The effectiveness in managing a group of multiple projects: Factors of influence and measurement criteria
The DOI matches its Crossref record; 32 of the 32 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
Qualitative Data Analysis: An Expanded Sourcebook
(1994) · Journal of Environmental Psychology · doi:10.1016/s0272-4944(05)80231-2 · Cited by 48,420 · cited 1×
“Cross-case analyses were also conducted to analyze the consistency and inconsistency of the data across cases and to ensure the construct and internal validity of the findings [24–26].”
Building Theories from Case Study Research
Eisenhardt, K. M. (1989) · The Academy of Management Review · doi:10.2307/258557 · Cited by 17,455
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Product development: Past research, present findings and future directions
Brown, S. L., & Eisenhardt, K. M. (1995) · The Academy of Management Review · doi:10.2307/258850 · Cited by 3,777 · cited 2×
“The uniqueness of this finding is not on the evidence showing that the ability of project managers influences the effectiveness in project management, since it has been extensively researched [45,46].”
BackgroundLinking the Balanced Scorecard to Strategy
Kaplan, R. S., & Norton, D. P. (1996) · California Management Review · doi:10.2307/41165876 · Cited by 1,815 · cited 1×
“In corroborating this finding with the literature, we found that our finding support the literature on balanced scorecard [50–52].”
ResultProject Success: A Multidimensional Strategic Concept
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001) · Long Range Planning · doi:10.1016/s0024-6301(01)00097-8 · Cited by 1,222 · cited 1×
“This finding also support the literature on project success [53].”
ResultExecutive control of cognitive processes in task switching
Rubinstein, J. S., Meyer, D. E., & Evans, J. E. (2001) · Journal of Experimental Psychology: Human Perception and Performance · doi:10.1037//0096-1523.27.4.763 · Cited by 1,207 · cited 2×
“[22] call this lost time ‘‘switchover time cost”).”
BackgroundFROM CHIMNEYS TO CROSS-FUNCTIONAL TEAMS: DEVELOPING AND VALIDATING A DIAGNOSTIC MODEL.
DENISON, D. R., HART, S. L., & KAHN, J. A. (1996) · Academy of Management Journal · doi:10.2307/256721 · Cited by 483
Managing high-technology programs and projects
Archibald, R. D. (1976) · Cited by 422
Human resource management in the project-oriented company: A review
Huemann, M., Keegan, A., & Turner, J. R. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.10.001 · Cited by 362 · cited 1×
“[55] concluded that more resource management research is needed in project-oriented organizations.”
BackgroundAn exploration of project management office features and their relationship to project performance
Dai, C. X., & Wells, W. G. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.04.001 · Cited by 351 · cited 1×
“When the finding is corroborated with the project management office (PMO) literature, we found a research suggesting that a feature of the PMO in promoting project management standards and methods is highly correlated with project performance [44].”
ResultCompeting with flexible lateral organizations
Galbraith, J. R. (1993) · Cited by 334
Standardized project management may increase development projects success
Milosevic, D., & Patanakul, P. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.11.002 · Cited by 327
Self-citationCommunication Flows in International Product Innovation Teams
Moenaert, R. K., Caeldries, F., Lievens, A., & Wauters, E. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(00)00048-5 · Cited by 250 · cited 1×
“With the extensive literature on team, this finding may not be unique to reveal that commitment, communication, teamwork, and reward for performance have some impacts on team effectiveness [31–37].”
BackgroundCommitment, coordination, competence and the iron triangle
Jha, K. N., & Iyer, K. C. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.009 · Cited by 243 · cited 1×
“With the extensive literature on team, this finding may not be unique to reveal that commitment, communication, teamwork, and reward for performance have some impacts on team effectiveness [31–37].”
BackgroundMilis, K., & Mercken, R. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00060-7 · Cited by 222 · cited 1×
“It fits into the internal business perspective and customer perspective categories [51,52].”
BackgroundKouzes, J. M., & Posner, B. Z. (1998) · Scholar Commons (Santa Clara University) · Cited by 216
Maltz, E. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(99)00030-2 · Cited by 198
Human resource allocation in a multi-project R&D environment
Hendriks, M. M., Voeten, B. B., & Kroep, L. L. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00026-x · Cited by 195 · cited 3×
“Inputs Organization capacity: [11,12] Project manager assignments: [13–15] Resource allocation: [8,16–18] Success factors: [9] The majority of the literature investigate MPM on a functional level, MGMP is not a unit of analysis”
BackgroundMethodBest Practices for Managing R&D Portfolios
Cooper, R. G., Edgett, S. J., & Kleinschmidt, E. J. (1998) · Research-Technology Management · doi:10.1080/08956308.1998.11671219 · Cited by 175 · cited 1×
“Based on the balanced portfolio, some projects will be strategic projects and others will be operation projects [5,27].”
