Project management and its effects on project success: Cross-country and cross-industry comparisons
The DOI matches its Crossref record; 79 of the 79 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The use of partial least squares path modeling in international marketing
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009) · Advances in International Marketing · doi:10.1108/s1474-7979(2009)0000020014 · Cited by 10,926
Tenenhaus, M., Vinzi, V. E., Chatelin, Y.-M., & Lauro, C. (2005) · Computational Statistics & Data Analysis · doi:10.1016/j.csda.2004.03.005 · Cited by 6,312 · cited 5×
“The significances were estimated by bootstrap directly on the SmartPLS software, using 1000 resamplings (Tenenhaus et al., 2005). cts on project success: Cross-country and cross-industry comparisons, Int.”
BackgroundMethodInfluentialJarvis, C. B., MacKenzie, S. B., & Podsakoff, P. M. (2003) · Journal of Consumer Research · doi:10.1086/376806 · Cited by 5,807 · cited 1×
“The construct of PM enablers was modeled as a formative latent variable (Jarvis et al., 2003), whereas PM areas were designed as first-order reflective because they are designed cts on project success: Cross-country and cross-industry comparisons, Int.”
MethodA guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837 · cited 4×
“Other authors corroborate and include training and education issues as key factors in PM (Cooke-Davies, 2002; Dai and Wells, 2004; Takey and Carvalho, 2015).”
BackgroundResultInfluentialMacKenzie, S. B., Podsakoff, P. M., & Jarvis, C. B. (2005) · Journal of Applied Psychology · doi:10.1037/0021-9010.90.4.710 · Cited by 1,669 · cited 1×
“…to evaluate the possibility of modeling success as a latent variable, showing that these variables have very low correlations (see Table 6), which means that it is not feasible to model success as a reflective latent variable (Henseler et al., 2009; Mackenzie et al., 2005; Tenenhaus et al., 2005).”
BackgroundA Retrospective look at our Evolving Understanding of Project Success
Jugdev, K., & Müller, R. (2005) · Project Management Journal · doi:10.1177/875697280503600403 · Cited by 907 · cited 1×
“However, various studies have investigated new dimensions of project success (Carvalho and Rabechini Junior, 2015; Samset, 1998; Shenhar and Dvir, 2007; Barber, 2004; Ika, 2009; Jugdev and Muller, 2005).”
BackgroundAn integrated framework for project portfolio selection
Archer, N. P., & Ghasemzadeh, F. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00032-5 · Cited by 856 · cited 4×
“The most-often utilized project performance metrics are those related to obtaining the initially planned schedule and cost values at the end of the project (Gray, 2001; Katz and Allen, 1985; Larson and Gobeli, 1989; Ling, 2004; White and Fortune, 2002), in which—as expected—there is a consensus on the financial issues…”
BackgroundMethodInfluentialOne Size Does Not Fit All Projects: Exploring Classical Contingency Domains
Shenhar, A. J. (2001) · Management Science · doi:10.1287/mnsc.47.3.394.9772 · Cited by 821 · cited 3×
“The findings confirm the descriptions in the literature highlighting the impact of complexity (Cleland and Ireland, 2006; Cooke-Davies, 2002; Shenhar, 2001; Shenhar and Dvir, 1996; Shenhar et al., 2002; White and Fortune, 2002) and industry sectors on project performance (Patterson et al., 1999;…”
BackgroundResultProject Success as a Topic in Project Management Journals
Ika, L. A. (2009) · Project Management Journal · doi:10.1002/pmj.20137 · Cited by 783 · cited 2×
“(Aubry and Hobbs, 2010; Ika, 2009; Thomas and Mullaly, 2008).”
