A BIM-based system for demolition and renovation waste estimation and planning
The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Historic building information modelling (HBIM)
Murphy, M., McGovern, E., & Pavia, S. (2009) · Structural Survey · doi:10.1108/02630800910985108 · Cited by 580
Trend of the research on construction and demolition waste management
Yuan, H., & Shen, L. (2011) · Waste Management · doi:10.1016/j.wasman.2010.10.030 · Cited by 574
A Spanish model for quantification and management of construction waste
Solís-Guzmán, J., Marrero, M., Montes-Delgado, M. V., & Ramírez-de-Arellano, A. (2009) · Waste Management · doi:10.1016/j.wasman.2009.05.009 · Cited by 359
A framework for understanding waste management studies in construction
Lu, W., & Yuan, H. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.018 · Cited by 353
A model for quantifying construction waste in projects according to the European waste list
Llatas, C. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.023 · Cited by 326 · cited 3×
“Source: Llatas (2011).”
MethodInfluentialEstimating construction and demolition debris generation using a materials flow analysis approach
Cochran, K. M., & Townsend, T. G. (2010) · Waste Management · doi:10.1016/j.wasman.2010.04.008 · Cited by 175
Evaluations of existing waste recycling methods: A Hong Kong study
Tam, V. W. Y., & Tam, C. M. (2006) · Building and Environment · doi:10.1016/j.buildenv.2005.06.017 · Cited by 173 · cited 1×
“Researchers found that lengthy demolition period is one of the major barriers for increasing recycling rate since it is time consuming for contractors to carry on recycling practices (Tam and Tam, 2006).”
BackgroundCOMPOSITION AND CHARACTERISTICS OF CONSTRUCTION WASTE GENERATED BY RESIDENTIAL HOUSING PROJECT
Lau, H. H., Whyte, A., & Law, P. L. (2008) · International Journal of Environmental Research · Cited by 130
Building Research Establishment, BRE
Crump, D. (2005) · Cited by 100
The effectiveness of Hong Kong's Construction Waste Disposal Charging Scheme
Hao, J. L., Hills, M. J., & Tam, V. W. Y. (2008) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x07085345 · Cited by 99
Cited by
Kabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121265 · Cited by 695
Enhancing environmental sustainability over building life cycles through green BIM: A review
Wong, J. K. W., & Zhou, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.003 · Cited by 671
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Sarc, R., Curtis, A., Kandlbauer, L., Khodier, K., Lorber, K. E., & Pomberger, R. (2019) · Waste Management · doi:10.1016/j.wasman.2019.06.035 · Cited by 448
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
Quantifying construction and demolition waste: An analytical review
Wu, Z., Yu, A. T. W., Shen, L., & Liu, G. (2014) · Waste Management · doi:10.1016/j.wasman.2014.05.010 · Cited by 400
Jin, R., Yuan, H., & Chen, Q. (2019) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.09.029 · Cited by 380
A review of risk management through BIM and BIM-related technologies
Zou, Y., Kiviniemi, A., & Jones, S. W. (2017) · Safety Science · doi:10.1016/j.ssci.2015.12.027 · Cited by 373
A mixed review of the adoption of Building Information Modelling (BIM) for sustainability
Chong, H.-Y., Lee, C.-Y., & Wang, X. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.09.222 · Cited by 371
Status quo and future directions of construction and demolition waste research: A critical review
Wu, H., Zuo, J., Zillante, G., Wang, J., & Yuan, H. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.118163 · Cited by 358
Santos, R., Costa, A. A., & Grilo, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.005 · Cited by 318
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
Li, X., Wu, P., Shen, G. Q., Wang, X., & Teng, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.09.011 · Cited by 307
Review of built heritage modelling: Integration of HBIM and other information techniques
Yang, X., Grussenmeyer, P., Koehl, M., Macher, H., Murtiyoso, A., & Landes, T. (2020) · Journal of Cultural Heritage · doi:10.1016/j.culher.2020.05.008 · Cited by 287
Disassembly and deconstruction analytics system (D-DAS) for construction in a circular economy
Akanbi, L. A., Oyedele, L. O., Omoteso, K., Bilal, M., Akinade, O. O., Ajayi, A. O., Davila Delgado, J. M., & Owolabi, H. A. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.03.172 · Cited by 270
Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., & Arawomo, O. O. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.01.022 · Cited by 260
Li, J., Zuo, J., Cai, H., & Zillante, G. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.138 · Cited by 259
Song, Y., Wang, X., Tan, Y., Wu, P., Sutrisna, M., Cheng, J. C. P., & Hampson, K. (2017) · ISPRS International Journal of Geo-Information · doi:10.3390/ijgi6120397 · Cited by 237
“BIM is the digital representation of the existing buildings, so it is used for reliable and accurate waste estimation and efficient planning [253,254].”
