Application of a fuzzy based decision making methodology to construction project risk assessment
The DOI matches its Crossref record; 15 of the 15 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Applications of the Extent Analysis Method on Fuzzy AHP
Chang, D.-Y. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00300-2 · Cited by 4,874
Buckley, J. J. (1985) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(85)90090-9 · Cited by 3,360
A fuzzy extension of Saaty's priority theory
van Laarhoven, P. J. M., & Pedrycz, W. (1983) · Fuzzy Sets and Systems · doi:10.1016/s0165-0114(83)80082-7 · Cited by 3,045
Application of the AHP in project management
Al-Harbi, K. M. A.-S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,125
Modified failure mode and effects analysis using approximate reasoning
Pillay, A., & Wang, J. (2003) · Reliability Engineering & System Safety · doi:10.1016/s0951-8320(02)00179-5 · Cited by 581
Cox, E. (1994) · Cited by 516
Cheng, C.-H. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(96)00026-4 · Cited by 482
Risk management for overseas construction projects
Zhi, H. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00015-i · Cited by 407
Fuzzy Logic for Business, Finance, and Management
Bojadziev, G., Bojadziev, M., & Zadeh, L. A. (1997) · Advances in fuzzy systems · doi:10.1142/3312 · Cited by 360
Badri, M. A. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00249-7 · Cited by 348
Cited by
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Pärn, E., & Edwards, D. J. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 721
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574
Ilbahar, E., Karaşan, A., Cebi, S., & Kahraman, C. (2018) · Safety Science · doi:10.1016/j.ssci.2017.10.025 · Cited by 573
Fuzzy Multicriteria Decision-Making: A Literature Review
Kahraman, C., Onar, S. C., & Oztaysi, B. (2015) · International Journal of Computational Intelligence Systems · doi:10.1080/18756891.2015.1046325 · Cited by 542
A novel spherical fuzzy analytic hierarchy process and its renewable energy application
Kutlu Gündoğdu, F., & Kahraman, C. (2020) · Soft Computing · doi:10.1007/s00500-019-04222-w · Cited by 484
Fuzzy analytic hierarchy process with interval type-2 fuzzy sets
Kahraman, C., Öztayşi, B., Uçal Sarı, İ., & Turanoğlu, E. (2014) · Knowledge-Based Systems · doi:10.1016/j.knosys.2014.02.001 · Cited by 473
A fuzzy approach to construction project risk assessment
Nieto-Morote, A., & Ruz-Vila, F. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.002 · Cited by 464
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP
Abdelgawad, M., & Fayek, A. R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000210 · Cited by 340
Risk assessment model selection in construction industry
KarimiAzari, A., Mousavi, N., Mousavi, S. F., & Hosseini, S. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.12.110 · Cited by 232
“Zeng et al. (2007) developed a methodology to deal with risks associated with the construction projects in the complicated situations.”
BackgroundMethodGovindan, K., & Sivakumar, R. (2016) · Annals of Operations Research · doi:10.1007/s10479-015-2004-4 · Cited by 216
Factors affecting contractors’ risk attitudes in construction projects: Case study from China
Wang, J., & Yuan, H. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.006 · Cited by 216
“During the lifecycle of construction projects, especially in the planning phase, the participants are confronted with enormous RBDM problems, which are usually addressed through identifying, analyzing and responding to potential risks, and ultimately optimizing solutions (Al-Bahar and Crangell, 1990; Raftery, 2003; Ze…”
BackgroundMardani, A., Hooker, R. E., Ozkul, S., Yifan, S., Nilashi, M., Sabzi, H. Z., & Fei, G. C. (2019) · Expert Systems with Applications · doi:10.1016/j.eswa.2019.07.002 · Cited by 208
Kuo, Y.-C., & Lu, S.-T. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.10.003 · Cited by 199
“Some of these studies have also applied AHP to risk assessments (Dikmen and Birgonul, 2006; Lu, 2010; Lu et al., 2007; Sadiq et al., 2007; Zayed et al., 2008; Zeng et al., 2007).”
BackgroundMulti-classifier information fusion in risk analysis
Pan, Y., Zhang, L., Wu, X., & Skibniewski, M. J. (2020) · Information Fusion · doi:10.1016/j.inffus.2020.02.003 · Cited by 191
Six decades of project management research: Thematic trends and future opportunities
Padalkar, M., & Gopinath, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.006 · Cited by 182
“Zhang (2011) reviews literature on project risk and observes two schools of risk, distinct in their assumptions, risk definitions and methodologies.”
BackgroundRisk Management in Construction Projects
Banaitiene, N., & Banaitis, A. (2012) · Risk Management - Current Issues and Challenges · doi:10.5772/51460 · Cited by 176
“[65], the application of fuzzy reasoning techniques provides an effective tool to handle the uncertainties and subjectivities arising in the construction project.”
MethodKong, X., Cai, C.-S., & Hu, J. (2017) · Applied Sciences · doi:10.3390/app7050497 · Cited by 171
“[244] presented a fuzzy based decision making methodology to handle the uncertainties and subjectivities so as to assess risks in complicated construction situations.”
Lv, K., Feng, X., Kelly, S., Zhu, L., & Deng, M. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.03.233 · Cited by 168
Strategic Decision Selection Using Hesitant fuzzy TOPSIS and Interval Type-2 Fuzzy AHP: A case study
Cevik Onar, S., Oztaysi, B., & Kahraman, C. (2014) · International Journal of Computational Intelligence Systems · doi:10.1080/18756891.2014.964011 · Cited by 167
“In one of the recent studies Zeng et al. [74] propose using arithmetic averaging method to get performance scores and extend the method with different scales contains triangular, trapezoidal, and crisp numbers.”
Islam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163
A Fuzzy Modeling Approach for Risk-Based Access Control in eHealth Cloud
Li, J., Bai, Y., & Zaman, N. (2013) · 2013 12th IEEE International Conference on Trust, Security and Privacy in Computing and Communications · doi:10.1109/trustcom.2013.66 · Cited by 36
Ramkumar, M. (2016) · Strategic Outsourcing: An International Journal · doi:10.1108/so-12-2015-0030 · Cited by 21
Renault, B. Y., Agumba, J. N., & Ansary, N. (2020) · Journal of Construction in Developing Countries · doi:10.21315/jcdc2020.25.2.4 · Cited by 6
Metadata
- Authors
- Zeng, J., An, M., & Smith, N. J.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2007-08
- Volume
- 25
- Issue
- 6
- Pages
- 589-600
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2027859047
- Cited by
- 537
- References
- 15
- FWCI
- 20.51
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.