BackgroundProject Management: Strategic Design and Implementation
Cleland, D. I. (1990) · Cited by 744
Current practice in project management — an empirical study
White, D., & Fortune, J. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00029-6 · Cited by 705 · cited 6×
“The most-often utilized project performance metrics are those related to obtaining the initially planned schedule and cost values at the end of the project (Gray, 2001; Katz and Allen, 1985; Larson and Gobeli, 1989; Ling, 2004; White and Fortune, 2002), in which—as expected—there is a consensus on the financial issues…”
BackgroundResultInfluentialFundamentos de Métodos de Pesquisa em Administração
Hair, J., Babin, B., Money, A., & Samouel, P. (2005) · CentAUR (University of Reading) · Cited by 662
Reinventing Project Management: The Diamond Approach to Successful Growth and Innovation
Markham, S. K. (2007) · Research-Technology Management · Cited by 658
Information Technology Project Management
Schwalbe, K. (1999) · Cited by 654
Toor, S.-U.-R., & Ogunlana, S. O. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.05.005 · Cited by 619 · cited 1×
“It is a multidimensional construct (Carvalho and Rabechini Junior, 2015; Samset, 1998; Shenhar and Dvir, 2007) and different stakeholder groups have their own perceptions of project success (Chou and Yang, 2012; Davis, 2014, Toor and Ogunlana, 2010; de Vries, 2009).”
BackgroundToward a typological theory of project management
Shenhar, A. J., & Dvir, D. (1996) · Research Policy · doi:10.1016/0048-7333(95)00877-2 · Cited by 614 · cited 3×
“The findings confirm the descriptions in the literature highlighting the impact of complexity (Cleland and Ireland, 2006; Cooke-Davies, 2002; Shenhar, 2001; Shenhar and Dvir, 1996; Shenhar et al., 2002; White and Fortune, 2002) and industry sectors on project performance (Patterson et al.”
BackgroundResultFactors influencing project success: the impact of human resource management
Belout, A., & Gauvreau, C. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00003-6 · Cited by 566 · cited 3×
“As mentioned before, several studies have attempted to analyze how to measure project success (Belout and Gauvreau, 2004; Berssaneti and Carvalho, 2015; Besner and Hobbs, 2006; Bizan, 2003; Carvalho and Rabechini Junior, 2015; Dvir et al., 2003; Gray, 2001; Kendra and Taplin, 2004; Lipovetsky et al., 2005; Raz et al.,…”
BackgroundLe-Hoai, L., Lee, Y. D., & Lee, J. Y. (2008) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-008-0367-7 · Cited by 560 · cited 1×
“Le-Hoai et al. (2008) also study Vietnam construction industry and point out the five most important causes of delay and cost overruns, and compare it with other countries and identify that the results are more similar to developing economies.”
ResultDifferent stakeholder groups and their perceptions of project success
Davis, K. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.02.006 · Cited by 532 · cited 1×
“It is a multidimensional construct (Carvalho and Rabechini Junior, 2015; Samset, 1998; Shenhar and Dvir, 2007) and different stakeholder groups have their own perceptions of project success (Chou and Yang, 2012; Davis, 2014, Toor and Ogunlana, 2010; de Vries, 2009).”
BackgroundAn empirical analysis of the relationship between project planning and project success
Dvir, D., Raz, T., & Shenhar, A. J. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00012-1 · Cited by 498 · cited 2×
“Studies conducted over the last decade have aimed to analyze project success based on a variety of dimensions (Belout and Gauvreau, 2004; Besner and Hobbs, 2006; Bizan, 2003; Dvir et al., 2003; Gray, 2001; Kendra and Taplin, 2004; Lipovetsky, 2005; Raz et al., 2002; Repiso et al., 2007).”
Background(2007) · Cited by 478
Managing high-technology programs and projects
Archibald, R. D. (1976) · Cited by 422
Assessing Project Management Maturity
Ibbs, C. W., & Kwak, Y. H. (2000) · Project Management Journal · doi:10.1177/875697280003100106 · Cited by 411 · cited 6×
“Although most of the models in the PM area have been created over the last two decades, several maturity models already exist, such as the Capability Maturity Model (CMM) and Capability Maturity Model Integration (CMMI) (SEI, 2006), the Project Management Process Maturity Model (Ibbs and Kwak, 2000), the Project Manag…”
BackgroundResultInfluentialGrabher, G. (2004) · European Urban and Regional Studies · doi:10.1177/0969776404041417 · Cited by 409 · cited 1×
“These two variables relate more to the soft side of PM that involves managing stakeholders' roles, individual skills and capabilities and the notion of project ecology (Grabher, 2004).”
