Managing the buyer‐supplier interface for on‐time performance in product development
The DOI matches its Crossref record; 32 of the 32 references it cites were found in a registry or an index.
Abstract
Reducing the time required to develop new products has become an important factor of competition in many industries. This paper empirically tests whether management of the buyer‐supplier interface affects supplier‐related delays and, in turn, if these delays slow the overall project. Product development engineers and engineering managers in 79 assembly industry firms were surveyed to gather the data for this study. Results of analysis of covariance show that working with a supplier that has strong technical capabilities reduces supplier‐related delays. However, the benefits of commonly cited interface management techniques such as early supplier involvement, increasing the supplier's responsibility for design, and greater buyer‐supplier communication were not confirmed. A significant relationship was found between supplier‐related delays and overall project delays. The priority that the buyer's top management places on the project and the degree of technical change were also significantly related to overall project delays.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Organizational Information Requirements, Media Richness and Structural Design
Daft, R. L., & Lengel, R. H. (1986) · Management Science · doi:10.1287/mnsc.32.5.554 · Cited by 9,868
Applied multivariate statistics for the social sciences
Stevens, J. P., & Stevens, J. P. (2001) · doi:10.4324/9781410604491 · Cited by 4,993
Making fast strategic decisions in high-velocity environments
Eisenhardt, K. M. (1989) · Academy of Management Journal · doi:10.2307/256434 · Cited by 3,818
Product development: Past research, present findings and future directions
Brown, S. L., & Eisenhardt, K. M. (1995) · The Academy of Management Review · doi:10.2307/258850 · Cited by 3,777
Information Processing as an Integrating Concept in Organizational Design
Tushman, M. L., & Nadler, D. A. (1978) · The Academy of Management Review · doi:10.2307/257550 · Cited by 2,561
Accelerating Adaptive Processes: Product Innovation in the Global Computer Industry
Eisenhardt, K. M., & Tabrizi, B. N. (1995) · Administrative Science Quarterly · doi:10.2307/2393701 · Cited by 2,426
Product development performance: strategy, organization, and management in the world auto industry
(1991) · Choice Reviews Online · doi:10.5860/choice.29-1591 · Cited by 2,389
Applied Multivariate Statistics for the Social Sciences
Schumm, W. R., & Stevens, J. (1993) · The American Statistician · doi:10.2307/2685203 · Cited by 1,523
Stalk, G., & Hout, T. M. (1990) · Research-Technology Management · doi:10.1080/08956308.1990.11670646 · Cited by 1,269
Time – The Next Source of Competitive Advantage
Stalk, G. (2012) · The Roots of Logistics · doi:10.1007/978-3-642-27922-5_16 · Cited by 1,187
Cited by
Towards a theory of supply chain management: the constructs and measurements
Chen, I. J., & Paulraj, A. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2003.12.007 · Cited by 2,419
Koufteros, X., Vonderembse, M., & Jayaram, J. (2005) · Decision Sciences · doi:10.1111/j.1540-5915.2005.00067.x · Cited by 855
Supply management orientation and supplier/buyer performance
Shin, H., Collier, D. A., & Wilson, D. D. (2000) · Journal of Operations Management · doi:10.1016/s0272-6963(99)00031-5 · Cited by 816
Ragatz, G. L., Handfield, R. B., & Petersen, K. J. (2002) · Journal of Business Research · doi:10.1016/s0148-2963(00)00158-2 · Cited by 676
Supplier evaluations: communication strategies to improve supplier performance
Prahinski, C., & Benton, W. C. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2003.12.005 · Cited by 666
Droge, C., Jayaram, J., & Vickery, S. K. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2004.08.001 · Cited by 660
An exploratory study of the effects of supplier relationships on new product development outcomes
Primo, M. A. M., & Amundson, S. D. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(01)00080-8 · Cited by 457
A Model of Supplier Integration into New Product Development*
Petersen, K. J., Handfield, R. B., & Ragatz, G. L. (2003) · Journal of Product Innovation Management · doi:10.1111/1540-5885.00028 · Cited by 448
Lau, A. K. W., Tang, E., & Yam, R. C. M. (2010) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2010.00749.x · Cited by 427
Managing Supplier Involvement in New Product Development: A Multiple‐Case Study*
Van Echtelt, F. E. A., Wynstra, F., Van Weele, A. J., & Duysters, G. (2008) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2008.00293.x · Cited by 367
Mishra, A. A., & Shah, R. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2008.10.001 · Cited by 361
An Evaluation of Research on Integrated Product Development
Gerwin, D., & Barrowman, N. J. (2002) · Management Science · doi:10.1287/mnsc.48.7.938.2818 · Cited by 356
Johnsen, T. E. (2009) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2009.03.008 · Cited by 343
Understanding antecedents of new product development speed: A meta‐analysis
Chen, J., Damanpour, F., & Reilly, R. R. (2010) · Journal of Operations Management · doi:10.1016/j.jom.2009.07.001 · Cited by 329
Buyer-Supplier Collaboration in Product Development Projects
Hoegl, M., & Wagner, S. M. (2005) · Journal of Management · doi:10.1177/0149206304272291 · Cited by 312
BUYER–SUPPLIER RELATIONSHIPS: DERIVED VALUE OVER TWO DECADES
TERPEND, R., TYLER, B. B., KRAUSE, D. R., & HANDFIELD, R. B. (2008) · Journal of Supply Chain Management · doi:10.1111/j.1745-493x.2008.00053.x · Cited by 300
Managing Supply Risk with Early Supplier Involvement: A Case Study and Research Propositions
Zsidisin, G. A., & Smith, M. E. (2005) · Journal of Supply Chain Management · doi:10.1111/j.1745-493x.2005.04104005.x · Cited by 288
Koufteros, X. A., Vonderembse, M. A., & Doll, W. J. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00018-9 · Cited by 274
Involving suppliers in product development: Insights from R&D directors and project managers
Wagner, S. M., & Hoegl, M. (2006) · Industrial Marketing Management · doi:10.1016/j.indmarman.2005.10.009 · Cited by 263
Concurrent engineering and its consequences
Koufteros, X., Vonderembse, M., & Doll, W. (2001) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00048-6 · Cited by 261
Managing supplier involvement in product development:
Wynstra, F., van Weele, A., & Weggemann, M. (2001) · European Management Journal · doi:10.1016/s0263-2373(00)00090-6 · Cited by 248
“quality of the final product (Hartley, 1994; Hartley et al., 1997; McCutcheon et al., 1997).”
