Real and perceived barriers to steel reuse across the UK construction value chain
Open accessIntegrity signals
Registry
Cites
Statistics
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The lower price of reused components can contribute to cost savings in construction projects.
“For example, according to Chileshe et al., (2018), da Rocha and Sattler (2009), Dunant et al. (2017), Gorgolewski et al. (2008), Klang et al. (2003) and MacKinnon (2000), the lower price of the reused components can contribute to the cost savings in the construction projects.”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al. (2017)
An attractive price for reused components increases revenue from resale of these components.
“and increases the revenue from the resale of these components (Dantata et al., 2005; da Rocha and Sattler, 2009; Dunant et al., 2017; Klang et al., 2003; Sea-Lim et al., 2018)”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
Positive perception and willingness of stakeholders such as clients, designers and contractors to integrate reused components into their projects are determining.
“However, from a social perspective, positive perception and willingness of the stakeholders such as clients (Arif et al., 2012; Dunant et al., 2017, 2018; Gorgolewski, 2008; Gorgolewski et al., 2008; Sansom and Avery, 2014; Shaurette, 2006; ), designers (Dunant et al., 2017, 2018; Gorgolewski, 2008; Gorgolewski et al., 2008; Rameezdeen et al., 2016; Tingley et al., 2017) and contractors (Chileshe”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
Another economic barrier to BCR is the higher cost of design with reused components.
“Another economic barrier to the BCR is the higher cost of design with the reused components (Dunant et al., 2017; Gorgolewski, 2008; Gorgolewski et al., 2008).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
In some cases, the fabrication cost of recovered building components might be higher than the fabrication cost of new elements.
“In some cases, the fabrication cost of the recovered building components might be higher than the fabrication cost of the new elements (Dunant et al., 2017, 2018; Tingley et al., 2017).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
Because reused steel components are associated with existing connections, holes, stiffeners, welds, end-plates, etc., preparation of these components might increase the overall cost of fabrication because of extra time, labour and machinery required.
“Dunant et al. (2017) explain that because reused steel components are associated with existing connections, holes, stiffeners, welds, end-plates, etc., the preparation of these components might increase the overall cost of fabrication because of the extra time, labour and machinery required.”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al. (2017)
The lack of an established market results in the lack of sufficient supply of reused components with desired characteristics.
“This factor, which is partially the outcome of the tight project schedules (Tatiya et al., 2017), results in the lack of sufficient supply of reused components with the desired characteristics (dimension, quality, etc.) (Brütting et al., 2019; da Rocha and Sattler, 2009; Dunant et al., 2017; Gorgolewski, 2008; Rose and Stegemann, 2018; Tingley et al., 2017).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
Lack of design for deconstruction (DfD) intervention at the design stage is a barrier to reuse of building components.
“According to the literature, the lack of such an intervention is a barrier to reuse (Ajayi et al., 2015; Chileshe et al., 2015, 2016b; Dunant et al., 2017; Huuhka and Hakanen, 2015; Tatiya et al., 2017 (among others)).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
Visual appearance of reused components might be interpreted as lower quality compared with a new element.
“One reason behind this is the visual appearance of the reused components that might be interpreted as lower quality when compared with a new element (Dunant et al., 2017; Durão et al., 2014; Tingley et al., 2017).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
Construction sector's resistance against reuse stems from potential risks perceived by stakeholders during deconstruction or while using recovered building components.
“Another reason for this negative perception, and, at a larger scale, the construction sector’s resistance against reuse (Durão et al., 2014; Gorgolewski, 2008; Rameezdeen et al., 2016; Tingley et al., 2017), stems from the potential risks perceived by the stakeholders during deconstruction or while using the recovered building components (Chileshe et al., 2015; Dunant et al., 2017; Gorgolewski, 20”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
Traceability of steel sections is essential to certify, fabricate and erect the segments.
“Dunant et al. (2017) explore this barrier by highlighting the need for the traceability of the steel sections, which is essential to certify, fabricate and erect the segments.”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
Traceability of reused steel sections usually cannot be guaranteed.
“Usually, the traceability of the reused steel sections cannot be guaranteed (Dunant et al., 2017; Tingley et al., 2017), and in many instances, all the segments need to be tested to certify their properties and assure their quality.”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
In the case of stricter requirements on Conformité Européene (CE) marking, even individual testing fails to certify reused components.
“However, according to this study, in the case of stricter requirements on Conformité Européene (CE) marking (Dunant et al., 2017; Tingley et al., 2017), even the individual testing fails to certify the reused components.”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
Currently, there are no standards to certify the quality of reused components.
