Cited by 107Construction Project Management and PerformanceOccupational Health and Safety ResearchConstruction Engineering and Safety

The influence of organizational external factors on construction risk management among Nigerian construction companies

Open access
Adeleke, A.Q., Bahaudin, A.Y., Kamaruddeen, A.M., Bamgbade, J.A., Salimon, Maruf Gbadebo, Khan, Muhammad Waris Ali, Sorooshian, Shahryar·2018·Safety and Health at Work

Abstract

BACKGROUND: Substantial empirical research has shown conflicting results regarding the influence of organizational external factors on construction risk management, suggesting the necessity to introduce a moderator into the study. The present research confirmed whether rules and regulations matter on the relationships between organizational external factors and construction risk management. METHODS: Based on discouragement and organizational control theory, this research examined the effects of organizational external factors and rules and regulations on construction risk management among 238 employees operating in construction companies in Abuja and Lagos, Nigeria. A personally administered questionnaire was used to acquire the data. The data were analyzed using partial least squares structural equation modeling. RESULTS: A significant positive relationship between organizational external factors and construction risk management was asserted. This study also found a significant positive relationship between rules and regulations and construction risk management. As anticipated, rules and regulations were found to moderate the relationship between organizational external factors and construction risk management, with a significant positive result. Similarly, a significant interaction effect was also found between rules and regulations and organizational external factors. Implications of the research from a Nigerian point of view have also been discussed. CONCLUSION: Political, economy, and technology factors helped the construction companies to reduce the chance of risk occurrence during the construction activities. Rules and regulations also helped to lessen the rate of accidents involving construction workers as well as the duration of the projects. Similarly, the influence of the organizational external factors with rules and regulations on construction risk management has proven that most of the construction companies that implement the aforementioned factors have the chance to deliver their projects within the stipulated time, cost, and qualities, which can be used as a yardstick to measure a good project.

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.shaw.2017.05.004

Cites

65 of 65 references verified0 citation errors · 0 not checkable

Statistics

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • Structural equation modeling does not assume the uncertainty and stochastic behavior of events, limiting its applications for complex projects under high uncertainty.

    “One of the limitations of SEM is that it does not assume the uncertainty and stochastic behavior of events [34]; therefore, it has limited applications for complex projects under high uncertainty [1].”

    From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [34]

    The Results (‘Analysis and results’; page not provided) describe using PLS structural equation modeling for construction risk management, but do not say whether SEM assumes uncertainty or stochastic event behavior. Searches for those terms and for SEM limitations found no passage addressing the proposition attached to this source’s citation [34]. The separate claim about applications to highly uncertain projects is attached to citation [1]. (LLM, conf=0.74)

    Experimental — accuracy not yet measured

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Cites

Flagged first, then by citations

Research works printed but not linked: 4

  1. [5]Ojo G. An assessment of the construction site risk-related factors Proceedings of The 40th Annual General Meeting/Conference of the Nigerian Institute of Building. Asaba (Delta State) 2010
  2. [6]Adeleke A.Q. Bahaudin A.Y. Kamaruddeen A.M. Rules and regulations as potential moderator on the relationship between organizational internal and external factors with effective construction risk management in Nigerian construction companies: a proposed framework. Proceedings of The International Conference on Applied Science and Technology 2016 (ICAST’16) 2016 AIP Publishing Melville, (NY) 020008
  3. [8]Iroegbu A.N. Housing in Nigeria: a role of the construction company Kalu A.I. Chima G.N. Housing development in Nigeria: concepts, issues and strategies 2005 Pauliton Press Abakaliki (Nigeria) 225 234
  4. [23]Ismail E. Industrialized building system for housing in Malaysia Proceedings of The 6th Asia Pacific Science and Technology Management Seminar. Tokyo (Japan) 2001

Cited by

Sorted by citations

Authors
Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbade, J. A., Salimon, M. G., Khan, M. W. A., & Sorooshian, S.
Affiliations
  • Universiti Malaysia Pahang Al-Sultan Abdullah (MY)
  • Universiti Utara Malaysia (MY)
  • University of Technology Sarawak (MY)
  • Swinburne University of Technology (AU)
Corresponding author
Adeleke, A.Q.
Venue
Safety and Health at Work
Publisher
Elsevier BV
Published
2018-03
Volume
9
Issue
1
Pages
115-124
ISSN
2093-7911 (ISSN-L)
OpenAlex
W2620647389
Cited by
107
References
65
Citations by year
2026: 4 · 2025: 4 · 2024: 12 · 2023: 19 · 2022: 14 · 2021: 16 · 2020: 17 · 2019: 15 · 2018: 6
FWCI
9.20
Type
journal article
Language
en
Open access
Locations
  • Safety and Health at Work (publishedVersion, cc-by-nc-nd)
  • Europe PMC (PubMed Central) (publishedVersion, cc-by-nc-nd)
  • PubMed Central (publishedVersion, cc-by-nc-nd)
  • PubMed (publishedVersion)
  • Universiti Utara Malaysia Institutional Repository (Universiti Utara Malaysia) (acceptedVersion)
  • UMP Institutional Repository (Universiti Malaysia Pahang) (acceptedVersion)
  • DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
  • Figshare (submittedVersion, cc-by-nc-nd)
  • Swinburne figshare (Swinburne University of Technology) (submittedVersion, cc-by-nc-nd)
  • Swinburne figshare (Swinburne University of Technology)
Topics
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
  • Health Sciences › Health Professions › Radiological and Ultrasound Technology › Occupational Health and Safety Research
  • Physical Sciences › Engineering › Civil and Structural Engineering › Construction Engineering and Safety
Keywords
construction risk management, rules and regulations, organizational control theory, political factors, economic factors, technological factors, construction companies, project duration, Nigeria

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review