Models of Construction Innovation
The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Abstract
Construction innovation offers the potential for significant company, industry, and societal benefits. The objective of this paper is to present five models of construction innovation, which can provide a basis upon which companies can select and implement the innovations. Based upon current management and economic theories of innovations, the models reflect the unique conditions of constructed facilities, including the scale, complexity, and longevity of the facilities, as well as their organizational and social contexts. The innovations are differentiated by their degree of change from current practice, and their links to other components and systems. The five models are incremental, modular, architectural, system, and radical innovations. Using this categorization of innovations, companies can plan their implementation activities with respect to timing of commitment, coordination among the project team, special resources, and level of supervisory activity. Examples of construction innovations in each category are discussed.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Theory of Economic Development
Schumpeter, J., & Backhaus, U. (2006) · The European Heritage in Economics and the Social Sciences · doi:10.1007/0-306-48082-4_3 · Cited by 22,506
An Evolutionary Theory of Economic Change.
Loasby, B. J., Nelson, R. R., & Winter, S. G. (1983) · The Economic Journal · doi:10.2307/2232409 · Cited by 21,366
Henderson, R. M., & Clark, K. B. (1990) · Administrative Science Quarterly · doi:10.2307/2393549 · Cited by 8,357
Technological paradigms and technological trajectories
Dosi, G. (1982) · Research Policy · doi:10.1016/0048-7333(82)90016-6 · Cited by 6,685
The Economics of Industrial Innovation
Soete, L., & Freeman, C. (2012) · Routledge eBooks · doi:10.4324/9780203357637 · Cited by 4,744
Patterns of Industrial Innovation
Abernathy, W. J., & Utterback, J. M. (1978) · Technology Review · Cited by 3,331
An evolutionary theory of economic change
Wright, G. (1982) · Technology in Society · doi:10.1016/0160-791x(82)90007-0 · Cited by 3,194
In search of useful theory of innovation
Nelson, R. R., & Winter, S. G. (1977) · Research Policy · doi:10.1016/0048-7333(77)90029-4 · Cited by 1,616
In search of useful theory of innovation
Nelson, R., & Winter, S. (1993) · Research Policy · doi:10.1016/0048-7333(93)90053-k · Cited by 1,386
Readings in the Management of Innovation
Tushman, M. L., & Moore, W. L. (1988) · Medical Entomology and Zoology · Cited by 749
Cited by
Key influences on construction innovation
Blayse, A. M., & Manley, K. (2004) · Construction Innovation · doi:10.1108/14714170410815060 · Cited by 527
Golparvar-Fard, M., Peña-Mora, F., Arboleda, C. A., & Lee, S. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2009)23:6(391 · Cited by 259
Implementing innovation in construction: contexts, relative boundedness and actor‐network theory
Harty, C. (2008) · Construction Management and Economics · doi:10.1080/01446190802298413 · Cited by 241
“For mediating the process of coordinating system innovation, Slaughter places great emphasis on the ability of individuals; ‘the innovator also is able to … achieve coordination and cooperation actors the system(s)’ (Slaughter, 1998, p. 228).”
BackgroundMethodBuilding competitive advantage: innovation and corporate governance in European construction
Miozzo, M., & Dewick, P. (2002) · Research Policy · doi:10.1016/s0048-7333(01)00173-1 · Cited by 221
Critical Success Factors for Competitiveness of Contractors: China Study
Lu, W., Shen, L., & Yam, M. C. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:12(972 · Cited by 205
“The importance of considering technology and RD Hampson and Tatum 1997.”
Hosseini, M. R., Banihashemi, S., Chileshe, N., Namzadi, M. O., Udaeja, C., Rameezdeen, R., & McCuen, T. (2016) · Construction Economics and Building · doi:10.5130/ajceb.v16i3.5159 · Cited by 195
“For the construction context, Slaughter (1998) described an innovation as the actual use of a non-trivial alteration in terms of an enhancement in a system or working procedure that is new to the corresponding organisation.”
BackgroundMethodEnabling and measuring innovation in the construction industry
Gambatese, J. A., & Hallowell, M. (2011) · Construction Management and Economics · doi:10.1080/01446193.2011.570357 · Cited by 190
“Innovation, the implementation of a process, system or product that is new to an organization, can lead to decreases in cost and schedule, and improvements in quality and safety along with an increase in market share, a competitive advantage and increased technical feasibility of projects (Madewell, 1986; Slaughter, 1…”
BackgroundMethodInfluentialCritical risk factors in the application of modular integrated construction: a systematic review
Wuni, I. Y., Shen, G. Q. P., & Mahmud, A. T. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2019.1613212 · Cited by 185
“Slaughter (1998) described MiC as an innovation because it involves significant changes to the design, procurement, engineering and delivery of construction projects.”
MethodLast among equals: a comparison of innovation in construction, services and manufacturing in the UK
Reichstein, T., Salter, A. J., & Gann, D. M. (2005) · Construction Management and Economics · doi:10.1080/01446190500126940 · Cited by 184
“…have been able to make a range of different organizational, managerial or technological innovations to overcome the limits of their environment (Slaughter, 1993; 1998; Veshosky, 1998; Koskela and Vrijhoef, 2001; Sexton and Barret, 2003; Cleasby, 2004); yet there have been relatively few…”
BackgroundCao, D., Li, H., Wang, G., & Huang, T. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.02.002 · Cited by 177
“According to the classification of construction innovations by Slaughter (1998), BIM is a typical systemic innovation.”
MethodAkbari, M., Bagheri, A., Imani, S., & Asadnezhad, M. (2020) · European Journal of Innovation Management · doi:10.1108/ejim-10-2019-0283 · Cited by 173
Sexton, M., & Barrett, P. (2003) · Construction Management and Economics · doi:10.1080/0144619032000134147 · Cited by 161
“…Management and Economics (September 2003) 21, 613–622 firms have always demonstrated an ability to innovate (for example, see Slaughter, 1998), construction practitioners are now very much getting to grips with the need for, and management of, innovation as an explicit…”
BackgroundChileshe, N., Rameezdeen, R., Hosseini, M. R., Martek, I., Li, H. X., & Panjehbashi-Aghdam, P. (2018) · Waste Management · doi:10.1016/j.wasman.2018.07.013 · Cited by 144
Matinaro, V., & Liu, Y. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.10.151 · Cited by 96
Metadata
- Authors
- Slaughter, E. S.
- Venue
- Journal of Construction Engineering and Management
- Published
- 1998-05
- Volume
- 124
- Issue
- 3
- Pages
- 226-231
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(1998)124:3(226
- OpenAlex
- W2169629038
- Cited by
- 549
- References
- 16
- FWCI
- 5.97
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.