BackgroundSuccess Criteria and Factors for International Development Projects: A Life-Cycle-Based Framework
Khang, D. B., & Moe, T. L. (2008) · Project Management Journal · doi:10.1002/pmj.20034 · Cited by 394 · cited 1×
“…given in studies related to international development (ID) projects (Ahsan and Gunawan, 2010; Prasad et al., 2013) and suggests that cultural issues of the host country should be considered, including aspects related to projects being more susceptible to political corruption (Khang and Moe, 2008).”
BackgroundDo project managers practice what they preach, and does it matter to project success?
Papke-Shields, K. E., Beise, C., & Quan, J. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.002 · Cited by 393 · cited 2×
“Although it represents just part of the project success discussion, it is still considered central to the measurement of project success (Papke-Shields et al., 2010; Berssaneti and Carvalho, 2015).”
BackgroundRisk management, project success, and technological uncertainty
Raz, T., Shenhar, A. J., & Dvir, D. (2002) · R&D Management · doi:10.1111/1467-9310.00243 · Cited by 377 · cited 5×
“Studies conducted over the last decade have aimed to analyze project success based on a variety of dimensions (Belout and Gauvreau, 2004; Besner and Hobbs, 2006; Bizan, 2003; Dvir et al., 2003; Gray, 2001; Kendra and Taplin, 2004; Lipovetsky, 2005; Raz et al., 2002; Repiso et al., 2007).”
BackgroundResultInfluentialAnalysis of cost and schedule performance of international development projects
Ahsan, K., & Gunawan, I. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.03.005 · Cited by 375 · cited 2×
“However, as Ahsan and Gunawan (2010) suggest, ID projects are different from traditional business projects, and make traditional project management tools in the developed world less appropriate.”
BackgroundAn exploration of project management office features and their relationship to project performance
Dai, C. X., & Wells, W. G. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.04.001 · Cited by 351
Impact of risk management on project performance: the importance of soft skills
Carvalho, M. M. D., & Rabechini Junior, R. (2015) · International Journal of Production Research · doi:10.1080/00207543.2014.919423 · Cited by 324
Self-citationSignificance of project management structure on development success
Larson, E. W., & Gobeli, D. H. (1989) · IEEE Transactions on Engineering Management · doi:10.1109/17.18828 · Cited by 320 · cited 3×
“The most-often utilized project performance metrics are those related to obtaining the initially planned schedule and cost values at the end of the project (Gray, 2001; Katz and Allen, 1985; Larson and Gobeli, 1989; Ling, 2004; White and Fortune, 2002), in which—as expected—there is a consensus on the financial issues…”
BackgroundJugdev, K., & Thomas, J. L. (2002) · Project Management Journal · doi:10.1177/875697280203300402 · Cited by 284
Refining the search for project success factors: a multivariate, typological approach
Shenhar, A. J., Tishler, A., Dvir, D., Lipovetsky, S., & Lechler, T. (2002) · R&D Management · doi:10.1111/1467-9310.00244 · Cited by 279 · cited 3×
“…the descriptions in the literature highlighting the impact of complexity (Cleland and Ireland, 2006; Cooke-Davies, 2002; Shenhar, 2001; Shenhar and Dvir, 1996; Shenhar et al., 2002; White and Fortune, 2002) and industry sectors on project performance (Patterson et al., 1999; Raz et al., 2002).”
BackgroundResultJiang, J. J., Klein, G., Hwang, H.-G., Huang, J., & Hung, S.-Y. (2004) · Information & Management · doi:10.1016/s0378-7206(03)00052-1 · Cited by 261 · cited 4×
“…(IT) industry, specially related to the CMM and CMMI models, have concluded that these models tend to develop higher quality software, a faster development cycle, higher productivity (Dion, 1993), better organizational performance (Hersleb, 1996) and increased project success (Jiang et al., 2004).”