“According to the reviewed articles, currently, there are no standards to certify the quality of the reused components (Chini and Acquaye, 2001, Dunant et al., 2017, Huang et al., 2018).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
In many instances, all segments need to be tested to certify their properties and assure their quality.
“Usually, the traceability of the reused steel sections cannot be guaranteed (Dunant et al., 2017; Tingley et al., 2017), and in many instances, all the segments need to be tested to certify their properties and assure their quality.”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dunant et al., 2017
In the UK, 8%-11% of steel from demolition is reused, with a downward trend.
“In the UK, 8%-11% of steel from demolition is reused, with a downward trend [89,90].”
From Material efficiency strategies to reducing greenhouse gas emissions associated with buildings, vehicles, and electronics—a review (2019) · cites this paper as [89]
Reuse saves 0.36 kg CO2/kg of steel compared to recycling given the energy requirements of remelting in an electric arc furnace, which is much less than replacing virgin steel (1.78 kg CO2/kg) but still appreciable.
“Reuse saves 0.36 kg CO 2 /kg of steel compared to recycling given the energy requirements of remelting in an electric arc furnace, which is much less than replacing virgin steel (1.78 kg CO 2 /kg) but still appreciable [89].”
From Material efficiency strategies to reducing greenhouse gas emissions associated with buildings, vehicles, and electronics—a review (2019) · cites this paper as [89]
Important barriers to reuse are the (perceived) availability of correctly specified components to be reused, issues associated with quality assurance and risk, and (perceived) costs.
“Important barriers are the (perceived) availability of correctly specified components to be reused, issues associated with quality assurance and risk, and (perceived) costs [89,92,93].”
From Material efficiency strategies to reducing greenhouse gas emissions associated with buildings, vehicles, and electronics—a review (2019) · cites this paper as [89]
Cites
An information-theoretic perspective of tf–idf measures
Aizawa, A. (2003) · Information Processing & Management · doi:10.1016/s0306-4573(02)00021-3 · Cited by 1,419 · see citing works
Material efficiency: A white paper
Allwood, J. M., Ashby, M. F., Gutowski, T. G., & Worrell, E. (2011) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.11.002 · Cited by 927 · see citing works
Self-citationSustainable materials with both eyes open
(2013) · Choice Reviews Online · doi:10.5860/choice.50-3871 · Cited by 435 · see citing works
The Environmental Impacts of Reuse: A Review
Cooper, D. R., & Gutowski, T. G. (2017) · Journal of Industrial Ecology · doi:10.1111/jiec.12388 · Cited by 337 · cited 3× · see citing works
“Cooper and Gutowski wrote an extensive review of the qualities needed for a product to be most environmentally and economically suitable for reuse (Cooper and Gutowski, 2015).”
BackgroundEnergy and environmental indicators related to construction of office buildings
Dimoudi, A., & Tompa, C. (2008) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2008.09.008 · Cited by 315 · see citing works
Supply Loops and Their Constraints: The Industrial Ecology of Recycling and Reuse
Geyer, R., & Jackson, T. (2004) · California Management Review · doi:10.2307/41166210 · Cited by 281 · see citing works
Understanding and overcoming the barriers to structural steel reuse, a UK perspective
Densley Tingley, D., Cooper, S., & Cullen, J. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.02.006 · Cited by 261 · see citing works
Self-citationThe Roles of Energy and Material Efficiency in Meeting Steel Industry CO <sub>2</sub> Targets
Milford, R. L., Pauliuk, S., Allwood, J. M., & Müller, D. B. (2013) · Environmental Science & Technology · doi:10.1021/es3031424 · Cited by 254 · see citing works
Self-citationEffects of structural system on the life cycle carbon footprint of buildings
Nadoushani, Z. S. M., & Akbarnezhad, A. (2015) · Energy and Buildings · doi:10.1016/j.enbuild.2015.05.044 · Cited by 184 · see citing works
Developing an LCA methodology to account for the environmental benefits of design for deconstruction
Densley Tingley, D., & Davison, B. (2012) · Building and Environment · doi:10.1016/j.buildenv.2012.06.005 · Cited by 164 · see citing works
da Rocha, C. G., & Sattler, M. A. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.07.004 · Cited by 126 · see citing works
