Project complexity and team-level absorptive capacity as drivers of project management performance
The DOI matches its Crossref record; 78 of the 78 references it cites were found in a registry or an index.
Abstract
Many believe that project complexity reduces project management performance. However, so far research has failed to establish this causal relationship conclusively. We extend research on project complexity by introducing the concept of team-level absorptive capacity and by studying its role as mediator between project complexity and project management success. Applying structural equation modelling to a sample of 285 respondents, we find an unequivocal, direct and positive statistical association between project complexity and delays and overspending. Further, we show that team-level absorptive capacity is critical for successful project management, but also that absorptive capacity can only partially offset the harmful impact of project complexity. Beyond adding to project management theory, the paper contributes to the wider management literature. We establish complexity as an antecedent of absorptive capacity and demonstrate how each dimension of absorptive capacity has unique determinants and outcomes.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Statistical Power Analysis for the Behavioral Sciences
Muller, K. (1989) · Technometrics · doi:10.1080/00401706.1989.10488618 · Cited by 99,167
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003) · Journal of Applied Psychology · doi:10.1037/0021-9010.88.5.879 · Cited by 82,194
Statistical power analysis for the behavioral sciences
(1990) · Computers, Environment and Urban Systems · doi:10.1016/0198-9715(90)90050-4 · Cited by 65,269
A new criterion for assessing discriminant validity in variance-based structural equation modeling
Henseler, J., Ringle, C. M., & Sarstedt, M. (2015) · Journal of the Academy of Marketing Science · doi:10.1007/s11747-014-0403-8 · Cited by 38,459
Absorptive Capacity: A New Perspective on Learning and Innovation
Cohen, W. M., & Levinthal, D. A. (1990) · Administrative Science Quarterly · doi:10.2307/2393553 · Cited by 35,728
A primer on partial least squares structural equation modeling (PLS-SEM)
Leguina, A. (2015) · International Journal of Research & Method in Education · doi:10.1080/1743727x.2015.1005806 · Cited by 18,921
Convergent and discriminant validation by the multitrait-multimethod matrix.
Campbell, D. T., & Fiske, D. W. (1959) · Psychological Bulletin · doi:10.1037/h0046016 · Cited by 17,116
Asymptotic Confidence Intervals for Indirect Effects in Structural Equation Models
Sobel, M. E. (1982) · Sociological Methodology · doi:10.2307/270723 · Cited by 12,810
(2014) · DigitalCommons - Kennesaw State University (Kennesaw State University) · Cited by 12,785
Reconsidering Baron and Kenny: myths and truths about mediation analysis
Zhao, X., Lynch, J. G., & Chen, Q. (2010) · Journal of Consumer Research · doi:10.1086/651257 · Cited by 12,583
Absorptive Capacity: A Review, Reconceptualization, and Extension
Zahra, S. A., & George, G. (2002) · The Academy of Management Review · doi:10.5465/amr.2002.6587995 · Cited by 10,758
Exploring internal stickiness: Impediments to the transfer of best practice within the firm
Szulanski, G. (1996) · Strategic Management Journal · doi:10.1002/smj.4250171105 · Cited by 7,839
Assessing construct validity in organizational research
Bagozzi, R. P., Yi, Y., & Phillips, L. W. (1991) · Administrative Science Quarterly · doi:10.2307/2393203 · Cited by 6,621
The Psychology of Survey Response
Tourangeau, R., Rips, L. J., & Rasinski, K. (2000) · doi:10.1017/cbo9780511819322 · Cited by 4,734
The Architecture of Complexity
Simon, H. A. (1991) · Facets of Systems Science · doi:10.1007/978-1-4899-0718-9_31 · Cited by 4,433
Method Variance in Organizational Research: Truth or Urban Legend?
Spector, P. E. (2006) · Organizational Research Methods · doi:10.1177/1094428105284955 · Cited by 3,445
From the Editors: Common method variance in international business research
Chang, S.-J., van Witteloostuijn, A., & Eden, L. (2010) · Journal of International Business Studies · doi:10.1057/jibs.2009.88 · Cited by 3,352
Partial least squares structural equation modeling
Sarstedt, M., Ringle, C. M., & Hair, J. F. (2017) · Handbook of Market Research · doi:10.1007/978-3-319-05542-8_15-1 · Cited by 3,285
The reification of absorptive capacity: A critical review and rejuvenation of the construct
Lane, P. J., Koka, B. R., & Pathak, S. (2006) · Academy of Management Review · doi:10.5465/amr.2006.22527456 · Cited by 2,880
Common method bias in regression models with linear, quadratic, and interaction effects.
Siemsen, E., Roth, A., & Oliveira, P. (2010) · Organizational Research Methods · doi:10.1177/1094428109351241 · Cited by 2,706
What Reviewers Should Expect from Authors Regarding Common Method Bias in Organizational Research
Conway, J. M., & Lance, C. E. (2010) · Journal of Business and Psychology · doi:10.1007/s10869-010-9181-6 · Cited by 2,392
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
Nitzl, C., Roldan, J. L., & Cepeda, G. (2016) · Industrial Management & Data Systems · doi:10.1108/imds-07-2015-0302 · Cited by 2,318
Managing Potential and Realized Absorptive Capacity: How do Organizational Antecedents Matter?