BackgroundInfluentialPROJECT PERFORMANCE AND THE LOCUS OF INFLUENCE IN THE R&D MATRIX.
Katz, R., & Allen, T. J. (1985) · Academy of Management Journal · doi:10.2307/256062 · Cited by 257
Grant, K. P., & Pennypacker, J. S. (2006) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.861802 · Cited by 256 · cited 3×
“However, the evidence for that thesis is limited and inconclusive (Grant and Pennypacker, 2006a, 2006b; Ibbs and Kwak, 2000a, 2000b; Jiang et al., 2004; Jugdev et al., 2002; Mullay, 2006; Thomas and Mullaly, 2007; Yazici, 2009).”
BackgroundProject Success: A Cultural Framework
Kendra, K., & Taplin, L. J. (2004) · Project Management Journal · doi:10.1177/875697280403500104 · Cited by 249 · cited 2×
“Studies conducted over the last decade have aimed to analyze project success based on a variety of dimensions (Belout and Gauvreau, 2004; Besner and Hobbs, 2006; Bizan, 2003; Dvir et al., 2003; Gray, 2001; Kendra and Taplin, 2004; Lipovetsky, 2005; Raz et al., 2002; Repiso et al., 2007).”
BackgroundProcess improvement and the corporate balance sheet
Dion, R. (1993) · IEEE Software · doi:10.1109/52.219618 · Cited by 227 · cited 1×
“…(IT) industry, specially related to the CMM and CMMI models, have concluded that these models tend to develop higher quality software, a faster development cycle, higher productivity (Dion, 1993), better organizational performance (Hersleb, 1996) and increased project success (Jiang et al., 2004).”
BackgroundIdentification of variables that impact project success in Brazilian companies
Berssaneti, F. T., & Carvalho, M. M. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.002 · Cited by 225 · cited 3×
“As mentioned before, several studies have attempted to analyze how to measure project success (Belout and Gauvreau, 2004; Berssaneti and Carvalho, 2015; Besner and Hobbs, 2006; Bizan, 2003; Carvalho and Rabechini Junior, 2015; Dvir et al., 2003; Gray, 2001; Kendra and Taplin, 2004; Lipovetsky et al., 2005; Raz et al.,…”
BackgroundSelf-citationZwikael, O., & Ahn, M. (2011) · Risk Analysis · doi:10.1111/j.1539-6924.2010.01470.x · Cited by 215 · cited 3×
“Although some studies (Raz et al., 2002; Zwikael and Ahn, 2011) have found significant effect of industries, other studies (Carvalho and Rabechini Junior, 2015; Pennypacker and Grant, 2003; Ibbs and Kwak, 2000a, 2000b; Pennypacker and Grant, 2003) were statistically inconclusive.”
BackgroundResultThe Perceived Value and Potential Contribution of Project Management Practices to Project Success
Besner, C., & Hobbs, B. (2006) · Project Management Journal · doi:10.1177/875697280603700305 · Cited by 214 · cited 3×
“As mentioned before, several studies have attempted to analyze how to measure project success (Belout and Gauvreau, 2004; Berssaneti and Carvalho, 2015; Besner and Hobbs, 2006; Bizan, 2003; Carvalho and Rabechini Junior, 2015; Dvir et al., 2003; Gray, 2001; Kendra and Taplin, 2004; Lipovetsky et al., 2005; Raz et al.,…”
BackgroundThe Role of Project Management Maturity and Organizational Culture in Perceived Performance
Yazici, H. J. (2009) · Project Management Journal · doi:10.1002/pmj.20121 · Cited by 209 · cited 3×
“However, the evidence for that thesis is limited and inconclusive (Grant and Pennypacker, 2006a, 2006b; Ibbs and Kwak, 2000a, 2000b; Jiang et al., 2004; Jugdev et al., 2002; Mullay, 2006; Thomas and Mullaly, 2007; Yazici, 2009).”
BackgroundCross-cultural management in multinational project groups
Chevrier, S. (2003) · Journal of World Business · doi:10.1016/s1090-9516(03)00007-5 · Cited by 209 · cited 1×
“Some studies focus more on the impact of culture (Chevrier, 2003) on international projects than on the impact of the stage of PM methodology development in particular countries.”
