Application of a fuzzy based decision making methodology to construction project risk assessment
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Applications of the Extent Analysis Method on Fuzzy AHP
Chang, D.-Y. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00300-2 · Cited by 4,874
Buckley, J. J. (1985) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(85)90090-9 · Cited by 3,360
A fuzzy extension of Saaty's priority theory
van Laarhoven, P. J. M., & Pedrycz, W. (1983) · Fuzzy Sets and Systems · doi:10.1016/s0165-0114(83)80082-7 · Cited by 3,045
Application of the AHP in project management
Al-Harbi, K. M. A.-S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,125
Modified failure mode and effects analysis using approximate reasoning
Pillay, A., & Wang, J. (2003) · Reliability Engineering & System Safety · doi:10.1016/s0951-8320(02)00179-5 · Cited by 581
Cox, E. (1994) · Cited by 516
Cheng, C.-H. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(96)00026-4 · Cited by 482
Risk management for overseas construction projects
Zhi, H. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00015-i · Cited by 407
Badri, M. A. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00249-7 · Cited by 348
Project risk management in the Queensland engineering construction industry: a survey
Lyons, T., & Skitmore, M. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00005-x · Cited by 340
Managing Construction Projects : An Information Processing Approach
Winch, G. (2002) · Research Explorer (The University of Manchester) · Cited by 211
Information Resource Planning for a Health-Care System Using an AHP-Based Goal Programming Method
Lee, C. W., & Kwak, N. K. (1999) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600821 · Cited by 98
Fuzzy Logic for Business, Finance, and Management
Bojadziev, G., Bojadziev, M., & Zadeh, L. A. (1997) · Advances in fuzzy systems · doi:10.1142/3312 · Cited by 97
Fuzzy eigenvalues and input-output analysis
Buckley, J. J. (1990) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(90)90158-3 · Cited by 77
Forecasting the capabilities of the Korean civil aircraft industry
Kim, S.-B., & Whang, K.-S. (1993) · Omega · doi:10.1016/0305-0483(93)90041-i · Cited by 20
Cited by
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Pärn, E., & Edwards, D. J. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 721
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574
Ilbahar, E., Karaşan, A., Cebi, S., & Kahraman, C. (2018) · Safety Science · doi:10.1016/j.ssci.2017.10.025 · Cited by 573
Fuzzy Multicriteria Decision-Making: A Literature Review
Kahraman, C., Onar, S. C., & Oztaysi, B. (2015) · International Journal of Computational Intelligence Systems · doi:10.1080/18756891.2015.1046325 · Cited by 542
A novel spherical fuzzy analytic hierarchy process and its renewable energy application
Kutlu Gündoğdu, F., & Kahraman, C. (2020) · Soft Computing · doi:10.1007/s00500-019-04222-w · Cited by 484
Metadata
- Authors
- Zeng, J., An, M., & Smith, N. J.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2007-08
- Volume
- 25
- Issue
- 6
- Pages
- 589-600
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2027859047
- Cited by
- 537
- References
- 15
- FWCI
- 20.51
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.