Options to make steel reuse profitable: An analysis of cost and risk distribution across the UK construction value chain

Open access
Dunant, Cyrille F., Drewniok, Michał P., Sansom, Michael, Corbey, Simon, Cullen, Jonathan M., Allwood, Julian M.·2018·Journal of Cleaner Production

Abstract

Although steel reuse has been identified as an effective method to reduce the carbon and energy impact of construction, it is in effect only a marginal practice. A detailed analysis of the costs and risks of reuse in practice in the uk is lacking. We found that although there is a sufficient spread between the price of steel scrap and new steel, this difference cannot be captured by the demolition contractors. Rather, reused steel is somewhat more expensive than new elements, except in certain circumstances such as when the reused elements are available from a nearby site, or when testing elements can be avoided. Further, we show that neither the costs of steel reuse, nor the risks, nor its benefits are spread equitably throughout the construction industry supply chain: most of the substantial and capital-intensive changes required for the widespread adoption of steel reuse are concentrated on steelwork contractors and stockists. Based on this analysis, we suggest helping the emergence of a specialised stockist.

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.jclepro.2018.02.141

Cites

24 of 24 references verified0 citation errors · 0 not checkable

Statistics

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • Extra charges can yield a higher deconstruction cost when compared with demolition of the same building.

    “These extra charges can yield a higher deconstruction cost (when compared with the demolition of the same building) (Chileshe et al., 2015; Dantata et al., 2005; Dunant et al., 2018; Rose and Stegemann, 2018; Tingley et al., 2017; Yeung et al., 2015)”

    From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2018

    Section 3.2 identifies a cost for striking down a building, and Section 4.2 lists time on the worksite as a cost for demolition contractors. The paper does not compare deconstruction with demolition of the same building or establish that these charges make deconstruction more expensive. (LLM, conf=0.77)

    Experimental — accuracy not yet measured
  • The restriction of insufficient supply encourages contractors to sell their reusable waste to recycling companies regardless of its high quality.

    “According to Dunant et al. (2018), the above restriction encourages the contractors to sell their reusable waste to the recycling companies regardless of their high quality (Huuhka and Hakanen, 2015; Sansom and Avery, 2014; Tingley et al., 2017; Yeung et al., 2015, 2017).”

    From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al. (2018)

    Section 4.2 (page not specified) says demolition contractors find it easier to sell steel for scrap regardless of its condition. It attributes this to limited storage infrastructure and an illiquid reuse market, not insufficient supply, and does not identify recycling companies as the buyers. (LLM, conf=0.86)

    Experimental — accuracy not yet measured
  • Close cooperation between construction and demolition companies can address the barrier of lack of a mature reuse market.

    “Hence, as advised by Dunant et al. (2018) and Nußholz et al. (2019), close cooperation between construction and demolition companies can address this barrier.”

    From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2018

    The Conclusion (section 5; page not provided) recommends cooperation to help a market for reused steel take off, but specifies stockists and steelwork contractors—not construction and demolition companies. Section 4.1 says owners of demolished and replacement buildings must coordinate for one limited reuse scenario, rather than presenting that coordination as a general solution to an immature market. (LLM, conf=0.85)

    Experimental — accuracy not yet measured
  • In many instances, coordination between the owners of the demolition site and the new building never happens.

    “However, in many instances, this coordination never happens (Dunant et al., 2018, Nußholz et al., 2019).”

    From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2018

  • Additional charges which can increase the overall price of recovered components are cost of testing, cost of treatment of salvaged parts, cost of insurance and cost of marketing.

    “Other additional charges which can increase the overall price of the recovered components are cost of testing (Dunant et al., 2018; Gorgolewski, 2008; Rameezdeen et al., 2016; Tingley et al., 2017; Yeung et al., 2015), cost of treatment of the salvaged parts (Chini and Acquaye, 2001; Dunant et al., 2018; Huuhka and Hakanen, 2015), cost of insurance (Tingley et al., 2017) and cost of marketing for”

    From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2018

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Cites

Flagged first, then by citations

Research works printed but not linked: 3

  1. Guy, B., Shell, S., Esherick, H., 2006. Design for deconstruction and materials reuse. Proc. CIB Task Group 39, 189e209.
  2. Ley, J., Samson, M., 2003. A life-cycle energy model of the UK steel construction sector. In: System-based Vision for Strategic and Creative Design, Franco Bon- tempi Edition, vol. 1, pp. 309e314.
  3. Vukotic, L., 2013. Assessment of the Potential for Structural Steel Reuse in the UK Construction Industry. Dissertation for Master of Studies in Construction En- gineering. University of Cambridge.

Cited by

Sorted by citations

Authors
Dunant, C. F., Drewniok, M. P., Sansom, M., Corbey, S., Cullen, J. M., & Allwood, J. M.
Affiliations
  • University of Cambridge (GB)
  • Steel Construction Institute (GB)
  • Foundry (United Kingdom) (GB)
Corresponding author
Dunant, Cyrille F.
Venue
Journal of Cleaner Production
Publisher
Elsevier BV
Published
2018-05
Volume
183
Pages
102-111
ISSN
0959-6526 (ISSN-L)
OpenAlex
W2792048640
Cited by
91
References
24
Citations by year
2026: 14 · 2025: 10 · 2024: 16 · 2023: 12 · 2022: 7 · 2021: 14 · 2020: 6 · 2019: 10 · 2018: 2
FWCI
13.34
Type
journal article
Language
en
Open access
Locations
  • Journal of Cleaner Production (publishedVersion, cc-by)
  • Apollo (University of Cambridge) (submittedVersion, cc-by)
  • Cambridge University Engineering Department Publications Database (submittedVersion)
  • Apollo (cc-by)
Funders
  • Supply Chain Integration for structural steel reuse (132106)
  • epsrc Material demand reduction (NMZL/112, RG82144)
  • EPSRC (EP/N02351X/1)
Topics
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
  • Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
  • Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
Keywords
steel reuse, steel scrap, cost analysis, risk allocation, construction supply chain, demolition contractors, UK construction industry

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review