Project management and its effects on project success: Cross-country and cross-industry comparisons
The DOI matches its Crossref record; 79 of the 79 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The use of partial least squares path modeling in international marketing
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009) · Advances in International Marketing · doi:10.1108/s1474-7979(2009)0000020014 · Cited by 10,926
Tenenhaus, M., Vinzi, V. E., Chatelin, Y.-M., & Lauro, C. (2005) · Computational Statistics & Data Analysis · doi:10.1016/j.csda.2004.03.005 · Cited by 6,312 · cited 5×
“The significances were estimated by bootstrap directly on the SmartPLS software, using 1000 resamplings (Tenenhaus et al., 2005). cts on project success: Cross-country and cross-industry comparisons, Int.”
BackgroundMethodInfluentialJarvis, C. B., MacKenzie, S. B., & Podsakoff, P. M. (2003) · Journal of Consumer Research · doi:10.1086/376806 · Cited by 5,807 · cited 1×
“The construct of PM enablers was modeled as a formative latent variable (Jarvis et al., 2003), whereas PM areas were designed as first-order reflective because they are designed cts on project success: Cross-country and cross-industry comparisons, Int.”
MethodA guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837 · cited 4×
“Other authors corroborate and include training and education issues as key factors in PM (Cooke-Davies, 2002; Dai and Wells, 2004; Takey and Carvalho, 2015).”
BackgroundResultInfluentialMacKenzie, S. B., Podsakoff, P. M., & Jarvis, C. B. (2005) · Journal of Applied Psychology · doi:10.1037/0021-9010.90.4.710 · Cited by 1,669 · cited 1×
“…to evaluate the possibility of modeling success as a latent variable, showing that these variables have very low correlations (see Table 6), which means that it is not feasible to model success as a reflective latent variable (Henseler et al., 2009; Mackenzie et al., 2005; Tenenhaus et al., 2005).”
BackgroundA Retrospective look at our Evolving Understanding of Project Success
Jugdev, K., & Müller, R. (2005) · Project Management Journal · doi:10.1177/875697280503600403 · Cited by 907 · cited 1×
“However, various studies have investigated new dimensions of project success (Carvalho and Rabechini Junior, 2015; Samset, 1998; Shenhar and Dvir, 2007; Barber, 2004; Ika, 2009; Jugdev and Muller, 2005).”
BackgroundAn integrated framework for project portfolio selection
Archer, N. P., & Ghasemzadeh, F. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00032-5 · Cited by 856 · cited 4×
“The most-often utilized project performance metrics are those related to obtaining the initially planned schedule and cost values at the end of the project (Gray, 2001; Katz and Allen, 1985; Larson and Gobeli, 1989; Ling, 2004; White and Fortune, 2002), in which—as expected—there is a consensus on the financial issues…”
BackgroundMethodInfluential
Cited by
Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.008 · Cited by 294
Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.08.006 · Cited by 289
Carvalho, M. M., & Rabechini, R. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.02.018 · Cited by 255
Self-citationPospieszny, P., Czarnacka-Chrobot, B., & Kobylinski, A. (2018) · Journal of Systems and Software · doi:10.1016/j.jss.2017.11.066 · Cited by 247
Linking trust and collaboration in project teams to project management success
Bond-Barnard, T. J., Fletcher, L., & Steyn, H. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-06-2017-0068 · Cited by 208
“Even though significant research has been conducted on project success factors, many projects continue to fail, as evidenced by several studies (Buchanan, Dai and Wells in de Carvalho et al., 2015; The Standish Group International, 2009; White and Fortune, 2002).”
BackgroundInfluentialCost and time project management success factors for information systems development projects
Sanchez, O. P., Terlizzi, M. A., & de Moraes, H. R. D. O. C. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.09.007 · Cited by 173
The challenge of introducing sustainability into project management function: multiple-case studies
Martens, M. L., & Carvalho, M. M. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.12.039 · Cited by 160
Self-citation
Metadata
- Authors
- Carvalho, M. M. D., Patah, L. A., & de Souza Bido, D.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2015-10
- Volume
- 33
- Issue
- 7
- Pages
- 1509-1522
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2010852969
- Cited by
- 243
- References
- 79
- FWCI
- 25.77
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.