The influence of organizational external factors on construction risk management among Nigerian construction companies
Open accessAbstract
BACKGROUND: Substantial empirical research has shown conflicting results regarding the influence of organizational external factors on construction risk management, suggesting the necessity to introduce a moderator into the study. The present research confirmed whether rules and regulations matter on the relationships between organizational external factors and construction risk management. METHODS: Based on discouragement and organizational control theory, this research examined the effects of organizational external factors and rules and regulations on construction risk management among 238 employees operating in construction companies in Abuja and Lagos, Nigeria. A personally administered questionnaire was used to acquire the data. The data were analyzed using partial least squares structural equation modeling. RESULTS: A significant positive relationship between organizational external factors and construction risk management was asserted. This study also found a significant positive relationship between rules and regulations and construction risk management. As anticipated, rules and regulations were found to moderate the relationship between organizational external factors and construction risk management, with a significant positive result. Similarly, a significant interaction effect was also found between rules and regulations and organizational external factors. Implications of the research from a Nigerian point of view have also been discussed. CONCLUSION: Political, economy, and technology factors helped the construction companies to reduce the chance of risk occurrence during the construction activities. Rules and regulations also helped to lessen the rate of accidents involving construction workers as well as the duration of the projects. Similarly, the influence of the organizational external factors with rules and regulations on construction risk management has proven that most of the construction companies that implement the aforementioned factors have the chance to deliver their projects within the stipulated time, cost, and qualities, which can be used as a yardstick to measure a good project.
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Structural equation modeling does not assume the uncertainty and stochastic behavior of events, limiting its applications for complex projects under high uncertainty.
“One of the limitations of SEM is that it does not assume the uncertainty and stochastic behavior of events [34]; therefore, it has limited applications for complex projects under high uncertainty [1].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [34]
The Results (‘Analysis and results’; page not provided) describe using PLS structural equation modeling for construction risk management, but do not say whether SEM assumes uncertainty or stochastic event behavior. Searches for those terms and for SEM limitations found no passage addressing the proposition attached to this source’s citation [34]. The separate claim about applications to highly uncertain projects is attached to citation [1]. (LLM, conf=0.74)
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Cites
Evaluating Structural Equation Models with Unobservable Variables and Measurement Error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.2307/3151312 · Cited by 109,314 · see citing works
Evaluating structural equation models with unobservable variables and measurement error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.1177/002224378101800104 · Cited by 109,190 · see citing works
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society Series A (General) · doi:10.2307/2344428 · Cited by 35,801 · see citing works
On the Evaluation of Structural Equation Models
Bagozzi, R. P., & Yi, Y. (1988) · Journal of the Academy of Marketing Science · doi:10.1007/bf02723327 · Cited by 26,163 · see citing works
Pls-Sem: indeed a silver bullet
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011) · Journal of Marketing Theory and Practice · doi:10.2753/mtp1069-6679190202 · Cited by 21,631 · see citing works
(1998) · Cited by 12,725 · see citing works
\nThe use of partial least squares path modeling in international marketing
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009) · Radboud Repository (Radboud University) · doi:10.1108/s1474-7979(2009)0000020014 · Cited by 11,790 · see citing works
Cross validatory choice and assessment of statistical predictions
Stone, M. (1974) · Journal of the Royal Statistical Society Series B: Statistical Methodology · doi:10.1111/j.2517-6161.1974.tb00994.x · Cited by 10,881 · see citing works
Hanrahan, G. (2008) · CRC Press eBooks · doi:10.1201/9781420067972-10 · Cited by 8,196 · see citing works
Modern Methods for Business Research
(1998) · doi:10.4324/9781410604385 · Cited by 6,534 · see citing works
Chin, W. W., Marcolin, B. L., & Newsted, P. R. (2003) · Information Systems Research · doi:10.1287/isre.14.2.189.16018 · Cited by 6,479 · see citing works
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2013) · Long Range Planning · doi:10.1016/j.lrp.2013.01.001 · Cited by 5,310 · see citing works
Two Structural Equation Models: LISREL and PLS Applied to Consumer Exit-Voice Theory
Fornell, C., & Bookstein, F. L. (1982) · Journal of Marketing Research · doi:10.2307/3151718 · Cited by 4,516 · see citing works
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,353 · see citing works
Handbook of Partial Least Squares
Vinzi, V. E., Chin, W. W., Henseler, J., & Wang, H. (2010) · Springer eBooks · doi:10.1007/978-3-540-32827-8 · Cited by 3,850 · see citing works
A Predictive Approach to the Random Effect Model
Geisser, S. (1974) · Biometrika · doi:10.1093/biomet/61.1.101 · Cited by 3,101 · see citing works
Hair, J. F., Sarstedt, M., Pieper, T. M., & Ringle, C. M. (2012) · Long Range Planning · doi:10.1016/j.lrp.2012.09.008 · Cited by 2,454 · see citing works
Falk, R. F., & Miller, N. B. (1992) · Cited by 2,320 · see citing works
Ringle, C. M., Sarstedt, M., & Straub, D. W. (2012) · MIS Quarterly · doi:10.2307/41410402 · Cited by 2,184 · see citing works
Latent Variable Path Modeling with Partial Least Squares
Lohmöller, J.-B. (1989) · Physica-Verlag eBooks · doi:10.1007/978-3-642-52512-4 · Cited by 2,149 · see citing works
Wold, H. (2005) · Wiley eBooks · doi:10.1002/0471667196.ess1914.pub2 · Cited by 1,545 · see citing works
Peng, D. X., & Lai, F. (2012) · Journal of Operations Management · doi:10.1016/j.jom.2012.06.002 · Cited by 1,532 · see citing works
Encyclopedia of Statistical Sciences 2.
