Interaction of Lean and Building Information Modeling in Construction
Open accessThe DOI matches its Crossref record; 29 of the 29 references it cites were found in a registry or an index.
Abstract
Lean construction and building information modeling (BIM) are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, 56 interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers, and developers of information technology systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Star, S. L., & Griesemer, J. R. (1989) · Social Studies of Science · doi:10.1177/030631289019003001 · Cited by 10,847
Deming, W. E. (1982) · Medical Entomology and Zoology · Cited by 7,297
Economic Control of Quality of Manufactured Product.
Hotelling, H., & Shewhart, W. A. (1932) · Journal of the American Statistical Association · doi:10.2307/2277676 · Cited by 3,070
An exploration towards a production theory and its application to construction
Koskela, L. (2000) · Aaltodoc (Aalto University) · Cited by 1,868
Self-citationApplication of the New Production Philosophy to Construction
Koskela, L., & Koskela, L. (1992) · Cited by 1,398
Self-citationEconomic control of quality of manufactured product
Elkinton, H. W. (1932) · Journal of the Franklin Institute · doi:10.1016/s0016-0032(32)91043-6 · Cited by 1,247
Liker, J. Κ. (2003) · Cited by 1,134
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008) · Wiley eBooks · doi:10.1002/9780470261309 · Cited by 889
Self-citationAutomatic rule-based checking of building designs
Eastman, C., Lee, J.-M., Jeong, Y.-S., & Lee, J.-K. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.07.002 · Cited by 729
Taguchi on Robust Technology Development: Bringing Quality Engineering Upstream
Taguchi, G. (1993) · ASME Press eBooks · doi:10.1115/1.800288 · Cited by 536
Cited by
Application Areas and Data Requirements for BIM-Enabled Facilities Management
Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000433 · Cited by 915
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
“This is one of the key potential synergies of lean construction and BIM (Sacks et al., 2010).”
BackgroundSelf-citationBuilding Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
Mapping the managerial areas of Building Information Modeling (BIM) using scientometric analysis
He, Q., Wang, G., Luo, L., Shi, Q., Xie, J., & Meng, X. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.08.001 · Cited by 351
Chan, D. W. M., Olawumi, T. O., & Ho, A. M. L. (2019) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.100764 · Cited by 342
Ding, L., Zhou, Y., & Akinci, B. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.009 · Cited by 330
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
Li, X., Wu, P., Shen, G. Q., Wang, X., & Teng, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.09.011 · Cited by 307
Construction safety and digital design: A review
Zhou, W., Whyte, J., & Sacks, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.07.005 · Cited by 303
Self-citationPatterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis
Yalcinkaya, M., & Singh, V. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.012 · Cited by 272
Saieg, P., Sotelino, E. D., Nascimento, D., & Caiado, R. G. G. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.11.030 · Cited by 237
A BIM-aided construction waste minimisation framework
Liu, Z., Osmani, M., Demian, P., & Baldwin, A. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.020 · Cited by 214
“The limited yet growing research in the field covers BIM-enhanced coordination for CWM [1], BIM-enhanced design waste minimisation [57, 65, 85], BIM-enhanced on-site waste management [32, 53, 64, 73], and BIM-enhanced demolition waste management [15, 31].”
BackgroundBortolini, R., Formoso, C. T., & Viana, D. D. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.11.031 · Cited by 211
Antwi-Afari, M. F., Li, H., Pärn, E. A., & Edwards, D. J. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.010 · Cited by 210
BIM-based Last Planner System tool for improving construction project management
Heigermoser, D., García de Soto, B., Abbott, E. L. S., & Chua, D. K. H. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.019 · Cited by 201
Key factors for the BIM adoption by architects: a China study
Ding, Z., Zuo, J., Wu, J., & Wang, J. (2015) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-04-2015-0053 · Cited by 196
Olawumi, T. O., & Chan, D. W. M. (2018) · Sustainable Cities and Society · doi:10.1016/j.scs.2018.03.033 · Cited by 189
Lean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
“The application and adaptation of the underlying concepts and principles of lean thinking to construction is referred to as Lean construction (LC) (Sacks et al. 2010).”
BackgroundSelf-citation
Metadata
- Authors
- Sacks, R., Koskela, L., Dave, B. A., & Owen, R.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2010-09
- Volume
- 136
- Issue
- 9
- Pages
- 968-980
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2053331055
- Cited by
- 689
- References
- 29
- FWCI
- 49.62
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.