CoChat

Linking trust and collaboration in project teams to project management success

Open access
Bond-Barnard, Taryn Jane, Fletcher, Lizelle, Steyn, Herman · 2018 · International Journal of Managing Projects in Business
Cited by 208

The DOI matches its Crossref record; 11 of the 11 references it cites were found in a registry or an index.

Abstract

Purpose: The purpose of this paper is to emphasise the importance of high levels of trust and collaboration for increasing the likelihood of project management (PM) success. However, the link between these three constructs remains unclear. Design/methodology/approach: In this study, the authors use structural equation modelling (SEM) based on the findings from an international survey of 151 project practitioners to demonstrate the significance of project team trust and collaboration for increasing the likelihood of PM success. Findings: The results indicate that PM success becomes more likely as the degree of collaboration improves which, in turn, is influenced by an increase in the level of trust between team members. The two factors of PM success are project performance and knowledge integration and innovation. The six factors of the degree of collaboration that were studied are physical proximity, commitment, conflict, coordination, relationships and incentives. The three factors of the level of trust investigated are expectations, knowledge exchange and imported trust. Practical implications: The results of the study are expected to provide insight for project practitioners to increase the likelihood of PM success by taking cognisance of the factors that influence collaboration and trust. The results of the study may also provide insight into teaching and learning in tertiary education, in terms of professionalism and integrity issues. Originality/value: This paper presents a new perspective for investigating PM success. SEM techniques are used to determine the likelihood of PM success by promoting trust and collaboration in the project team. This unique approach highlights the “human factors” that influence perceived PM success which should benefit both researchers and practitioners.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1108/ijmpb-06-2017-0068

Cites

11 of 11 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 11 references

Metadata

Authors
Bond-Barnard, T. J., Fletcher, L., & Steyn, H.
Venue
International Journal of Managing Projects in Business
Publisher
Emerald
Published
2018-04-16
Volume
11
Issue
2
Pages
432-457
ISSN
1753-8378 (ISSN-L)
OpenAlex
W2801850522
Cited by
208
References
11
FWCI
11.19
Type
journal article
Language
en
Open access
hybrid

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Linking trust and collaboration in project teams to project management success. https://app.cochat.ai/papers/10.1108/ijmpb-06-2017-0068
The paper
Bond-Barnard, T. J., Fletcher, L., & Steyn, H. (2018). Linking trust and collaboration in project teams to project management success. International Journal of Managing Projects in Business. https://doi.org/10.1108/ijmpb-06-2017-0068

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.