Jansen, J. J. P., Van Den Bosch, F. A. J., & Volberda, H. W. (2005) · Academy of Management Journal · doi:10.5465/amj.2005.19573106 · Cited by 2,232
Nonaka, I., & von Krogh, G. (2009) · Organization Science · doi:10.1287/orsc.1080.0412 · Cited by 1,939
Absorptive capacity, learning, and performance in international joint ventures
Lane, P. J., Salk, J. E., & Lyles, M. A. (2001) · Strategic Management Journal · doi:10.1002/smj.206 · Cited by 1,884
Absorptive capacity: Valuing a reconceptualization
Todorova, G., & Durisin, B. (2007) · Academy of Management Review · doi:10.5465/amr.2007.25275513 · Cited by 1,841
A theory of the temporary organization
Lundin, R. A., & Söderholm, A. (1995) · Scandinavian Journal of Management · doi:10.1016/0956-5221(95)00036-u · Cited by 1,558
The project-based organisation: an ideal form for managing complex products and systems?
Hobday, M. (2000) · Research Policy · doi:10.1016/s0048-7333(00)00110-4 · Cited by 1,340
Volberda, H. W., Foss, N. J., & Lyles, M. A. (2010) · Organization Science · doi:10.1287/orsc.1090.0503 · Cited by 1,281
Bunderson, J. S., & Sutcliffe, K. M. (2002) · Academy of Management Journal · doi:10.2307/3069319 · Cited by 1,018
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977
The need for new paradigms for complex projects
Williams, T. M. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00047-7 · Cited by 930
Team Diversity and Information Use
Dahlin, K. B., Weingart, L. R., & Hinds, P. J. (2005) · Academy of Management Journal · doi:10.5465/amj.2005.19573112 · Cited by 784
On the emancipation of PLS-SEM: a commentary on Rigdon (2012)
Sarstedt, M., Ringle, C. M., Henseler, J., & Hair, J. F. (2014) · Long Range Planning · doi:10.1016/j.lrp.2014.02.007 · Cited by 758
Inquiring into the temporary organization: New directions for project management research
Packendorff, J. (1995) · Scandinavian Journal of Management · doi:10.1016/0956-5221(95)00018-q · Cited by 753
Paradox in Project-Based Enterprise: The Case of Film Making
DeFillippi, R. J., & Arthur, M. B. (1998) · California Management Review · doi:10.2307/41165936 · Cited by 744
(2020) · Springer eBooks · doi:10.1007/978-3-319-05542-8 · Cited by 634
Tatikonda, M. V., & Rosenthal, S. R. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.820727 · Cited by 634
Temporary Architectures of Learning: Knowledge Governance in Project Ecologies
Grabher, G. (2004) · Organization Studies · doi:10.1177/0170840604047996 · Cited by 605
Perceptual measures of performance: fact or fiction?
Ketokivi, M. A., & Schroeder, R. G. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2002.07.001 · Cited by 604
Variations in Critical Success Factors Over the Stages in the Project Life Cycle
Pinto, J. K., & Prescott, J. E. (1988) · Journal of Management · doi:10.1177/014920638801400102 · Cited by 581
Now, let's make it really complex (complicated): A systematic review of the complexities of projects
Geraldi, J., Maylor, H., & Williams, T. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111165848 · Cited by 559
Different stakeholder groups and their perceptions of project success
Davis, K. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.02.006 · Cited by 532
Turner, J. R., & Cochrane, R. A. (1993) · International Journal of Project Management · doi:10.1016/0263-7863(93)90017-h · Cited by 529
Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.07.008 · Cited by 471
Research Methods for Organizational Studies
Schwab, D. P. (2013) · Psychology Press eBooks · doi:10.4324/9781410611284 · Cited by 455
Tatikonda, M. V., & Rosenthal, S. R. (2000) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00028-0 · Cited by 446
Turner, R., & Zolin, R. (2012) · Project Management Journal · doi:10.1002/pmj.21289 · Cited by 419
Success factors of knowledge management in temporary organizations
Lindner, F., & Wald, A. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.09.003 · Cited by 397
Self-citationThe Architecture of Complexity
Kornberger, M., & Clegg, S. (2003) · Culture and Organization · doi:10.1080/14759550302804 · Cited by 388
Temporary Organizing: Promises, Processes, Problems
Bakker, R. M., DeFillippi, R. J., Schwab, A., & Sydow, J. (2016) · Organization Studies · doi:10.1177/0170840616655982 · Cited by 367
Bibliometric analysis of absorptive capacity
Apriliyanti, I. D., & Alon, I. (2017) · International Business Review · doi:10.1016/j.ibusrev.2017.02.007 · Cited by 359
Validation of an instrument to measure absorptive capacity
Jiménez-Barrionuevo, M. M., García-Morales, V. J., & Molina, L. M. (2011) · Technovation · doi:10.1016/j.technovation.2010.12.002 · Cited by 300
Clarifying the project complexity construct: Past, present and future
Bakhshi, J., Ireland, V., & Gorod, A. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.002 · Cited by 293
