The DOI matches its Crossref record; 51 of the 51 references it cites were found in a registry or an index.
Application of a trapezoidal fuzzy AHP method for work safety evaluation and early warning rating of hot and humid environments
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,844
The Concept of a Linguistic Variable and Its Application to Approximate Reasoning—I
Zadeh, L. A. (1975) · Information Sciences · doi:10.1016/0020-0255(75)90036-5 · Cited by 12,187
The concept of a linguistic variable and its application to approximate reasoning-III
Zadeh, L. A. (1975) · Information Sciences · doi:10.1016/0020-0255(75)90017-1 · Cited by 12,139
A scaling method for priorities in hierarchical structures
Saaty, T. L. (1977) · Journal of Mathematical Psychology · doi:10.1016/0022-2496(77)90033-5 · Cited by 10,360
How to Make a Decision: The Analytic Hierarchy Process
Saaty, T. L. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90057-i · Cited by 9,605
Applications of the Extent Analysis Method on Fuzzy AHP
Chang, D.-Y. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00300-2 · Cited by 4,874
A fuzzy extension of Saaty's priority theory
van Laarhoven, P. J. M., & Pedrycz, W. (1983) · Fuzzy Sets and Systems · doi:10.1016/s0165-0114(83)80082-7 · Cited by 3,045
Global supplier development considering risk factors using fuzzy extended AHP-based approach
Chan, F. T. S., & Kumar, N. (2007) · Omega · doi:10.1016/j.omega.2005.08.004 · Cited by 1,246
Multi‐criteria supplier selection using fuzzy AHP
Kahraman, C., Cebeci, U., & Ulukan, Z. (2003) · Logistics Information Management · doi:10.1108/09576050310503367 · Cited by 1,229
Safety climate, safety management practice and safety performance in offshore environments
Mearns, K., Whitaker, S. M., & Flin, R. (2003) · Safety Science · doi:10.1016/s0925-7535(02)00011-5 · Cited by 841
A physiological strain index to evaluate heat stress
Moran, D. S., Shitzer, A., & Pandolf, K. B. (1998) · American Journal of Physiology-Regulatory, Integrative and Comparative Physiology · doi:10.1152/ajpregu.1998.275.1.r129 · Cited by 620
(1957) · PubMed · Cited by 587
Gumus, A. T. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.03.013 · Cited by 552
Effects of heat stress on cognitive performance: the current state of knowledge
Hancock, P. A., & Vasmatzidis, I. (2003) · International Journal of Hyperthermia · doi:10.1080/0265673021000054630 · Cited by 512
Developing a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management
Dağdeviren, M., & Yüksel, İ. (2007) · Information Sciences · doi:10.1016/j.ins.2007.10.016 · Cited by 444
Fuzzy AHP approach for selecting the suitable bridge construction method
Pan, N.-F. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.03.005 · Cited by 361
Die Regulation der Körpertemperatur bei Muskelarbeit1
Nielsen, M. (1938) · Skandinavisches Archiv Für Physiologie · doi:10.1111/j.1748-1716.1938.tb01246.x · Cited by 338
Project risk assessment using the analytic hierarchy process
Mustafa, M. A., & Al-Bahar, J. F. (1991) · IEEE Transactions on Engineering Management · doi:10.1109/17.65759 · Cited by 331
Carr, V, & Tah, J. H. M. (2001) · Advances in Engineering Software · doi:10.1016/s0965-9978(01)00036-9 · Cited by 322
Assessing risk and uncertainty inherent in Chinese highway projects using AHP
Zayed, T., Amer, M., & Pan, J. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.05.012 · Cited by 322
A GP-AHP method for solving group decision-making fuzzy AHP problems
Yu, C.-S. (2002) · Computers & Operations Research · doi:10.1016/s0305-0548(01)00068-5 · Cited by 317
Champoux, D., & Brun, J.-P. (2003) · Safety Science · doi:10.1016/s0925-7535(02)00043-7 · Cited by 294
Age alters the cardiovascular response to direct passive heating
Minson, C. T., Wladkowski, S. L., Cardell, A. F., Pawelczyk, J. A., & Kenney, W. L. (1998) · Journal of Applied Physiology · doi:10.1152/jappl.1998.84.4.1323 · Cited by 287
Lieberman, H. R., Bathalon, G. P., Falco, C. M., Kramer, F. M., Morgan, C. A., & Niro, P. (2005) · Biological Psychiatry · doi:10.1016/j.biopsych.2004.11.014 · Cited by 267
Safety management system: Development and validation of a multidimensional scale
Fernández-Muñiz, B., Montes-Peón, J. M., & Vázquez-Ordás, C. J. (2007) · Journal of Loss Prevention in the Process Industries · doi:10.1016/j.jlp.2006.10.002 · Cited by 248
Determining lines of equal comfort
Houghten, F. C. (1923) · Medical Entomology and Zoology · Cited by 232
Diagnosis of safety culture in safety management audits
Grote, G., & Künzler, C. (2000) · Safety Science · doi:10.1016/s0925-7535(00)00010-2 · Cited by 211
Risk-based maintenance policy selection using AHP and goal programming
Arunraj, N. S., & Maiti, J. (2009) · Safety Science · doi:10.1016/j.ssci.2009.09.005 · Cited by 189