BackgroundManaging multiple engineering projects in a manufacturing support environment
Fricke, S. E., & Shenbar, A. J. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.846792 · Cited by 158 · cited 10×
“In manufacturing support environments, a study found that assigning two to three ‘‘major” projects to an engineering project manager is an effective maximization of his/her productivity [9].”
BackgroundInfluentialOptimal Allocation of Project Management Resources for Achieving Success
Jaselskis, E. J., & Ashley, D. B. (1991) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1991)117:2(321 · Cited by 158
Team Leadership Effectiveness in Technology-Based Project Environments
Thamhain, H. J. (2004) · Project Management Journal · doi:10.1177/875697280403500405 · Cited by 153 · cited 1×
“The uniqueness of this finding is not on the evidence showing that the ability of project managers influences the effectiveness in project management, since it has been extensively researched [45,46].”
BackgroundNobeoka, K., & Cusumano, M. A. (1995) · IEEE Transactions on Engineering Management · doi:10.1109/17.482089 · Cited by 112 · cited 1×
“Multiple project management (MPM) has taken hold in organizations as they seek to improve management and efficiency [1,2], coordinate interrelated projects to cut cycle time [3], and transfer technology between projects to outperform the competition [4].”
BackgroundStrategies of Effective New Product Team Leaders
Jassawalla, A. R., & Sashittal, H. C. (2000) · California Management Review · doi:10.2307/41166031 · Cited by 109
A Decision Support Model for Project Manager Assignments
Patanakul, P., Milosevic, D. Z., & Anderson, T. R. (2007) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2007.900797 · Cited by 71 · cited 2×
“[14,15] asserted that an effective assignment process should consist of the steps toward the understanding of project priority, the matching between competencies of multiproject managers and project requirements, and the recognizing of the organizational/ personal limitations.”
BackgroundMethodSelf-citationEnterprise Resource Planning (ERP): A Postimplementation Cross-Case Analysis
Muscatello, J. R., & Parente, D. H. (2006) · Information Resources Management Journal · doi:10.4018/irmj.2006070105 · Cited by 63 · cited 1×
“However, research found that ERP implementation is a complex and expensive process [28,56].”
BackgroundTullett, A. D. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(96)84511-x · Cited by 49 · cited 3×
“In addition, multiple-project managers should possess soft skills to be able to simultaneously lead multiple project teams [9,21,23].”
BackgroundAssigning new product projects to multiple-project managers: What market leaders do
Patanakul, P., & Milosevic, D. Z. (2006) · The Journal of High Technology Management Research · doi:10.1016/j.hitech.2006.05.008 · Cited by 49 · cited 3×
“[14,15] asserted that an effective assignment process should consist of the steps toward the understanding of project priority, the matching between competencies of multiproject managers and project requirements, and the recognizing of the organizational/ personal limitations.”
BackgroundMethodResultSelf-citation(2002) · Routledge eBooks · doi:10.4324/9780203909263 · Cited by 38
Abdel‐Hamid, T. K., Sengupta, K. C., & Hardebeck, M. J. (1994) · IEEE Transactions on Engineering Management · doi:10.1109/17.293378 · Cited by 26 · cited 1×
“With the extensive literature on team, this finding may not be unique to reveal that commitment, communication, teamwork, and reward for performance have some impacts on team effectiveness [31–37].”
Background
Cited by
Meskendahl, S. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.06.007 · Cited by 423
Project portfolio management in practice and in context
Martinsuo, M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.10.013 · Cited by 287
Jonas, D. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.07.002 · Cited by 220
“Besides the project portfolio manager and with particular regards to the multi-project level, so far the multiple-project manager (Patanakul and Milosevic, 2009), the program manager (Blomquist and Müller, 2006) and several kinds of (multi-) project management offices (Aubry et al., 2007, 2008,…”
BackgroundTowards an organizational culture framework in construction
Cheung, S. O., Wong, P. S. P., & Wu, A. W. Y. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.014 · Cited by 174
“Likewise, similar project management issue will arise when a project manager needs to manage a group of organizations displaying different cultural characteristics (Patanakul and Milosevic, 2009).”
Background
Metadata
- Authors
- Patanakul, P., & Milosevic, D.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2009-04
- Volume
- 27
- Issue
- 3
- Pages
- 216-233
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2168031966
- Cited by
- 159
- References
- 32
- FWCI
- 9.23
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.