Dawid, A. P., Kotz, S., Johnson, N. L., & Read, C. B. (1984) · Biometrics · doi:10.2307/2530789 · Cited by 1,494 · see citing works
A Practical Guide to Calculating Cohen’s f2, a Measure of Local Effect Size, from PROC MIXED
Selya, A. S., Rose, J. S., Dierker, L. C., Hedeker, D., & Mermelstein, R. J. (2012) · Frontiers in Psychology · doi:10.3389/fpsyg.2012.00111 · Cited by 1,297 · see citing works
Vinzi, V. E., Trinchera, L., & Amato, S. (2009) · Springer eBooks · doi:10.1007/978-3-540-32827-8_3 · Cited by 1,159 · see citing works
Lewis, Agarwal, & Sambamurthy, V. (2003) · MIS Quarterly · doi:10.2307/30036552 · Cited by 1,089 · see citing works
Toward a Theory of Marketing Control: Environmental Context, Control Types, and Consequences
Jaworski, B. J. (1988) · Journal of Marketing · doi:10.2307/1251447 · Cited by 765 · see citing works
Toward an integrative framework of organizational control
Flamholtz, E., Das, T. K., & Tsui, A. S. (1985) · Accounting Organizations and Society · doi:10.1016/0361-3682(85)90030-3 · Cited by 671 · see citing works
The effects of construction delays on project delivery in Nigerian construction industry
Aibinu, A. A., & Jagboro, G. O. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00028-5 · Cited by 597 · see citing works
Modelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 590 · see citing works
The significant factors causing delay of building construction projects in Malaysia
Alaghbari, W., Kadir, M. R. A., Salim, A., & Ernawati, E. (2007) · Engineering Construction & Architectural Management · doi:10.1108/09699980710731308 · Cited by 490 · see citing works
BEHAVIOR IN ORGANIZATIONSPreprint
RISMALIYANTI, A. S. (2023) · doi:10.31219/osf.io/x75bv · Cited by 482 · see citing works
Greenberg, J. (1983) · Cited by 412 · see citing works
An integrated approach to natural disaster management
Moe, T. L., & Pathranarakul, P. (2006) · Disaster Prevention and Management An International Journal · doi:10.1108/09653560610669882 · Cited by 376 · see citing works
Scupola, A. (2003) · Journal of Global Information Technology Management · doi:10.1080/1097198x.2003.10856343 · Cited by 371 · see citing works
A PLS Model to Study Brand Preference: An Application to the Mobile Phone Market
Duarte, P., & Raposo, M. L. B. (2009) · Springer eBooks · doi:10.1007/978-3-540-32827-8_21 · Cited by 351 · see citing works
Is two-tailed testing for directional research hypotheses tests legitimate?
Cho, H.-C., & Abe, S. (2012) · Journal of Business Research · doi:10.1016/j.jbusres.2012.02.023 · Cited by 313 · see citing works
Bresnen, M., & Marshall, N. (2000) · Construction Management and Economics · doi:10.1080/014461900433104 · Cited by 312 · see citing works
Helm, S., Eggert, A., & Garnefeld, I. (2009) · Springer eBooks · doi:10.1007/978-3-540-32827-8_23 · Cited by 294 · see citing works
Causal flows with latent variables
Wold, H. (1974) · European Economic Review · doi:10.1016/0014-2921(74)90008-7 · Cited by 269 · see citing works
Construction risk assessment by linguistics
Kangari, R., & Riggs, L. S. (1989) · IEEE Transactions on Engineering Management · doi:10.1109/17.18829 · Cited by 248 · see citing works
Contributors to construction delays
Kumaraswamy, M. M., & Chan, D. W. M. (1998) · Construction Management and Economics · doi:10.1080/014461998372556 · Cited by 240 · see citing works
Bhojanna, U., & Murthy, S. (2010) · Cited by 236 · see citing works
Partial least-squares path modelling with latent variables
Gerlach, R. W., Kowalski, B. R., & Wold, H. (1979) · Analytica Chimica Acta · doi:10.1016/s0003-2670(01)85039-x · Cited by 206 · see citing works
Three criteria for the use of one-tailed tests.