On temporary organizations: A review, synthesis and research agenda
Burke, C. M., & Morley, M. J. (2016) · Human Relations · doi:10.1177/0018726715610809 · Cited by 281
Leal-Rodríguez, A. L., Roldán, J. L., Ariza-Montes, J. A., & Leal-Millán, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.01.005 · Cited by 258
Projectification in Western economies: A comparative study of Germany, Norway and Iceland
Schoper, Y.-G., Wald, A., Ingason, H. T., & Fridgeirsson, T. V. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.008 · Cited by 242
Self-citationKnowledge management in project environments
Hanisch, B., Lindner, F., Mueller, A., & Wald, A. (2009) · Journal of Knowledge Management · doi:10.1108/13673270910971897 · Cited by 216
Self-citationAdvancing project and portfolio management research: Applying strategic management theories
Killen, C. P., Jugdev, K., Drouin, N., & Petit, Y. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.12.004 · Cited by 207
Klarner, P., Sarstedt, M., Hoeck, M., & Ringle, C. M. (2013) · Long Range Planning · doi:10.1016/j.lrp.2013.03.001 · Cited by 194
Cheung, S. Y., Gong, Y., Wang, M., Zhou, L., & Shi, J. (2016) · Human Relations · doi:10.1177/0018726715615684 · Cited by 188
The impact of brand extension success drivers on brand extension price premiums
Sattler, H., Völckner, F., Riediger, C., & Ringle, C. M. (2010) · International Journal of Research in Marketing · doi:10.1016/j.ijresmar.2010.08.005 · Cited by 179
The challenge of transactional and transformational leadership in projects
Tyssen, A. K., Wald, A., & Spieth, P. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.010 · Cited by 178
Self-citationThe role of structural factors in determining project management success
Might, R. J., & Fischer, W. A. (1985) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1985.6447584 · Cited by 178
Popaitoon, S., & Siengthai, S. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.12.002 · Cited by 177
Pauget, B., & Wald, A. E. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.07.001 · Cited by 170
Self-citationComplexity, uncertainty-reduction strategies, and project performance
Floricel, S., Michela, J. L., & Piperca, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.11.007 · Cited by 169
Lu, Y., Luo, L., Wang, H., Le, Y., & Shi, Q. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.12.005 · Cited by 158
Hanisch, B., & Wald, A. E. (2013) · Scandinavian Journal of Management · doi:10.1016/j.scaman.2013.08.005 · Cited by 138
Self-citationSix sigma, absorptive capacity and organisational learning orientation
Gutiérrez, L., Bustinza, Ó. F., & Barrales‐Molina, V. (2011) · International Journal of Production Research · doi:10.1080/00207543.2010.543175 · Cited by 119
HRM in project groups: The effect of project duration on team development effectiveness
Zwikael, O., & Unger-Aviram, E. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.09.005 · Cited by 117
Löwik, S. J. A., Kraaijenbrink, J., & Groen, A. J. (2016) · Journal of Knowledge Management · doi:10.1108/jkm-11-2015-0433 · Cited by 112
Designing Collaborative Systems to Enhance Team Performance
Zhang, X., Venkatesh, V., & Brown, S. A. (2011) · Journal of the Association for Information Systems · doi:10.17705/1jais.00273 · Cited by 88
Soaking It Up: Absorptive Capacity in Interorganizational New Product Development Teams
Backmann, J., Hoegl, M., & Cordery, J. L. (2015) · Journal of Product Innovation Management · doi:10.1111/jpim.12295 · Cited by 86
Dimensions of Uncertainty and Their Moderating Effect on New Product Development Project Performance
Sicotte, H., & Bourgault, M. (2008) · R and D Management · doi:10.1111/j.1467-9310.2008.00531.x · Cited by 81
Teams’ innovation: getting there through knowledge sharing and absorptive capacity
Curado, C., Oliveira, M. F. D. A., Maçada, A. C. G., & Nodari, F. (2017) · Knowledge Management Research & Practice · doi:10.1057/kmrp.2015.8 · Cited by 63
Microlevel antecedents of absorptive capacity in joint project engineering teams
Ojo, A. O., Raman, M., & Chong, C. W. (2017) · Management Research Review · doi:10.1108/mrr-08-2016-0202 · Cited by 21
Cited by
Zeng, N., Liu, Y., Gong, P., Hertogh, M., & König, M. (2021) · Frontiers of Engineering Management · doi:10.1007/s42524-021-0153-5 · Cited by 300
Mapping wastes in complex projects for Lean Product Development
Belvedere, V., Cuttaia, F., Rossi, M., & Stringhetti, L. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.01.008 · Cited by 32
Metadata
- Authors
- Bjorvatn, T., & Wald, A.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2018-08
- Volume
- 36
- Issue
- 6
- Pages
- 876-888
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2803130988
- Cited by
- 206
- References
- 78
- FWCI
- 16.99
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.