Risk Paths in International Construction Projects: Case Study from Chinese Contractors
Open accessThe DOI matches its Crossref record; 76 of the 76 references it cites were found in a registry or an index.
Abstract
AbstractContracting in overseas construction markets involves not only the typical risks at home, but also the complex and diverse risks peculiar to international transactions. In addition, international construction project risks are highly interdependent. The objectives of this study are to (1) explore the risk paths in the international construction projects performed by Chinese contractors, and (2) examine the risk effects on the objectives of these projects. To achieve the research objectives, a total of 60 risks were identified from literature review and a questionnaire survey was conducted with 104 professionals from Chinese international contractors. Adopting the structural equation modeling technique, this study proposed a networking of 20 significant risk paths. Specifically, host government–related risk, contractor’s lack of experience, and contractors’ lack of managerial skills had significant effect on project cost, quality, and schedule objectives, respectively. Moreover, host government–rel...
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Ignoring the interdependence of risks can result in an ineffective reflection of the actual risk conditions associated with construction projects. It may provide less reliable risk assessment results for decision-making [4].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [4]
Citations
Cites
Evaluating Structural Equation Models with Unobservable Variables and Measurement Error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.2307/3151312 · Cited by 109,314 · cited 1×
“Social risk R20 Language barrier Zhi (1995), Hastak and Shaked (2000), and Han and Diekmann (2001b) R21 Differences in religious or culture tradition Zhi (1995), Han and Diekmann (2001a), Dikmen and Birgonul (2006), Dikmen et al.”
BackgroundEvaluating structural equation models with unobservable variables and measurement error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.1177/002224378101800104 · Cited by 109,190
Pls-Sem: indeed a silver bullet
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011) · Journal of Marketing Theory and Practice · doi:10.2753/mtp1069-6679190202 · Cited by 21,631
中華人民共和国国家統計局 (1988) · Medical Entomology and Zoology · Cited by 12,443
Bootstrap Methods and their Application
Davison, A. C., & Hinkley, D. V. (1997) · doi:10.1017/cbo9780511802843 · Cited by 7,350
Modern Methods for Business Research
(1998) · doi:10.4324/9781410604385 · Cited by 6,534
Better Bootstrap Confidence Intervals
Efron, B. (1987) · Journal of the American Statistical Association · doi:10.1080/01621459.1987.10478410 · Cited by 3,364
Megaprojects and Risk: An Anatomy of Ambition
Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9781107050891 · Cited by 2,415
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
How to factor-analyze your data right: do’s, don’ts, and how-to’s.
Matsunaga, M. (2010) · International Journal of Psychological Research · doi:10.21500/20112084.854 · Cited by 1,419 · cited 2×
“Country level Macroeconomic risk R01 Fluctuation in currency exchange rates Wang et al. (2004), Dikmen and Birgonul (2006), Dikmen et al.”
Background
Research works printed but not linked: 3
- Cendrowski H., 2009, Enterprise risk management and COSO: A guide for directors, executives, and practitioners
- Patton M. Q., 2001, Qualitative research & evaluation components
- Zou P. X. Zhang G. and Wang J.-Y. (2006). “Identifying key risks in construction projects: Life cycle and stakeholder perspectives.” Pacific Rim Real Estate Society Conf. Univ. of Auckland Business School Auckland New Zealand.
Cited by
Items 101–200 of 207
Bashir, H. A., Hamdan, S., Ojiako, U., Haridy, S., Shamsuzzaman, M., & Zarooni, H. A. A. (2023) · Engineering Management Journal · doi:10.1080/10429247.2022.2162305 · Cited by 22
“Unlike previous studies that utilized SEM for identifying risk paths (Eybpoosh et al., 2011; Liu et al., 2016), this study defined a propagation path in a risk network as a sequence of linked RFs starting from a root cause node and ending with the project delays node.”