Kimmel, H. D. (1957) · Psychological Bulletin · doi:10.1037/h0046737 · Cited by 157 · see citing works
The Titanic sunk, so what? Project manager response to unexpected events
Geraldi, J. G., Lee‐Kelley, L., & Kutsch, E. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.10.008 · Cited by 155 · see citing works
Doloi, H. K. (2009) · Construction Management and Economics · doi:10.1080/01446190903286564 · Cited by 137 · see citing works
Blalock, H. M. (1979) · American Sociological Review · doi:10.2307/2094714 · Cited by 116 · see citing works
TQM, Culture, and Performance in UAE Manufacturing Firms
Jabnoun, N., & Sedrani, K. (2005) · Quality Management Journal · doi:10.1080/10686967.2005.11919267 · Cited by 100 · see citing works
Contractor development in Nigeria: perceptions of contractors and professionals
Adams, O. A. (1997) · Construction Management and Economics · doi:10.1080/014461997373141 · Cited by 81 · see citing works
An empirical study of the complexity of requirements management in construction projects
Jallow, A. K., Demian, P., Baldwin, A. N., & Anumba, C. (2014) · Engineering Construction & Architectural Management · doi:10.1108/ecam-09-2013-0084 · Cited by 74 · see citing works
Ahmed, S. M., AHMAD, R., & Saram, D. D. D. (1999) · Engineering Construction & Architectural Management · doi:10.1108/eb021114 · Cited by 69 · see citing works
Risk: Analysis, Assessment and Management
Bowers, J. A. (1993) · Journal of the Operational Research Society · doi:10.1057/jors.1993.163 · Cited by 66 · see citing works
Significant risk factors in construction projects: Contractor's perception
Karim, N. A. A., Rahman, I. B. A., Hameed, A., Jamil, N., & Azis, A. A. A. (2012) · IEEE Colloquium on Humanities, Science and Engineering · doi:10.1109/chuser.2012.6504337 · Cited by 59 · see citing works
The business environment of the construction industry in Nigeria
Aniekwu, A. N. (1995) · Construction Management and Economics · doi:10.1080/01446199500000052 · Cited by 56 · see citing works
Sustainable refurbishment: policy direction and support in the UK
Mansfield, J. R. (2009) · International Journal of Building Pathology and Adaptation · doi:10.1108/02630800910956461 · Cited by 46 · see citing works
Introducing a New Risk Management Model to the Saudi Arabian Construction Industry
Algahtany, M., Alhammadi, Y., & Kashiwagi, D. T. (2016) · Procedia Engineering · doi:10.1016/j.proeng.2016.04.122 · Cited by 38 · see citing works
Alinaitwe, H. M. (2008) · Journal of Civil Engineering and Management · doi:10.3846/1392-3730.2008.14.1 · Cited by 36 · see citing works
The performance and problems of affordable housing policy in China
Niu, Y. F. (2008) · International Journal of Housing Markets and Analysis · doi:10.1108/17538270810877763 · Cited by 34 · see citing works
Exploring Causal Path Directionality for a Marketing Model Using Cohen’s Path Method
Callaghan, W. M., Wilson, B. J., Ringle, C. M., & Henseler, J. (2007) · University of Twente Research Information · Cited by 30 · see citing works
Delivering new affordable housing in the age of austerity: housing policy in Scotland
Gibb, K. (2011) · International Journal of Housing Markets and Analysis · doi:10.1108/17538271111172157 · Cited by 30 · see citing works
Predictors of Housing Satisfaction in Abuja, Nigeria
Ukoha, O. M., & Beamish, J. O. (1996) · Housing and Society · doi:10.1080/08882746.1996.11430249 · Cited by 27 · see citing works
How great leaders avoid disaster: the value of contingency planning
Simpkins, R. A. (2009) · Business Strategy Series · doi:10.1108/17515630910942241 · Cited by 15 · see citing works
A CRITICAL LOOK AT THE USE OF PLS-SEM IN MISQ
Ringle, C. M., Sarstedt, M., & Straub, D. W. (2012) · Cited by 3 · see citing works
Use of partial least squares (PLS) in strategic management research: a review of four recent studies
Hulland, J. (1999) · Strategic Management Journal · doi:10.1002/(sici)1097-0266(199902)20:2
Flagged first, then by citations
Research works printed but not linked: 4
- [5]Ojo G. An assessment of the construction site risk-related factors Proceedings of The 40th Annual General Meeting/Conference of the Nigerian Institute of Building. Asaba (Delta State) 2010