BackgroundSelf-citationGIS‐based Analysis of Vienna's Material Stock in Buildings
Kleemann, F., Lederer, J., Rechberger, H., & Fellner, J. (2017) · Journal of Industrial Ecology · doi:10.1111/jiec.12446 · Cited by 232
The classification of construction waste material using a deep convolutional neural network
Davis, P., Aziz, F., Newaz, M. T., Sher, W., & Simon, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103481 · Cited by 204
Strategies for minimizing construction and demolition wastes in Malaysia
Esa, M. R., Halog, A., & Rigamonti, L. (2017) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2016.12.014 · Cited by 186
BIM-Based End-of-Lifecycle Decision Making and Digital Deconstruction: Literature Review
Akbarieh, A., Jayasinghe, L. B., Waldmann, D., & Teferle, F. N. (2020) · Sustainability · doi:10.3390/su12072670 · Cited by 183
“In addition to that, the topic of deconstruction is mentioned in several studies hand in hand with renovation in terms of waste production [9,41,69], but there seems to be no comprehensive research on BIM‐based renovations and waste generation that could be investigated in future.”
BackgroundMethodGuerra, B. C., Leite, F., & Faust, K. M. (2020) · Waste Management · doi:10.1016/j.wasman.2020.07.035 · Cited by 177
Informetric analysis and review of literature on the role of BIM in sustainable construction
Santos, R., Costa, A. A., Silvestre, J. D., & Pyl, L. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.02.022 · Cited by 169
Lu, W., Webster, C., Peng, Y., Chen, X., & Zhang, X. (2017) · International Journal of Construction Management · doi:10.1080/15623599.2016.1166548 · Cited by 162
A Circular Built Environment in the Digital Age
(2024) · Circular Economy and Sustainability · doi:10.1007/978-3-031-39675-5 · Cited by 59
Ferriz-Papi, J. A., Lee, A., & Alhawamdeh, M. (2024) · Buildings · doi:10.3390/buildings14051237 · Cited by 42
Scanning and data capturing for BIM-supported resources assessment: a case study
Kovacic, I., & Honic, M. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.032 · Cited by 40
“However, identifying the type and location of materials embedded in buildings is a challenging task (Cheng and Ma 2013).”
BackgroundAlhawamdeh, M., Ferriz-Papi, J. A., & Lee, A. (2024) · Sustainability · doi:10.3390/su16146014 · Cited by 33
Construction and Demolition (C&D) Waste Management and Disposal
Hassan, S. H., Aziz, H. A., Johari, I., & Hung, Y.-T. (2022) · Handbook of Environmental Engineering · doi:10.1007/978-3-030-89336-1_3 · Cited by 16
Metadata
- Authors
- Cheng, J. C. P., & Ma, L. Y. H.
- Venue
- Waste Management
- Publisher
- Elsevier BV
- Published
- 2013-06
- Volume
- 33
- Issue
- 6
- Pages
- 1539-1551
- ISSN
- 0956-053X (ISSN-L)
- OpenAlex
- W2066162575
- Cited by
- 402
- References
- 13
- FWCI
- 26.57
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.