BackgroundMethodResultDer Knacks and a Silver Bullet
Sarstedt, M. (2019) · Springer eBooks · doi:10.1007/978-3-030-06031-2_19 · Cited by 16
Exploring the Critical Risk Factors of Public–Private Partnership City Hospital Projects in Turkey
Erdem, T. D., Birgönül, Z., Bilgin, G., & Akçay, E. C. (2024) · Buildings · doi:10.3390/buildings14020498 · Cited by 15
Babalola, O. G., Bhuiyan, M. M. A., & Hammad, A. (2024) · Sustainability · doi:10.3390/su16177707 · Cited by 15
Viswanathan, S. K., & Jha, K. N. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2019-0265 · Cited by 17
Huangfu, Y., Xu, J., Zhang, Y., Huang, D., & Chang, J. (2023) · PLoS ONE · doi:10.1371/journal.pone.0285497 · Cited by 14
MANAGERIAL DRIVERS OF CHINESE LABOUR LOYALTY IN INTERNATIONAL CONSTRUCTION PROJECTS
Zhu, W., Zeng, R., Li, X., Zhu, Y., & Zhang, Z. (2017) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2017.1381644 · Cited by 15
“…hazardous and stressful job conditions, low pay, national culture diversity, and the transient nature of construction workers (Chih et al. 2016; Liu et al. 2016; Steele, Sodhi 2006), resulting in potential risks to international project performance in many ways accordingly, including…”
BackgroundEmpowering Risk Communication: Use of Visualizations to Describe Project Risks
Atasoy, G., Ertaymaz, U., Dikmen, İ., & Birgönül, M. T. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002265 · Cited by 15
Algremazy, N. A., Zakaria, I., Alferjany, M. A., & Akram, A. R. M. (2023) · International Journal of Professional Business Review · doi:10.26668/businessreview/2023.v8i6.1420 · Cited by 26
Cultural and Economic Risks Factors in UAE Construction Projects
Hasani, M. A. (2018) · International Journal of Academic Research in Business and Social Sciences · doi:10.6007/ijarbss/v8-i12/5044 · Cited by 13
“Construction is both project-based and multi-organisational, making it one of the most risky, difficult and dynamic industries (Ghahramanzadeh, 2013; Hanna et al., 2013; Hwang et al., 2017; Iqbal et al., 2015; Liu et al., 2016; Lyons & Skitmore, 2004; Mills, 2001; Sambasivan et al., 2017; Serpella et al., 2014; Zhi, 1…”
BackgroundAl-Mhdawi, M. K. S., Brito, M. P., Onggo, B. S., Qazi, A. J., O’Connor, A., Ayyub, B. M., & Chan, A. P. C. (2023) · ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering · doi:10.1061/ajrua6.rueng-1008 · Cited by 20
An exploratory study of team conflict in the capital investment decision-making process
Lefley, F. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-04-2017-0045 · Cited by 16
Exploring Internationally Operated Construction Projects through the Critical Incident Technique
Haussner, D., Maemura, Y., & Matouš, P. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000626 · Cited by 16
Bayat, F., Noorzai, E., & Golabchi, M. (2019) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-08-2018-0045 · Cited by 15
Ma, D., Li, X., & Cheng, C. (2020) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2020.13749 · Cited by 15
“With the development of the world economy and the acceleration of globalization, the business scope of contractors is expanding globally (Liu et al., 2016).”
BackgroundRISK CAUSATION MODEL TO CAPTURE AND TRANSFER KNOWLEDGE IN INTERNATIONAL CONSTRUCTION PROJECTS
Zhu, F., Hu, H., & Xu, F. (2022) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2022.16925 · Cited by 12
Stressors and job burnout of Chinese expatriate construction professionals
Abdalla, A., Li, X., & Yang, F. (2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam-03-2023-0237 · Cited by 15
Locomotive Model for International Competitive Advantages Paths of High-Speed Railway Contractors
Niu, Y., Zhao, X., Wang, Y., & Deng, X. (2021) · Journal of Infrastructure Systems · doi:10.1061/(asce)is.1943-555x.0000600 · Cited by 12
Self-citationOwusu‐Manu, D., Ghansah, F. A., Darko, A., Asiedu, R. O., & Edwards, D. J. (2020) · Journal of Engineering Design and Technology · doi:10.1108/jedt-10-2019-0265 · Cited by 11
Niu, Y., Li, H., Ye, K., Mahmoudi, A., & Deng, X. (2022) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-022-1649-1 · Cited by 11
“PLS-SEM was widely employed in analyzing the path model (Liu et al., 2016; Zhao et al., 2018), which makes it an appropriate method for this research.”
BackgroundMethodInfluentialWang, Q., Xiong, Z., Zhu, K., & Guo, P. (2023) · Buildings · doi:10.3390/buildings13051335 · Cited by 11
“To explore the risks of undertaking international construction projects, Liu et al. (2016) [14] used an SEM to build 20 network paths for important risks.”