- [6]Adeleke A.Q. Bahaudin A.Y. Kamaruddeen A.M. Rules and regulations as potential moderator on the relationship between organizational internal and external factors with effective construction risk management in Nigerian construction companies: a proposed framework. Proceedings of The International Conference on Applied Science and Technology 2016 (ICAST’16) 2016 AIP Publishing Melville, (NY) 020008
- [8]Iroegbu A.N. Housing in Nigeria: a role of the construction company Kalu A.I. Chima G.N. Housing development in Nigeria: concepts, issues and strategies 2005 Pauliton Press Abakaliki (Nigeria) 225 234
- [23]Ismail E. Industrialized building system for housing in Malaysia Proceedings of The 6th Asia Pacific Science and Technology Management Seminar. Tokyo (Japan) 2001
Cited by
Sorted by citations
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172 · see citing works
Malaysian SMEs m-commerce adoption: TAM 3, UTAUT 2 and TOE approach
Salimon, M. G., Kareem, O., Mokhtar, S. S. M., Aliyu, O. A., Bamgbade, J. A., & Adeleke, A. Q. (2021) · Journal of Science and Technology Policy Management · doi:10.1108/jstpm-06-2019-0060 · Cited by 107 · see citing works
Analysis of some factors driving ecological sustainability in construction firms
Bamgbade, J. A., Kamaruddeen, A. M., Nawi, M. N. M., Adeleke, A. Q., Salimon, M. G., & Ajibike, W. A. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.10.229 · Cited by 101 · see citing works
Khodabakhshian, A., Puolitaival, T., & Kestle, L. (2023) · Buildings · doi:10.3390/buildings13051312 · Cited by 77 · see citing works
Bamgbade, J. A., Nawi, M. N. M., Kamaruddeen, A. M., Adeleke, A. Q., & Salimon, M. G. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2019.1634666 · Cited by 76 · see citing works
Salimon, M. G., Mokhtar, S. S. M., Aliyu, O. A., Perumal, S., & Yusr, M. M. (2021) · Journal of Systems and Information Technology · doi:10.1108/jsit-02-2020-0029 · Cited by 73 · see citing works
Ashtari, M. A., Ansari, R., Hassannayebi, E., & Jeong, J. (2022) · Buildings · doi:10.3390/buildings12101660 · Cited by 65 · see citing works
Sui, Y., Ding, R., & Wang, H. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.120945 · Cited by 57 · see citing works
Moshood, T. D., Adeleke, A. Q., Nawanir, G., & Mahmud, F. B. (2020) · Social Sciences & Humanities Open · doi:10.1016/j.ssaho.2020.100064 · Cited by 60 · see citing works
Critical review of emotional intelligence research studies in the construction industry
Kukah, A. S. K., Owusu‐Manu, D., & Edwards, D. J. (2022) · Journal of Engineering Design and Technology · doi:10.1108/jedt-08-2021-0432 · Cited by 46 · see citing works
Taofeeq, D. M., Adeleke, A. Q., & Lee, C. K. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2019.1641888 · Cited by 43 · see citing works
Taofeeq, D. M., Adeleke, A. Q., & Lee, C. K. (2019) · Safety Science · doi:10.1016/j.ssci.2019.09.016 · Cited by 42 · see citing works
Ajibike, W. A., Adeleke, A. Q., Mohamad, F. B., Bamgbade, J. A., Nawi, M. N. M., & Moshood, T. D. (2021) · Environmental Challenges · doi:10.1016/j.envc.2021.100161 · Cited by 52 · see citing works
Ebekozien, A. (2021) · International Journal of Building Pathology and Adaptation · doi:10.1108/ijbpa-08-2020-0067 · Cited by 36 · see citing works
Ajibike, W. A., Adeleke, A. Q., Mohamad, F. B., Bamgbade, J. A., & Moshood, T. D. (2021) · International Journal of Construction Management · doi:10.1080/15623599.2021.1929797 · Cited by 39 · see citing works
Xing, M., Luo, X., Zan, Y., Yang, L., Jin, H., & Luo, J. (2023) · Ocean Engineering · doi:10.1016/j.oceaneng.2023.114805 · Cited by 34 · see citing works
Factor's Influencing Contractors Risk Attitude in the Malaysian Construction Industry
Taofeeq, D. M., & Adeleke, A. Q. (2019) · Journal of Construction Business and Management · doi:10.15641/jcbm.3.2.668 · Cited by 33 · see citing works
Analysis of Complexity of Unsafe Behavior in Construction Teams and a Multiagent Simulation
Li, Z., Lv, X., Zhu, H., & Sheng, Z. (2018) · Complexity · doi:10.1155/2018/6568719 · Cited by 32 · see citing works