BackgroundKoretz, D. M. (2008) · Cited by 190
Thomas, J. L., & Mullaly, M. (2007) · Project Management Journal · doi:10.1002/pmj.20007 · Cited by 188 · cited 1×
“However, the evidence for that thesis is limited and inconclusive (Grant and Pennypacker, 2006a, 2006b; Ibbs and Kwak, 2000a, 2000b; Jiang et al., 2004; Jugdev et al., 2002; Mullay, 2006; Thomas and Mullaly, 2007; Yazici, 2009).”
BackgroundBarclay, C., & Osei-Bryson, K.-M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.11.025 · Cited by 180
Organisational climate and project success
Gray, R. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00060-5 · Cited by 178 · cited 3×
“…utilized project performance metrics are those related to obtaining the initially planned schedule and cost values at the end of the project (Gray, 2001; Katz and Allen, 1985; Larson and Gobeli, 1989; Ling, 2004; White and Fortune, 2002), in which—as expected—there is a consensus on the…”
BackgroundMethodA Fresh Look at the Contribution of Project Management to Organizational Performance
Aubry, M., & Hobbs, B. (2010) · Project Management Journal · doi:10.1002/pmj.20213 · Cited by 177 · cited 1×
“(Aubry and Hobbs, 2010; Ika, 2009; Thomas and Mullaly, 2008).”
A process framework for theoretically grounded prescriptive research in the project management field
Ahlemann, F., Arbi, F. E., Kaiser, M. G., & Heck, A. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.03.008 · Cited by 167 · cited 1×
“The absence of effect of the PM areas variable with respect to the three performance measures studied is consistent with Ahlemann et al. (2013), who suggest that the prescriptive characteristics of PM approaches lead to numerous problems, such as non-acceptance in practice, limited effectiveness…”
ResultA systematic survey of CMM experience and results
Herbsleb, J. D., & Goldenson, D. R. (1996) · doi:10.5555/227726.227791 · Cited by 157
The effect of critical success factors on IT governance performance
Nfuka, E. N., & Rusu, L. (2011) · Industrial Management & Data Systems · doi:10.1108/02635571111182773 · Cited by 157
Project Management Knowledge and Effects on Construction Project Outcomes: An Empirical Study
Chou, J., & Yang, J.-G. (2012) · Project Management Journal · doi:10.1002/pmj.21293 · Cited by 154 · cited 5×
“Chou and Yang (2012) analyze the impact of the PMBoK guide on project performance, customer satisfaction and project success in the civil construction industry in Taiwan and conclude that it is convenient to adopt PMBoK practices in this industry.”
BackgroundMethodInfluentialProjects and firms as discordant complements: organisational learning in the Munich software ecology
Ibert, O. (2004) · Research Policy · doi:10.1016/j.respol.2004.08.010 · Cited by 151 · cited 1×
“Additionally, PM can make organizations less vulnerable to the loss of tacit knowledge stored in individual memories (Ibert, 2004).”
BackgroundCompetency mapping in project management: An action research study in an engineering company
Takey, S. M., & Carvalho, M. M. D. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.10.013 · Cited by 141 · cited 1×
“Other authors corroborate and include training and education issues as key factors in PM (Cooke-Davies, 2002; Dai and Wells, 2004; Takey and Carvalho, 2015).”
Self-citationBenchmarking the management of projects: a review of current thinking
Barber, E. (2003) · International Journal of Project Management · doi:10.1016/j.ijproman.2003.08.001 · Cited by 120 · cited 1×
“However, various studies have investigated new dimensions of project success (Carvalho and Rabechini Junior, 2015; Samset, 1998; Shenhar and Dvir, 2007; Barber, 2004; Ika, 2009; Jugdev and Muller, 2005).”
BackgroundProject management assets and their relationship with the project management capability of the firm
Jugdev, K., Mathur, G., & Fung, T. S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.01.009 · Cited by 114 · cited 1×
“Jugdev et al. (2007) corroborate and highlight the relationship between PM and a firm's capability based on the resource-based view.”