Risk Management as a Success Factor in the International Activity of Spanish Engineering
Lozano-Torró, A., García-Segura, T., Montalbán-Domingo, L., & Pellicer, E. (2019) · Administrative Sciences · doi:10.3390/admsci9010015 · Cited by 13
“Liu et al. (2016) explored the risk pathways in international construction projects undertaken by Chinese contractors, and examined the effects of risks on project objectives.”
BackgroundZhan, H., Hwang, B., & Yin, J. C. X. (2025) · Journal of Management in Engineering · doi:10.1061/jmenea.meeng-7193 · Cited by 10
Li, Y., Zhang, Y., Li, Y., & Ding, R. (2023) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2023.3330650 · Cited by 10
“First, international contractors are generally plagued by a variety of political and societal events, material shortages, natural disasters, and other challenges that severely hamper the economic sustainability of projects [5], [120].”
BackgroundAhmad, T., Stephan, A., Purwaningrum, D. A., Gulzar, S., de Vecchi, R., Ahmed, M., Cândido, C., Sadek, A. H., & Qrayeiah, W. (2024) · Journal of Building Engineering · doi:10.1016/j.jobe.2024.110391 · Cited by 9
What Enables a High-Risk Project to Yield High Return from a Construction Contractor’s Perspective?
Won, J. W., Jung, W., Han, S. H., Yun, S., & Koo, B. (2019) · Sustainability · doi:10.3390/su11215971 · Cited by 12
Jokar, E., Aminnejad, B., & Lork, A. (2022) · Australian Journal of Civil Engineering · doi:10.1080/14488353.2022.2083288 · Cited by 10
Green building adoption in Qatar: PLS-SEM-based analysis of drivers and barriers
Ahmad, T., Gündüz, M., & Madkoor, A. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2024-0124 · Cited by 9
Interaction effect of building construction accident attributes based on complex network
Cao, D., & Cheng, L. (2023) · Process Safety Progress · doi:10.1002/prs.12556 · Cited by 9
Pienaar, J., & Zhao, X. (2017) · Journal of Professional Issues in Engineering Education and Practice · doi:10.1061/(asce)ei.1943-5541.0000341 · Cited by 9
Self-citationRisk Analysis in Construction Phase of Oil and Gas Projects: A Critical Literature Review
Alavi, H. S., & Nadir, S. L. (2020) · Multidisciplinary Aspects of Production Engineering · doi:10.2478/mape-2020-0056 · Cited by 9
Ghosh, V., Kabra, G., & Mukerjee, H. S. (2021) · International Journal of Knowledge Management · doi:10.4018/ijkm.290024 · Cited by 11
Roy, V., Desjardins, D., Fertel, C., & Ouellet‐Plamondon, C. (2022) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/(asce)la.1943-4170.0000553 · Cited by 10
Performance of Chinese International Contractors in Sub-Saharan Africa: Evidence from Uganda
Mutikanga, H. E., Kayondo, M., & Akita, C. S. (2023) · Journal of Management in Engineering · doi:10.1061/jmenea.meeng-5167 · Cited by 8
Propagation Analysis and Assessment for the Risks in EPC Projects
Zhang, H., & Alhashedi, E. (2025) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-16233 · Cited by 9
Risk Management Practices in Ethiopian Somali Regional State Construction Projects
Kıvrak, S., & Udan, O. H. (2023) · Buildings · doi:10.3390/buildings13123130 · Cited by 7
Amaechi, C. V., Ullah, S., Deng, X., Beddu, S. B., Ja’e, I. A., Mohamed, D. B., & Syamsir, A. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2024-0663 · Cited by 7
Xue, Y., Le, Y., Jia, F., & Peng, T. (2025) · Journal of Management in Engineering · doi:10.1061/jmenea.meeng-6726 · Cited by 8
Understanding Risk and Uncertainty Management Practice in Complex Projects
Hasani, M. A., & Regan, M. (2017) · European Journal of Economics Law and Politics · doi:10.19044/elp.v4no4a3 · Cited by 7
“The importance of considering human epistemological expectations in relation to cognitive decision-making and an individual’s perception of the behaviour of the future is essential in the accurate assessment of risk (Liu et al., 2016; Sambasivan et al., 2017).”