Moshood, T. D., Adeleke, A. Q., & Lee, C. K. (2020) · Journal of Engineering Design and Technology · doi:10.1108/jedt-08-2019-0192 · Cited by 31 · see citing works
Ufua, D. E., Olujobi, O. J., Tahir, H., Al‐Faryan, M. A. S., Matthew, O. A., & Osabuohien, E. S. C. (2022) · Global Journal of Flexible Systems Management · doi:10.1007/s40171-022-00304-1 · Cited by 29 · see citing works
Appiah, M. K., Akolaa, R. A., & Ayisi-Addo, A. K. (2022) · Cogent Economics & Finance · doi:10.1080/23322039.2022.2071387 · Cited by 34 · see citing works
The Impact of Risk Management Practices on the Performance of Construction Projects
Alsaadi, N., & Norhayatizakuan, N. (2021) · Studies of Applied Economics · doi:10.25115/eea.v39i4.4164 · Cited by 27 · see citing works
Tagod, M., Adeleke, A. Q., & Moshood, T. D. (2021) · Journal of Safety Research · doi:10.1016/j.jsr.2021.02.011 · Cited by 26 · see citing works
Identify the effect of government regulations on the live streaming e-commerce
Shou, M., Yu, J., & Dai, R. (2023) · Industrial Management & Data Systems · doi:10.1108/imds-10-2022-0655 · Cited by 31 · see citing works
AHP-Systems Thinking Analyses for Kaizen Costing Implementation in the Construction Industry
Omotayo, T., Awuzie, B. O., Egbelakin, T., Obi, L. I., & Ogunnusi, M. (2020) · Buildings · doi:10.3390/buildings10120230 · Cited by 27 · see citing works
Factors Affecting Contractor’s Risk Attitude from Malaysia Construction Industry Perspective
Taofeeq, D. M., Adeleke, A. Q., & Hassan, A. K. (2019) · UMP Institutional Repository (Universiti Malaysia Pahang) · Cited by 24 · see citing works
Ahn, S., Kim, T., & Kim, J.-M. (2020) · Sustainability · doi:10.3390/su12083435 · Cited by 22 · see citing works
Risk Factors Affecting the Performance of Construction Projects in Gaza Strip
Tayeh, B. A., Salem, T. J., Aisheh, Y. I. A., & Alaloul, W. S. (2020) · The Open Civil Engineering Journal · doi:10.2174/1874149502014010094 · Cited by 21 · see citing works
Almeile, A. M., Chipulu, M., Ojiako, U., Vahidi, R., & Marshall, A. J. (2022) · Production Planning & Control · doi:10.1080/09537287.2022.2110171 · Cited by 20 · see citing works
Ali, Z., Zhu, F., & Hussain, S. (2018) · Sustainability · doi:10.3390/su10114017 · Cited by 19 · see citing works
Peliu, S.-A. (2024) · Future Business Journal · doi:10.1186/s43093-024-00378-6 · Cited by 18 · see citing works
Project Management Performance and Its Influence on Malaysian Building Projects
Adeleke, A. Q., Bamgbade, J. A., Salimon, M. G., & Lee, C. K. (2019) · KnE Social Sciences · doi:10.18502/kss.v3i22.5058 · Cited by 17 · see citing works
Value Generation in Front-End Design of Social Housing with QFD and Multiattribute Utility Theory
Serugga, J., Kagioglou, M., & Tzortzopoulos, P. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001787 · Cited by 17 · see citing works
Research for Risk Management of Construction Projects in Taiwan
Lin, C., & Chen, B.-K. (2021) · Sustainability · doi:10.3390/su13042034 · Cited by 15 · see citing works
Khalilzadeh, M., Banihashemi, S. A., & Božanić, D. I. (2024) · Decision Making Applications in Management and Engineering · doi:10.31181/dmame712024884 · Cited by 15 · see citing works
An investigation of the influence of economic cycles on safety performance in Western Australia
Jenke, T., Oosthuizen, J. D., & Cattani, M. (2021) · Safety Science · doi:10.1016/j.ssci.2021.105230 · Cited by 15 · see citing works
Taofeeq, D. M., Adeleke, A. Q., & Hassan, A. K. (2019) · UMP Institutional Repository (Universiti Malaysia Pahang) · Cited by 13 · see citing works
Occupational risk perception of construction workers: a cross sectional study
Mastrantonio, R., Cofini, V., Mastrangeli, G., Pettinaro, M., Mastrodomenico, M., & Fabiani, L. (2024) · Frontiers in Public Health · doi:10.3389/fpubh.2024.1338604 · Cited by 13 · see citing works
Evaluation of Risk Management Practice in the Nigeria Construction Industry
Ugwu, M. C., Osunsanmi, T. O., & Aigbavboa, C. O. (2019) · Modular and Offsite Construction (MOC) Summit Proceedings · doi:10.29173/mocs116 · Cited by 12 · see citing works
Khalilzadeh, M., Balafshan, R., & Hafezalkotob, A. (2020) · Journal of Engineering Design and Technology · doi:10.1108/jedt-01-2020-0020 · Cited by 12 · see citing works
