Project complexity and team-level absorptive capacity as drivers of project management performance
The DOI matches its Crossref record; 78 of the 78 references it cites were found in a registry or an index.
Abstract
Many believe that project complexity reduces project management performance. However, so far research has failed to establish this causal relationship conclusively. We extend research on project complexity by introducing the concept of team-level absorptive capacity and by studying its role as mediator between project complexity and project management success. Applying structural equation modelling to a sample of 285 respondents, we find an unequivocal, direct and positive statistical association between project complexity and delays and overspending. Further, we show that team-level absorptive capacity is critical for successful project management, but also that absorptive capacity can only partially offset the harmful impact of project complexity. Beyond adding to project management theory, the paper contributes to the wider management literature. We establish complexity as an antecedent of absorptive capacity and demonstrate how each dimension of absorptive capacity has unique determinants and outcomes.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Statistical Power Analysis for the Behavioral Sciences
Muller, K. (1989) · Technometrics · doi:10.1080/00401706.1989.10488618 · Cited by 99,167
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003) · Journal of Applied Psychology · doi:10.1037/0021-9010.88.5.879 · Cited by 82,194
Statistical power analysis for the behavioral sciences
(1990) · Computers, Environment and Urban Systems · doi:10.1016/0198-9715(90)90050-4 · Cited by 65,269
A new criterion for assessing discriminant validity in variance-based structural equation modeling
Henseler, J., Ringle, C. M., & Sarstedt, M. (2015) · Journal of the Academy of Marketing Science · doi:10.1007/s11747-014-0403-8 · Cited by 38,459
Absorptive Capacity: A New Perspective on Learning and Innovation
Cohen, W. M., & Levinthal, D. A. (1990) · Administrative Science Quarterly · doi:10.2307/2393553 · Cited by 35,728
A primer on partial least squares structural equation modeling (PLS-SEM)
Leguina, A. (2015) · International Journal of Research & Method in Education · doi:10.1080/1743727x.2015.1005806 · Cited by 18,921
Convergent and discriminant validation by the multitrait-multimethod matrix.
Campbell, D. T., & Fiske, D. W. (1959) · Psychological Bulletin · doi:10.1037/h0046016 · Cited by 17,116
Asymptotic Confidence Intervals for Indirect Effects in Structural Equation Models
Sobel, M. E. (1982) · Sociological Methodology · doi:10.2307/270723 · Cited by 12,810
(2014) · DigitalCommons - Kennesaw State University (Kennesaw State University) · Cited by 12,785
Reconsidering Baron and Kenny: myths and truths about mediation analysis
Zhao, X., Lynch, J. G., & Chen, Q. (2010) · Journal of Consumer Research · doi:10.1086/651257 · Cited by 12,583
Cited by
Zeng, N., Liu, Y., Gong, P., Hertogh, M., & König, M. (2021) · Frontiers of Engineering Management · doi:10.1007/s42524-021-0153-5 · Cited by 300
Khosravi, P., Rezvani, A., & Ashkanasy, N. M. (2020) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.11.001 · Cited by 175
Mapping wastes in complex projects for Lean Product Development
Belvedere, V., Cuttaia, F., Rossi, M., & Stringhetti, L. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.01.008 · Cited by 32
Metadata
- Authors
- Bjorvatn, T., & Wald, A.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2018-08
- Volume
- 36
- Issue
- 6
- Pages
- 876-888
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2803130988
- Cited by
- 206
- References
- 78
- FWCI
- 16.99
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.