The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
A BIM-based system for demolition and renovation waste estimation and planning
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Historic building information modelling (HBIM)
Murphy, M., McGovern, E., & Pavia, S. (2009) · Structural Survey · doi:10.1108/02630800910985108 · Cited by 580
Trend of the research on construction and demolition waste management
Yuan, H., & Shen, L. (2011) · Waste Management · doi:10.1016/j.wasman.2010.10.030 · Cited by 574
A Spanish model for quantification and management of construction waste
Solís-Guzmán, J., Marrero, M., Montes-Delgado, M. V., & Ramírez-de-Arellano, A. (2009) · Waste Management · doi:10.1016/j.wasman.2009.05.009 · Cited by 359
A framework for understanding waste management studies in construction
Lu, W., & Yuan, H. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.018 · Cited by 353
A model for quantifying construction waste in projects according to the European waste list
Llatas, C. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.023 · Cited by 326
Estimating construction and demolition debris generation using a materials flow analysis approach
Cochran, K. M., & Townsend, T. G. (2010) · Waste Management · doi:10.1016/j.wasman.2010.04.008 · Cited by 175
Evaluations of existing waste recycling methods: A Hong Kong study
Tam, V. W. Y., & Tam, C. M. (2006) · Building and Environment · doi:10.1016/j.buildenv.2005.06.017 · Cited by 173 · cited 1×
“Researchers found that lengthy demolition period is one of the major barriers for increasing recycling rate since it is time consuming for contractors to carry on recycling practices (Tam and Tam, 2006).”
BackgroundCOMPOSITION AND CHARACTERISTICS OF CONSTRUCTION WASTE GENERATED BY RESIDENTIAL HOUSING PROJECT
Lau, H. H., Whyte, A., & Law, P. L. (2008) · International Journal of Environmental Research · Cited by 130
The effectiveness of Hong Kong's Construction Waste Disposal Charging Scheme
Hao, J., Hills, M. J., & Tam, V. W. Y. (2008) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x07085345 · Cited by 101
Building Research Establishment, BRE
Crump, D. (2005) · Cited by 100
A guide for managing and minimizing building and demolition waste
Poon, C. S., Yu, A. T. W., & Ng, L. H. (2001) · PolyU Institutional Research Archive (Hong Kong Polytechnic University) · Cited by 86
Rate of Reusable and Recyclable Waste in Construction
Tam, V. W. Y. (2011) · The Open Waste Management Journal · doi:10.2174/1876400201104010028 · Cited by 48
Quantification of construction waste amount
Jalali, S. (2007) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 23
Cited by
Kabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121265 · Cited by 695
Enhancing environmental sustainability over building life cycles through green BIM: A review
Wong, J. K. W., & Zhou, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.003 · Cited by 671
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Sarc, R., Curtis, A., Kandlbauer, L., Khodier, K., Lorber, K. E., & Pomberger, R. (2019) · Waste Management · doi:10.1016/j.wasman.2019.06.035 · Cited by 448
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
Metadata
- Authors
- Cheng, J. C. P., & Ma, L. Y. H.
- Venue
- Waste Management
- Publisher
- Elsevier BV
- Published
- 2013-06
- Volume
- 33
- Issue
- 6
- Pages
- 1539-1551
- ISSN
- 0956-053X (ISSN-L)
- OpenAlex
- W2066162575
- Cited by
- 402
- References
- 13
- FWCI
- 26.57
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.