Salimon, M. G., Kareem, O., Mokhtar, S. S. M., Yusoff, R. Z., & Gorondutse, A. H. (2019) · GeoJournal of Tourism and Geosites · doi:10.30892/gtg.25207-365 · Cited by 11 · see citing works
Odimabo, O., & Oduoza, C. F. (2018) · Procedia Manufacturing · doi:10.1016/j.promfg.2018.10.091 · Cited by 11 · see citing works
Assessment of Risk Management Maturity of Construction Organisations in Joint Venture Projects
Abdulrahman, R. S., Ibrahim, A. D., & Chindo, P. G. (2019) · Journal of Engineering Project and Production Management · doi:10.2478/jeppm-2019-0004 · Cited by 10 · see citing works
Asamoah, R. O., Baiden, B. K., Nani, G., & Kissi, E. (2020) · International Journal of Construction Management · doi:10.1080/15623599.2020.1774835 · Cited by 10 · see citing works
Foresight for SOE Companies in Indonesia’s Construction Industry: Recognizing Future Opportunities
Wibowo, F. A., Satria, A., Gaol, S. L., & Indrawan, D. (2024) · Sustainability · doi:10.3390/su162310384 · Cited by 9 · see citing works
Borujeni, S. H. A., Zare, M., & Saadabadi, L. A. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-13633 · Cited by 9 · see citing works
Moshood, T. D., Adeleke, A. Q., Nawanir, G., Sorooshian, S., & Ajibike, W. A. (2021) · Applied System Innovation · doi:10.3390/asi4010012 · Cited by 9 · see citing works
Kajumulo, K. J., Matindana, J. M., & Mohamed, F. K. (2024) · Safety · doi:10.3390/safety10030057 · Cited by 8 · see citing works
Masuin, R., Latief, Y., & Zagloel, T. Y. M. (2019) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/258/1/012012 · Cited by 8 · see citing works
Adeleke, A. Q., Ajibike, W. A., Muuka, G. N., Darun, M. R., & Moshood, T. D. (2022) · Construction Economics and Building · doi:10.5130/ajceb.v22i1.7842 · Cited by 9 · see citing works
Moshood, T. D., Adeleke, A., Nawanir, G., Bamgbade, J. A., & Ajibike, W. A. (2020) · International Journal of Construction Supply Chain Management · doi:10.14424/ijcscm100120-01-29 · Cited by 7 · see citing works
Gündüz, M., Abumoza, A. M., & Aly, A. A. (2022) · Engineering Construction & Architectural Management · doi:10.1108/ecam-04-2022-0343 · Cited by 6 · see citing works
Managing External Risk Factors on Oil and Gas Project Success: A Dream for All Firms
Adeleke, A. Q., Ajibike, W. A., Muuka, G. N., Darun, M. R., & Moshood, T. D. (2021) · ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering · doi:10.1061/ajrua6.0001187 · Cited by 6 · see citing works
An, M., Xiao, W., An, H., & Huang, J. (2022) · Buildings · doi:10.3390/buildings12122064 · Cited by 6 · see citing works
Tabatabay, M. A., & Asl, S. T. (2022) · Archives for Technical Sciences · doi:10.59456/afts.2022.0227.033t · Cited by 6 · see citing works
Ebekozien, A., Aigbavboa, C. O., Samsurijan, M. S., Amadi, G. C., & Duru, O. D. S. (2023) · International Journal of Building Pathology and Adaptation · doi:10.1108/ijbpa-01-2023-0007 · Cited by 8 · see citing works
Gao, R., Wang, H., Qi, Y., Li, Y., & Zhang, S. (2024) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2024.103120 · Cited by 5 · see citing works
Riyadi, A., Bafadal, I., Burhanuddin, B., & Timan, A. (2023) · Pedagogika · doi:10.15823/p.2023.149.1 · Cited by 5 · see citing works
Complexity Factors In Mega Projects: A Literature Review
Mohseni, M. R., Tabassi, A. A., Kamal, E. M., Bryde, D., & Michaelides, R. (2019) · European Proceedings of Multidisciplinary Sciences · doi:10.15405/epms.2019.12.6 · Cited by 5 · see citing works
Niayeshnia, P., Damavandi, M. R., & Gholampour, S. (2020) · AIMS energy · doi:10.3934/energy.2020.5.918 · Cited by 5 · see citing works
Analysis of project complexity factors and their interdependencies in metro rail projects
Dara, S., Vilventhan, A., & Gopal, P. R. C. (2023) · Built Environment Project and Asset Management · doi:10.1108/bepam-09-2023-0159 · Cited by 4 · see citing works
Masuin, R., Latief, Y., & Zagloel, T. Y. M. (2019) · MATEC Web of Conferences · doi:10.1051/matecconf/201927602015 · Cited by 4 · see citing works
Effective Risk Management as a Mediator to Enhance the Success of Construction Projects
Kassem, M. A., & Ali, K. N. (2023) · Lecture notes in networks and systems · doi:10.1007/978-3-031-25274-7_15 · Cited by 4 · see citing works