Reusing Steel and Aluminum Components at End of Product Life
Cooper, D. R., & Allwood, J. M. (2012) · Environmental Science & Technology · doi:10.1021/es301093a · Cited by 118 · see citing works
Self-citation(2006) · Cited by 110 · see citing works
Energy analysis of the non-domestic building stock of Greater London
Choudhary, R. (2011) · Building and Environment · doi:10.1016/j.buildenv.2011.10.006 · Cited by 80 · see citing works
Briefing: Reuse and recycling rates of UK steel demolition arisings
Sansom, M., & Avery, N. (2014) · Proceedings of the Institution of Civil Engineers - Engineering Sustainability · doi:10.1680/ensu.13.00026 · Cited by 60 · see citing works
Self-citationThe influence of UK emissions reduction targets on the emissions of the global steel industry
Serrenho, A. C., Mourão, Z. S., Norman, J. B., et al. (2016) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2016.01.001 · Cited by 54 · see citing works
(2006) · Cited by 33 · see citing works
Barriers for Deconstruction and Reuse/Recycling of Construction Materials in Germany
Kühlen, A., Thompson, N., & Schultmann, F. (2014) · Repository KITopen (Karlsruhe Institute of Technology) · doi:10.5445/ir/1000052698 · Cited by 33 · see citing works
Flagged first, then by citations
Cited by
Sorted by citations
Hertwich, E. G., Ali, S., Ciacci, L., Fishman, T., Heeren, N., Masanet, E., Asghari, F. N., Olivetti, E., Pauliuk, S., Tu, Q., et al. (2019) · Environmental Research Letters · doi:10.1088/1748-9326/ab0fe3 · Cited by 477 · see citing works
Components reuse in the building sector – A systematic review
Rakhshan, K., Morel, J.-C., Alaka, H., & Charef, R. (2020) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20910463 · Cited by 167 · see citing works
“This lack of space for storage (Chinda and Ammarapala, 2016; Dunant et al., 2017, 2018; Gorgolewski, 2008; Rose and Stegemann, 2018; Shaurette, 2006) results in the transportation and storage of the recovered components at a different location and would increase the overall cost of the reused…”
BackgroundInfluentialDunant, C. F., Drewniok, M. P., Sansom, M., Corbey, S., Cullen, J. M., & Allwood, J. M. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.141 · Cited by 91 · see citing works
Self-citationCharacterising existing buildings as material banks (E-BAMB) to enable component reuse
Rose, C. M., & Stegemann, J. A. (2019) · Proceedings of the Institution of Civil Engineers - Engineering Sustainability · doi:10.1680/jensu.17.00074 · Cited by 78 · see citing works
Leveraging material efficiency as an energy and climate instrument for heavy industries in the EU
Hernandez, A. G., Cooper-Searle, S., Skelton, A. C. H., & Cullen, J. M. (2018) · Energy Policy · doi:10.1016/j.enpol.2018.05.055 · Cited by 32 · see citing works
Self-citationReusing Heavy-Section Steel in Buildings: Carbon Reduction Potential and Material Availability
Berglund-Brown, J., & Ochsendorf, J. (2025) · Journal of Architectural Engineering · doi:10.1061/jaeied.aeeng-1918 · Cited by 11 · see citing works
- Authors
- Dunant, C. F., Drewniok, M. P., Sansom, M., Corbey, S., Allwood, J. M., & Cullen, J. M.
- Affiliations
- University of Cambridge (GB)
- Steel Construction Institute (GB)
- Foundry (United Kingdom) (GB)
- Corresponding author
- Dunant, Cyrille F.
- Venue
- Resources, Conservation and Recycling
- Publisher
- Elsevier BV
- Published
- 2017-11
- Volume
- 126
- Pages
- 118-131
- ISSN
- 0921-3449 (ISSN-L)
- OpenAlex
- W2743794888
- Cited by
- 88
- References
- 18
- Citations by year
- 2026: 18 · 2025: 10 · 2024: 14 · 2023: 13 · 2022: 7 · 2021: 8 · 2020: 6 · 2019: 6 · 2018: 5 · 2017: 1
- FWCI
- 9.79
- Type
- journal article
- Language
- en
- Open access
- green
- doi.org
- Locations
- Resources Conservation and Recycling (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Cambridge University Engineering Department Publications Database (submittedVersion)
- Apollo (University of Cambridge) (submittedVersion)
- Apollo
- Funders
- Innovate UK (132106, NMZL/112, RG82144)
- Engineering and Physical Sciences Research Council (EP/N02351X/1)
- Topics
- Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
- Keywords
- steel reuse, construction value chain, barriers to reuse, demolition contractors, supply chain integration, stakeholder perspectives, construction carbon emissions, UK construction industry
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review