BackgroundEarly supplier integration: the dual role of purchasing in new product development
Schiele, H. (2010) · R&D Management · doi:10.1111/j.1467-9310.2010.00602.x · Cited by 240
Narayanan, S., Narasimhan, R., & Schoenherr, T. (2015) · Journal of Operations Management · doi:10.1016/j.jom.2014.11.004 · Cited by 221
He, Y., Keung Lai, K., Sun, H., & Chen, Y. (2014) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.04.044 · Cited by 217
Communication intensity, goal congruence, and uncertainty in buyer–supplier new product development
Yan, T., & Dooley, K. J. (2013) · Journal of Operations Management · doi:10.1016/j.jom.2013.10.001 · Cited by 210
The path of innovation: purchasing and supplier involvement into new product development
Luzzini, D., Amann, M., Caniato, F., Essig, M., & Ronchi, S. (2015) · Industrial Marketing Management · doi:10.1016/j.indmarman.2015.02.034 · Cited by 205
“…Bonaccorsi, 1997), lead time reduction (Clark, 1989; Wasti & Liker, 1997; Ragatz et al. 1997), reduced development costs and time (Clark, 1989; Hartley, 1997), better product performance and design (Bonaccorsi & Lipparini, 1994; Kamath & Liker, 1994; Ragatz et al., 1997), better product…”
Survey research in operations management: historical analyses
Rungtusanatham, M. J., Choi, T. Y., Hollingworth, D. G., Wu, Z., & Forza, C. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(03)00020-2 · Cited by 183
Dröge, C., Jayaram, J., & Vickery, S. K. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(99)00009-0 · Cited by 182
Vickery, S. K., Droge, C., Stank, T. P., Goldsby, T. J., & Markland, R. E. (2004) · Management Science · doi:10.1287/mnsc.1040.0248 · Cited by 182
Hopkins, J. L. (2021) · Computers in Industry · doi:10.1016/j.compind.2020.103323 · Cited by 179
SUPPLIER INNOVATIVENESS AND SUPPLIER PRICING: THE ROLE OF PREFERRED CUSTOMER STATUS
SCHIELE, H., VELDMAN, J., & HÜTTINGER, L. (2011) · International Journal of Innovation Management · doi:10.1142/s1363919611003064 · Cited by 179
“The failure to consider the preferred customer status with suppliers may provide a new explanation for the often observed phenomenon of supplier obstructionism in collaborative development (Hartley et al., 1997a; Flynn et al., 2000; Primo and Amundson, 2002; Wognum et al., 2002; Petroni and Panciroli, 2002; Rutten, 20…”
BackgroundAfraz, M. F., Bhatti, S. H., Ferraris, A., & Couturier, J. (2021) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2020.120370 · Cited by 177
Early supplier involvement in the design process: lessons from the electronics industry
McIvor, R. (2004) · Omega · doi:10.1016/j.omega.2003.09.005 · Cited by 174
Lam, P.-K., & Chin, K.-S. (2005) · Industrial Marketing Management · doi:10.1016/j.indmarman.2004.12.006 · Cited by 172
Research opportunities in service process design
Hill, A. V., Collier, D. A., Froehle, C. M., Goodale, J. C., Metters, R. D., & Verma, R. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(01)00092-4 · Cited by 169
“ESI provides engineering design services for the customer (Dowlatshahi, 2000; Hartley et al., 1997).”
BackgroundSuppliers' contributions to product development: an exploratory study
Hartley, J. L., Meredith, J. R., McCutcheon, D., & Kamath, E. R. (1997) · IEEE Transactions on Engineering Management · doi:10.1109/17.618077 · Cited by 168
“Although previous research [14], [ 18 ], [29] found that early supplier involvement did not necessarily reduce development time, our findings suggest that overall product-development technical goals are more likely to be attained when suppliers are involved early.”
BackgroundMethodResultInfluentialSelf-citation
Metadata
- Authors
- Hartley, J. L., Zirger, B. J., & Kamath, R. R.
- Venue
- Journal of Operations Management
- Publisher
- Wiley
- Published
- 1997-02
- Volume
- 15
- Issue
- 1
- Pages
- 57-70
- ISSN
- 0272-6963 (ISSN-L)
- 1873-1317
- OpenAlex
- W2045902367
- Cited by
- 259
- References
- 32
- FWCI
- 8.65
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.