Pangestuti, D. C., Muktiyanto, A., Geraldina, I., & Darmawan, D. (2024) · Investment Management and Financial Innovations · doi:10.21511/imfi.21(2).2024.29 · Cited by 4 · see citing works
Qualitative Analysis of Risks Affecting the Delivery of Land Surveying Project Activities
Issa, U. H., Alqurashi, M., & Salama, I. (2021) · Sustainability · doi:10.3390/su132212645 · Cited by 3 · see citing works
Ajibike, W. A., Adeleke, A. Q., Mohamad, F., Nawi, M. N. M., Bamgbade, J. A., Riazi, S. R. M., & Ahmad, M. F. (2021) · Journal of Advanced Research in Applied Sciences and Engineering Technology · doi:10.2139/ssrn.3783654 · Cited by 3 · see citing works
Lapidus, A. A., Abramov, I., Kuzmina, Т., Abramova, A., & AlZaidi, Z. A. K. (2023) · Buildings · doi:10.3390/buildings13112696 · Cited by 3 · see citing works
Anum, I. (2024) · Journal of Sustainable Cities and Built Environment · doi:10.58757/jscbe.ihdpawsbmhsc.01 · Cited by 3 · see citing works
IDENTIFICATION AND ANALYSIS OF RISKS IN CIVIL ENGINEERING PROJECTS
Marinković, G. D., Milutinović, T., & Božić, M. (2024) · Archives for Technical Sciences · doi:10.59456/afts.2024.1630.045m · Cited by 3 · see citing works
Hassan, A. S. A., Nordin, N. B., & Azamin, A. A. (2021) · Asian Journal of Interdisciplinary Research · doi:10.34256/ajir2119 · Cited by 3 · see citing works
Akintunde, T., & Morel, D. (2023) · SSRN Electronic Journal · doi:10.2139/ssrn.4585886 · Cited by 3 · see citing works
Risk management in a municipal construction enterprise: A theoretical and methodical study
Tworek, P. (2018) · Zarządzanie Publiczne · doi:10.15678/zp.2018.44.2.06 · Cited by 2 · see citing works
Wang, H., Wu, K. Y., & Lv, W. (2022) · BCP Business & Management · doi:10.54691/bcpbm.v30i.2518 · Cited by 2 · see citing works
Aikhuele, D. O., & Ighravwe, D. E. (2020) · Life Cycle Reliability and Safety Engineering · doi:10.1007/s41872-020-00123-2 · Cited by 2 · see citing works
A Life-Cycle Framework for Managing Risks in Public Private Partnership Housing Projects
Sanda, Y. N., Anigbogu, N. A., Nuhu, L. Y., & Ola, O. S. (2020) · Journal of Engineering Project and Production Management · doi:10.2478/jeppm-2020-0004 · Cited by 2 · see citing works
The use of video reflection to enhance EFL pre-service teachers’ teaching practice during practicum
Kwangsawad, T. (2021) · Asian Journal of Interdisciplinary Research · doi:10.34256/ajir21111 · Cited by 2 · see citing works
Filho, R. R. D. A., & da Cruz, F. M. (2022) · Research Society and Development · doi:10.33448/rsd-v11i1.24981 · Cited by 2 · see citing works
Ratnasari, A., & Marfu, A. (2023) · International Journal of Current Science Research and Review · doi:10.47191/ijcsrr/v6-i7-111 · Cited by 2 · see citing works
Risk Factors Affecting Public Infrastructure Projects
Sikhupelo, C., & Amoah, C. (2023) · Civil engineering. · doi:10.5772/intechopen.112002 · Cited by 2 · see citing works
Ismail, R., Othmani, M. I., Said, I., & Wang, D. (2023) · Journal of Technology and Operations Management/Journal of technology and operations management · doi:10.32890/jtom2023.18.2.5 · Cited by 1 · see citing works
Rehman, M. A., Ishak, M. S. B., & Adeleke, A. Q. (2024) · Business Management and Economics Engineering · doi:10.3846/bmee.2024.19883 · Cited by 3 · see citing works
Liu, N., Goh, Y. M., Du, S., & Chua, D. K. (2025) · Advanced Engineering Informatics · doi:10.1016/j.aei.2025.104121 · Cited by 1 · see citing works
Developing Risk Management Policies for Healthcare Providers at Critical Care Units
Haggag, R., Dahshan, M. E., & Ageiz, M. H. (2022) · Menoufia Nursing Journal · doi:10.21608/menj.2022.269727 · Cited by 1 · see citing works
Tabatabay, M. A., & Asl, S. T. (2022) · Archives for Technical Sciences · doi:10.7251/afts.2022.1427.033t · Cited by 1 · see citing works
Influence of Entrepreneurship Orientation on Financial Performance of Construction SMEs in Nigeria
Abdullahi, U., Kunya, S. U., Raji, A. U., & Dsazu, W. E. (2023) · Journal of Sustainable Cities and Built Environment · doi:10.58757/jscbe.ieofpcsn.02 · Cited by 1 · see citing works
Risk Management in Construction - Recent Advances