BackgroundThe Conceptual Model of Belt and Road Infrastructure Projects
Andrić, J. M., Wang, J., Zou, P. X. W., & Zhong, R. (2021) · Springer eBooks · doi:10.1007/978-981-15-3977-0_24 · Cited by 7
AL-Smadi, S. A.-D. W., & Alhndawi, A. H. Y. (2021) · East African Journal of Engineering · doi:10.37284/eaje.4.1.442 · Cited by 7
“According to (Liu et al., 2016) and (Goh et al., 2013), the protection of proprietary information and late handing over the project due to the inspection of numerous parties are considered risks we have to take in our consideration while choosing the project management approaches.”
BackgroundYan, D., Zhu, Q., Gu, S., & Wang, Q. (2025) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2025.111922 · Cited by 6
Anbar, D. R., Chang, T., Ullah, S., Alqershy, M. T., Mousa, K., & Deng, X. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-04-2024-0486 · Cited by 7
Dang, X., Liu, L., Deng, X., Zhang, N., & Cheng, M. (2025) · Sustainability · doi:10.3390/su17073149 · Cited by 6
Ghani, E. K., Hassin, N. H. N., & Muhammad, K. (2019) · International Journal of Financial Research · doi:10.5430/ijfr.v10n3p144 · Cited by 6
Xiang, P., Yang, S., Yuan, Y., & Li, R. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-11-2023-1102 · Cited by 6
Risk Assessment for International Construction Projects
Uğural, M. N. (2023) · International Journal of Innovative Engineering Applications · doi:10.46460/ijiea.1114344 · Cited by 7
Complexity-based risk decision framework for cost overrun using fuzzy Bayesian network
Afzal, F., Afzal, F., Junaid, D., Shah, I. A., & Shao, Y. (2023) · Soft Computing · doi:10.1007/s00500-023-07983-7 · Cited by 6
Gatitu, J. N., Kabubo, C., & Ajwang, P. O. (2020) · Engineering Technology & Applied Science Research · doi:10.48084/etasr.3737 · Cited by 6
“It has been reported that most variation orders are likely to impact constriction works adversely [21-23].”
BackgroundCoopetition capability of international joint ventures for high-speed railway projects
Niu, Y.-L., Li, H., Xia, B., & Deng, X.-P. (2023) · International Journal of Construction Management · doi:10.1080/15623599.2023.2289752 · Cited by 4
“…as a method in both academic and practical areas for reasons including small sample size, non-normal data, and formative indicators (Zeng et al. 2021), and many scholars have applied PLS-SEM to path analysis (Liu et al. 2016; Zhao et al. 2018), which makes it an appropriate method for this study.”
Peng, Y., Zhang, F., Lin, S., & Dang, P. (2025) · Engineering Construction & Architectural Management · doi:10.1108/ecam-10-2024-1338 · Cited by 5
Perspective Chapter: Recent Advancements in the Management of Construction Risks
Muhammed-Yakubu, N. T. (2024) · Civil engineering. · doi:10.5772/intechopen.112849 · Cited by 6
Luo, M., Hwang, B., Zhao, X., & Deng, X. (2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2022-0488 · Cited by 5
Self-citationAssessing Risks Associated with BIM Adoption: An Empirical Study in China
Zhao, X., & Wu, G. (2017) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784481080.006 · Cited by 5
Self-citationCritical Risks Associated with BIM Adoption: A Case of Singapore
Zhao, X., Pienaar, J., & Gao, S. (2017) · Springer eBooks · doi:10.1007/978-981-10-6190-5_53 · Cited by 5
Self-citationThe risk of involving foreign contractors in the Norwegian infrastructure market
Pedersen, A. L., Utkilen, S., Wondimu, P. A., & Torp, O. (2021) · Procedia Computer Science · doi:10.1016/j.procs.2021.01.317 · Cited by 5
Aikpokhio, B. N., Gambo, N., Ogedengbe, F. A., & Nwoye, M. I. (2024) · European Journal of logistics Purchasing and Supply Chain Management · doi:10.37745/ejlpscm.2013/vol12n1119 · Cited by 5
Lv, L., Chen, C., Wang, S., & Zeng, Q. (2025) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2025.2493799 · Cited by 4
“Interactive fairness, characterized by candid and timely communication between parties can enhance feelings of social support, leading contractors to exhibit more positive behaviors (Liu, Zhao, and Yan 2016).”