BackgroundInformation Technology Project Management
Kelkar, S. A., & Kelkar (2007) · Cited by 111
Longitudinal Analysis of Project Management Maturity
Mullaly, M. (2006) · Project Management Journal · doi:10.1177/875697280603700307 · Cited by 108
Knowledge sharing and strategic fit in integrated product development proejcts: An empirical study
Hong, P. C., Doll, W. J., Revilla, E., & Nahm, A. Y. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2011.04.004 · Cited by 107 · cited 2×
“Plaza and Rohlf (2008) go further and suggest that the choice of a training strategy has a significant impact on project cost performance whereas Hong et al. (2011) emphasize the impact of learning and knowledge sharing on performance.”
BackgroundMethodInfluentialSage, D. J., Dainty, A., & Brookes, N. J. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.005 · Cited by 106 · cited 3×
“Project success has been the target of fruitful discussions in the project management literature (Carvalho and Rabechini Junior, 2015) that reveals the social and political contextualization of performance in project management (Sage et al., 2014).”
BackgroundResultInfluentialMcHugh, O., & Hogan, M. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.05.001 · Cited by 101 · cited 4×
“Other studies investigate the impact of the adoption of PM practices on performance (Besner and Hobbs, 2012, 2013; Chou and Yang, 2012; McHugh and Hogan, 2011), and all of the referenced studies are based on the structure of the PMBoK, fourth edition (PMI, 2008).”
BackgroundMethodInfluentialAn investigation of the role of communication in IT projects
de Carvalho, M. M. (2013) · International Journal of Operations & Production Management · doi:10.1108/ijopm-11-2011-0439 · Cited by 97 · cited 1×
“However, Carvalho (2014) highlights the importance of soft skills in PM, especially related to communication and stakeholders' management and skills.”
BackgroundSelf-citationModelling IT projects success: Emerging methodologies reviewed
Rodriguez-Repiso, L., Setchi, R., & wrong, A. I. (2007) · Technovation · doi:10.1016/j.technovation.2006.12.006 · Cited by 91 · cited 2×
“Studies conducted over the last decade have aimed to analyze project success based on a variety of dimensions (Belout and Gauvreau, 2004; Besner and Hobbs, 2006; Bizan, 2003; Dvir et al., 2003; Gray, 2001; Kendra and Taplin, 2004; Lipovetsky, 2005; Raz et al., 2002; Repiso et al., 2007).”
BackgroundHow project managers can better control the performance of design-build projects
Ling, F. Y. Y. (2003) · International Journal of Project Management · doi:10.1016/j.ijproman.2003.09.003 · Cited by 86 · cited 1×
“…to obtaining the initially planned schedule and cost values at the end of the project (Gray, 2001; Katz and Allen, 1985; Larson and Gobeli, 1989; Ling, 2004; White and Fortune, 2002), in which—as expected—there is a consensus on the financial issues involved (Archer and Ghasemzadeh, 1999; Patah…”
BackgroundChou, J., Irawan, N., & Pham, A. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000766 · Cited by 83 · cited 1×
“More recently, Chou et al. (2013) focus on construction engineering projects and try to identify cross-country (Taiwan, Indonesia, and Vietnam) similarities and differences considering the contribution of the Project Management Body of Knowledge (PMBOK) to success.”
BackgroundThe determinants of success of R&D projects: evidence from American–Israeli research alliances
Bizan, O. (2003) · Research Policy · doi:10.1016/s0048-7333(03)00044-1 · Cited by 73 · cited 3×
“As mentioned before, several studies have attempted to analyze how to measure project success (Belout and Gauvreau, 2004; Berssaneti and Carvalho, 2015; Besner and Hobbs, 2006; Bizan, 2003; Carvalho and Rabechini Junior, 2015; Dvir et al., 2003; Gray, 2001; Kendra and Taplin, 2004; Lipovetsky et al., 2005; Raz et al.,…”
BackgroundPlaza, M., & Rohlf, K. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.05.005 · Cited by 65 · cited 1×
“Plaza and Rohlf (2008) go further and suggest that the choice of a training strategy has a significant impact on project cost performance whereas Hong et al. (2011) emphasize the impact of learning and knowledge sharing on performance.”