Tosun, H., Gürsakal, N., & Sebatli-Saglam, A. (2023) · Civil engineering. · doi:10.5772/intechopen.107735 · Cited by 1 · see citing works
Risk-Level Assessment of Construction Risk Management Among the Kingdom of Saudi Arabia Contractors
Rehman, M. A., & Ishak, M. S. B. (2023) · Lecture notes in civil engineering · doi:10.1007/978-981-99-6022-4_1 · Cited by 1 · see citing works
Adriani, Z. A., Raharjo, T., & Trisnawaty, N. W. (2024) · Indonesian Journal of Computer Science · doi:10.33022/ijcs.v13i3.4016 · Cited by 1 · see citing works
Aikhuele, D. O., Ozuor, O., & Fayomi, O. S. I. (2019) · Journal of Physics Conference Series · doi:10.1088/1742-6596/1378/4/042018 · Cited by 1 · see citing works
Terdpaopong, K., Zepp, R. A., & Manapreechadeelert, P. (2018) · Corporate Ownership and Control · doi:10.22495/cocv15i3art11
Front-End Design and Value Generation: A Housing Project Analysis
Serugga, J., Etges, B. M. B. D. S., Bernardi, E., & Kagioglou, M. (2020) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2020/0064
Khan, M. K., Khan, M. W., Khan, K. U. J., Khan, M. I., Khan, M. F. J., & Lodhi, A. S. (2020) · Journal of Engineering and Applied Sciences , University of Engineering and Technology, Peshawar · doi:10.17582/journal.jeas/39.1.47.56
Moshood, T. D. (2020) · UMP Institutional Repository (Universiti Malaysia Pahang)
Enablers of Innovation Implementation within Quantity Surveying Firms in Nigeria
Ajayi, A. A., & Alimi, W. O. (2022) · World Journal of Innovative Research · doi:10.31871/wjir.12.3.5
Rethinking Managerial Practice on Low-Cost Airline Organizational Structures
Charernnit, K., Kankaew, K., Waramontri, R., & Kungwol, K. (2023) · Advances in business strategy and competitive advantage book series · doi:10.4018/978-1-6684-6835-7.ch006
KAHANYA, N. M., & Ondara, A. (2023) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v10i2.2680
Karangkates Railway Tunnel Risk Analysis Based on Ground Penetrating Radar Data
Afif, A. A., Wiyono, W., & Sambah, A. B. (2023) · International Journal of Social Science and Business · doi:10.23887/ijssb.v7i3.56428
Olaleye, B. R., Khumalo, N., & Ayodele, A. E. (2024) · International Conference on Decision Aid Sciences and Applications (DASA) · doi:10.1109/dasa63652.2024.10836497
- Authors
- Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbade, J. A., Salimon, M. G., Khan, M. W. A., & Sorooshian, S.
- Affiliations
- Universiti Malaysia Pahang Al-Sultan Abdullah (MY)
- Universiti Utara Malaysia (MY)
- University of Technology Sarawak (MY)
- Swinburne University of Technology (AU)
- Corresponding author
- Adeleke, A.Q.
- ORCID
- Venue
- Safety and Health at Work
- Publisher
- Elsevier BV
- Published
- 2018-03
- Volume
- 9
- Issue
- 1
- Pages
- 115-124
- ISSN
- 2093-7911 (ISSN-L)
- PMC
- PMC6111111
- OpenAlex
- W2620647389
- Cited by
- 107
- References
- 65
- Citations by year
- 2026: 4 · 2025: 4 · 2024: 12 · 2023: 19 · 2022: 14 · 2021: 16 · 2020: 17 · 2019: 15 · 2018: 6
- FWCI
- 9.20
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Safety and Health at Work (publishedVersion, cc-by-nc-nd)
- Europe PMC (PubMed Central) (publishedVersion, cc-by-nc-nd)
- PubMed Central (publishedVersion, cc-by-nc-nd)
- PubMed (publishedVersion)
- Universiti Utara Malaysia Institutional Repository (Universiti Utara Malaysia) (acceptedVersion)
- UMP Institutional Repository (Universiti Malaysia Pahang) (acceptedVersion)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- Figshare (submittedVersion, cc-by-nc-nd)
- Swinburne figshare (Swinburne University of Technology) (submittedVersion, cc-by-nc-nd)
- Swinburne figshare (Swinburne University of Technology)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Health Sciences › Health Professions › Radiological and Ultrasound Technology › Occupational Health and Safety Research
- Physical Sciences › Engineering › Civil and Structural Engineering › Construction Engineering and Safety
- Keywords
- construction risk management, rules and regulations, organizational control theory, political factors, economic factors, technological factors, construction companies, project duration, Nigeria
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review