Shen, W., Zhai, X., Wan, L., & Ren, X. (2025) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-16589 · Cited by 4
Guimarães, L. G. D. A., Blanchet, P., & Cimon, Y. (2024) · Buildings · doi:10.3390/buildings14082563 · Cited by 6
Kwon, T.-W., Lee, K.-T., Kim, J.-H., & Kim, J.-J. (2022) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12567 · Cited by 4
Liability of Foreignness in Public-Private Partnership Projects
Kong, Z., Ma, H., Lv, K., & Jonathan Jingsheng, S. H. I. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-13380 · Cited by 5
Akunyumu, S., Fugar, F. D. K., Adinyira, E., & Adade-Boateng, A. O. (2025) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-01-2025-0007 · Cited by 3
Akoh, S. R., Sun, M., Ogunlana, S. O., & Mahmud, A. T. (2024) · Journal of Facilities Management · doi:10.1108/jfm-05-2023-0052 · Cited by 3
Wang, P., Gao, L., Zhang, W., & Deng, X. (2025) · Engineering Construction & Architectural Management · doi:10.1108/ecam-04-2025-0679 · Cited by 3
An International Comparative Analysis of Barriers to BIM Adoption in the AEC Industry
Zhao, X. (2021) · Springer eBooks · doi:10.1007/978-981-15-8892-1_137 · Cited by 3
Self-citationImpacts of cultural risk factors on project success in the UAE construction industry
Hasani, M. A., Tularam, G. A., & Regan, M. (2017) · MODSIM · doi:10.36334/modsim.2017.a5.alhasani · Cited by 3
“Some of these papers still had significant deficiencies, such as insufficiently justified model fit (Kim et al., 2009; Liu et al., 2016), while the others did not consider cultural risk constructs (Doloi et al., 2012; Eybpoosh et al., 2011; Sambasivan et al., 2017).”
RISK MANAGEMENT ANALYSIS IN SPALD-T PROJECTS: A CASE STUDY IN DKI JAKARTA
Hasan, N. A., Hidayat, A., & Amin, M. (2025) · Jurnal PenSil · doi:10.21009/jpensil.v14i1.47879 · Cited by 2
“Meanwhile, the regression results for variable X3 (Waste Management Risk) demonstrate a significant and positive relationship with the dependent variable, with a regression coefficient of 0.188 and a p-value of 0.001 (Junying et al., 2016; Ullah et al., 2018; Zafar et al., 2019).”
InfluentialGupta, T., Kothari, C., & Misra, S. (2025) · Construction Management and Economics · doi:10.1080/01446193.2025.2456931 · Cited by 2
“…the utilisation of data gathered through questionnaires (Xu et al. 2010, among others; Mazher et al. 2018; Patel et al. 2020), case studies (Rebeiz 2012; Gao & Touran 2020; Yang et al. 2021, among others), inter-views (Creedy et al. 2010; Liu et al. 2016a, among others), or a combination of these.”
Mantha, B. R. K., Thomas, J. M., Dabous, S. A., & Liang, C. (2025) · Construction Innovation · doi:10.1108/ci-03-2025-0127 · Cited by 2
Pang, D., Srinavin, K., & Aksorn, P. (2026) · Transport Policy · doi:10.1016/j.tranpol.2026.104288 · Cited by 2
Shyam, R., & Tiwari, S. (2026) · Journal of The Institution of Engineers (India) Series A · doi:10.1007/s40030-026-00989-y · Cited by 2
“Conventional variance analysis and deterministic monitoring provide summaries but may not represent uncertainty and dynamic interactions among numerous project variables (J. [24, 25]).”
InfluentialA risk assessment model of commercial real estate development projects in developing countries
Çomu, S., Elibol, A. Y., & Yücel, B. (2021) · Journal of Construction Engineering Management & Innovation · doi:10.31462/jcemi.2021.01052067 · Cited by 2
Exploring the Case Study Usage in Construction Engineering and Management Research
Krantz, J., & Larsson, J. (2017) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784481080.005 · Cited by 2
Underlying Factors of Corruption in the Public Construction Sector
Shan, M., Le, Y., Chan, A. P. C., & Hu, Y. (2019) · Springer eBooks · doi:10.1007/978-981-13-9550-5_3 · Cited by 2
Effective risk management of transport facilities construction
Спиридонов, Э. С., Logvinenko, A., & Духов, А. (2020) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/945/1/012056 · Cited by 1
Kissi, E., Aigbavboa, C. O., Eluerkeh, K., Acheamfour, V. K., & Smith, E. D. (2024) · International Journal of Construction Education and Research · doi:10.1080/15578771.2024.2372717 · Cited by 3
“The PLS-SEM was conducted to ascertain the prospective theoretical hypothesis between green human resource management practices and environmental performances (Zhao et al., 2013; Liu et al., 2016).”
