuo, T.-C., & Wu, W.-C. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.08.031 · Cited by 189
Failure mode and effects analysis using grey theory
Chang, C., Liu, P., & Wei, C. (2001) · Integrated Manufacturing Systems · doi:10.1108/09576060110391174 · Cited by 155
Fuzzy inference to risk assessment on nuclear engineering systems
Guimarães, A. C. F., & Lapa, C. M. F. (2005) · Applied Soft Computing · doi:10.1016/j.asoc.2005.06.002 · Cited by 152
Fuzzy FMEA applied to PWR chemical and volume control system
Guimarães, A. C. F., & Lapa, C. M. F. (2004) · Progress in Nuclear Energy · doi:10.1016/s0149-1970(04)90010-8 · Cited by 93
Braglia, M., & Bevilacqua, M. (2000) · Technology Law and Insurance · doi:10.1080/135993700750364341 · Cited by 38
Cited by
Risk evaluation approaches in failure mode and effects analysis: A literature review
Liu, H.-C., Liu, L., & Liu, N. (2013) · Expert Systems with Applications · doi:10.1016/j.eswa.2012.08.010 · Cited by 965
Mardani, A., Jusoh, A., & Zavadskas, E. K. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.01.003 · Cited by 951
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574
Ilbahar, E., Karaşan, A., Cebi, S., & Kahraman, C. (2018) · Safety Science · doi:10.1016/j.ssci.2017.10.025 · Cited by 573
A state-of the-art survey & testbed of fuzzy AHP (FAHP) applications
Kubler, S., Robert, J., Derigent, W., Voisin, A., & Le Traon, Y. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2016.08.064 · Cited by 441
Metadata
- Authors
- Kutlu, A. C., & Ekmekçioğlu, M.
- Venue
- Expert Systems with Applications
- Publisher
- Elsevier BV
- Published
- 2012-01
- Volume
- 39
- Issue
- 1
- Pages
- 61-67
- ISSN
- 0957-4174 (ISSN-L)
- OpenAlex
- W2032711326
- Cited by
- 594
- References
- 38
- FWCI
- 35.12
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.