A fuzzy analytic network process (ANP) model to identify faulty behavior risk (FBR) in work system
Dağdeviren, M., Yüksel, İ., & Kurt, M. (2008) · Safety Science · doi:10.1016/j.ssci.2007.02.002 · Cited by 176
THE ANALYTIC HIERARCHY PROCESS IN CONFLICT MANAGEMENT
Saaty, T. L. (1990) · International Journal of Conflict Management · doi:10.1108/eb022672 · Cited by 161
Chiang, C.-M., & Lai, C.-M. (2002) · Building and Environment · doi:10.1016/s0360-1323(01)00034-8 · Cited by 159
Fuzzy Rule-Based Evidential Reasoning Approach for Safety Analysis
Liu, J., Yang, J., Wang, J., Sii, H. S., & Wang, Y. (2004) · International Journal of General Systems · doi:10.1080/03081070310001633536 · Cited by 138
Azadeh, A., Mohammadfam, I., Khoshnoud, M., & Nikafrouz, M. (2008) · Information Sciences · doi:10.1016/j.ins.2008.06.026 · Cited by 137
Productivity model in hot and humid environment based on heat tolerance time analysis
Zhao, J. B., Zhu, N., & Lu, S. (2009) · Building and Environment · doi:10.1016/j.buildenv.2009.01.003 · Cited by 136
Self-citationHeat-Related Deaths Among Crop Workers—United States, 1992-2006
(2008) · JAMA · doi:10.1001/jama.300.9.1017 · Cited by 122
The Analytic Hierarchy Process in an uncertain environment: A simulation approach
Hauser, D. N., & Tadikamalla, P. R. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00002-x · Cited by 118
Nielsen, B. (1966) · Acta Physiologica Scandinavica · doi:10.1111/j.1748-1716.1966.tb03420.x · Cited by 98
Hourly cooling load prediction by a combined forecasting model based on Analytic Hierarchy Process
Yao, Y., Lian, Z., Liu, S., & Hou, Z. (2004) · International Journal of Thermal Sciences · doi:10.1016/j.ijthermalsci.2004.02.009 · Cited by 87
Temperature and Air Pollution as Risk Factors for Heat Stroke in Tokyo, July and August 1980-1995
Piver, W. T., Ando, M., Ye, F., & Portier, C. J. (1999) · Environmental Health Perspectives · doi:10.1289/ehp.99107911 · Cited by 84
Wang, F., Kuklane, K., Gao, C., & Holmér, I. (2011) · Physiological Measurement · doi:10.1088/0967-3334/32/2/007 · Cited by 83
A Valid Method for Comparing Rational and Empirical Heat Stress Indices
Brake, R., & Bates, G. P. (2002) · The Annals of Occupational Hygiene · doi:10.1093/annhyg/mef030 · Cited by 83
Extremes of human heat tolerance: life at the precipice of thermoregulatory failure
Kenney, W. L., DeGroot, D. W., & Holowatz, L. A. (2004) · Journal of Thermal Biology · doi:10.1016/j.jtherbio.2004.08.017 · Cited by 82
Evaluation of the environmental stress index for physiological variables
Moran, D. S., PANDOLF, K. B., Shapiro, Y., Laor, A., Heled, Y., & Gonzalez, R. R. (2002) · Journal of Thermal Biology · doi:10.1016/s0306-4565(02)00035-9 · Cited by 71
INABA, R., & MIRBOD, S. M. (2007) · Industrial Health · doi:10.2486/indhealth.45.91 · Cited by 61
F.A.L.C.A.D.E.: a fuzzy software for the energy and environmental balances of products
Ardente, F., Beccali, M., & Cellura, M. (2004) · Ecological Modelling · doi:10.1016/j.ecolmodel.2003.11.014 · Cited by 51
Assessment of Physiological Severity of Hot Climates
LIND, A. R., & Hellon, R. F. (1957) · Journal of Applied Physiology · doi:10.1152/jappl.1957.11.1.35 · Cited by 42
Evaluation of heat stress in a hot workshop by physiological measurements
Fuller, F. H., & SMITH, P. E. (1981) · American Industrial Hygiene Association Journal · doi:10.1080/15298668191419316 · Cited by 35
Assessment of the risk of occupational accidents using a “fuzzy” approach
Murè, S., Demichela, M., & Piccinini, N. (2006) · Cognition Technology & Work · doi:10.1007/s10111-005-0025-5 · Cited by 32
OSHA HEAT STRESS STANDARDS AND THE WBGT INDEX
Azer, N., Azer, N., & Hsu, S. (1977) · Cited by 14
Kang, H.-Y., Ogunseitan, O. A., Shapiro, A. A., & Schoenung, J. M. (2006) · Environmental Science & Technology · doi:10.1021/es060739u · Cited by 8
Cited by
Mardani, A., Jusoh, A., & Zavadskas, E. K. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.01.003 · Cited by 951
Ilbahar, E., Karaşan, A., Cebi, S., & Kahraman, C. (2018) · Safety Science · doi:10.1016/j.ssci.2017.10.025 · Cited by 573
A state-of the-art survey & testbed of fuzzy AHP (FAHP) applications
Kubler, S., Robert, J., Derigent, W., Voisin, A., & Le Traon, Y. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2016.08.064 · Cited by 441
Podgórski, D. (2015) · Safety Science · doi:10.1016/j.ssci.2014.11.018 · Cited by 312
Metadata
- Authors
- Zheng, G., Zhu, N., Tian, Z., Chen, Y., & Sun, B.
- Venue
- Safety Science
- Publisher
- Elsevier BV
- Published
- 2012-02
- Volume
- 50
- Issue
- 2
- Pages
- 228-239
- ISSN
- 0925-7535 (ISSN-L)
- OpenAlex
- W1972494505
- Cited by
- 381
- References
- 51
- FWCI
- 22.11
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.