BackgroundOrganizational structuring and project team structuring in integrated product development project
Rauniar, R., & Rawski, G. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2011.11.009 · Cited by 60 · cited 1×
“Project manager is a critical success factor (CSF) in a project (Archibald, 2003), providing direction, goals, motivational support and assistance in resolving interpersonal and organizational issues (Rauniar and Rawski, 2012).”
BackgroundSharma, A., & Gupta, A. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.05.003 · Cited by 47 · cited 1×
“Most PM approaches have disregarded the soft side of PM (Sharma and Gupta, 2012; Soderlund and Maylor, 2012) in favor of focusing on the hard side, characterized in our study as the PM areas variable.”
MethodAssessing inventory projects from a stakeholder perspective: Results of an empirical study
de Vries, J. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.08.017 · Cited by 42 · cited 1×
“It is a multidimensional construct (Carvalho and Rabechini Junior, 2015; Samset, 1998; Shenhar and Dvir, 2007) and different stakeholder groups have their own perceptions of project success (Chou and Yang, 2012; Davis, 2014, Toor and Ogunlana, 2010; de Vries, 2009).”
BackgroundInformation Technology Project Management to Achieve Efficiency in Brazilian Companies
de Carvalho, M. M., Laurindo, F. J. B., & Pessoa, M. D. P. (2003) · IGI Global eBooks · doi:10.4018/978-1-93177-742-1.ch019 · Cited by 29 · cited 1×
“According to Carvalho et al. (2003), maturity models meet these needs because they systematize project methods, tool packages and methodologies, proposing a continuous improvement model to manage the change between an organization's initial and desired statuses.”
BackgroundSelf-citationManaging Globally with Information Technology
Kamel, S. (2003) · IGI Global eBooks · doi:10.4018/978-1-931777-42-1 · Cited by 18
Critical success factors for configuration management implementation
Ali, U., & Kidd, C. (2013) · Industrial Management & Data Systems · doi:10.1108/02635571311303569 · Cited by 18 · cited 1×
“For Ali and Kidd (2013), one of the top-ranking CSFs for configuration management professionals is certification and training in that area.”
BackgroundDevelopmental project management in emerging countries
Prasad, S., Tata, J., Herlache, L., et al. (2013) · Operations Management Research · doi:10.1007/s12063-013-0078-1 · Cited by 13 · cited 2×
“More attention for cross-country analysis has been given in studies related to international development (ID) projects (Ahsan and Gunawan, 2010; Prasad et al., 2013) and suggests that cultural issues of the host country should be considered, including aspects related to projects being more…”
BackgroundManaging Globally with Information Technology
(2000) · IGI Global eBooks · doi:10.4018/978-1-93177-742-1 · Cited by 12
(1992)
Cited by
Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.008 · Cited by 294
Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.08.006 · Cited by 289
Carvalho, M. M., & Rabechini, R. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.02.018 · Cited by 255
Self-citationPospieszny, P., Czarnacka-Chrobot, B., & Kobylinski, A. (2018) · Journal of Systems and Software · doi:10.1016/j.jss.2017.11.066 · Cited by 247
Linking trust and collaboration in project teams to project management success
Bond-Barnard, T. J., Fletcher, L., & Steyn, H. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-06-2017-0068 · Cited by 208
“Even though significant research has been conducted on project success factors, many projects continue to fail, as evidenced by several studies (Buchanan, Dai and Wells in de Carvalho et al., 2015; The Standish Group International, 2009; White and Fortune, 2002).”
BackgroundInfluential
Metadata
- Authors
- Carvalho, M. M. D., Patah, L. A., & de Souza Bido, D.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2015-10
- Volume
- 33
- Issue
- 7
- Pages
- 1509-1522
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2010852969
- Cited by
- 243
- References
- 79
- FWCI
- 25.77
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.