Deep, S., Gajendran, T., Jefferies, M. C., & Jha, K. N. (2025) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-15717 · Cited by 1
Zaray, A. H., Irshad, A. S., Amin, A. S., Ahmadullah, A. B., & Visal, E. M. (2025) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/jladah.ladr-1410 · Cited by 1
A Methodological Approach for Risk Assessment of Municipal Water Supply Projects
Gracia, M. D., Mar-Ortiz, J., Luna‐Domínguez, C. R., & Pérez, J. P. (2026) · Mathematics · doi:10.3390/math14050890 · Cited by 1
“Various approaches have been adopted to address project complexity and risks under uncertainty [12].”
Zhang, Y., Gan, W., Mohammed, T. A., Xiao, M., & Liu, J. (2026) · Journal of Global Trends in Social Science · doi:10.70731/c6wgxz82 · Cited by 1
“Their prior exposure to project shocks can strengthen both ex ante risk iden-ti�ication and ex post response routines (Iyer et al., 2019; Liu et al., 2016).”
Self-citationCollusive Practices in Public Construction Projects: A Case of China
Shan, M., Le, Y., Chan, A. P. C., & Hu, Y. (2019) · Springer eBooks · doi:10.1007/978-981-13-9550-5_7 · Cited by 1
KÜÇÜKERDEN, Ç., Gürcanlı, G. E., & Bilir, S. (2021) · Balıkesir Üniversitesi Fen Bilimleri Enstitüsü Dergisi · doi:10.25092/baunfbed.855072 · Cited by 1
“Riskler, 2016 [15] Sigorta teminatları/poliçeleri tarafından karşılanabilecek”
Addressing cost overruns through risk path modeling
Elbashbishy, T. S., Hosny, O. A., Waly, A. F., & Dorra, E. M. (2019) · Cited by 1
Parra, H. A., Zúñiga-Collazos, A., & Cruz-Caicedo, L. F. (2022) · Journal of Construction in Developing Countries · doi:10.21315/jcdc-07-21-0106 · Cited by 1
“For Liu, Zhao, and Yan (2016), resource price fluctuation increases the cost and for Chang et al. (2018), international environment factors like external conflicts and external interferences can destabilise the social safety of host countries and even economic depression.”
BackgroundRahnama, N., Noorzai, E., & Golabchi, M. (2023) · Facilities · doi:10.1108/f-02-2022-0019 · Cited by 1
Risk Management in Construction - Recent Advances
Tosun, H., Gürsakal, N., & Sebatli-Saglam, A. (2023) · Civil engineering. · doi:10.5772/intechopen.107735 · Cited by 1
Liu, J., Wang, Y., & Du, X. (2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2023-0030 · Cited by 3
Self-citationRisk and Vulnerability Assessment for International Contractors
Maddah, R., Tripathi, K. K., & Jha, K. N. (2025) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/jladah.ladr-1235 · Cited by 1
Zhao, X., Hwang, B.-G., & Low, S. P. (2016) · Acquire (CQUniversity)
Self-citationMeta-Network Modelling for International Construction Risk Management of Multiple Objectives
Ganbat, T., & Liao, P. (2019) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784482308.032
AL-Yafeai, A. H., Hassan, A., & Elhassan, E. E. (2019) · International Journal of Engineering Research and Advanced Technology · doi:10.31695/ijerat.2019.3584
Alzanati, A. (2021) · Bournemouth University Research Online (Bournemouth University)
Liu, M., Liao, P., & Huang, Y. (2022) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784483961.008
Gülöksüz, E. (2020) · MEGARON / Yıldız Technical University Faculty of Architecture E-Journal · doi:10.14744/megaron.2020.19794
Modelo de madurez de internacionalización de las empresas consultoras de ingeniería españolas
Lozano-Torró, A. (2022) · RiuNet (Universitat Politècnica de València) · doi:10.4995/thesis/10251/183870
Risk Management Practices in Sri Lanka
Oke, A. E., Adetoro, P. E., Stephen, S. S., Aigbavboa, C. O., Oyewobi, L. O., & Aghimien, D. O. (2023) · Springer eBooks · doi:10.1007/978-3-031-35557-8_7
Wu, S., Jiang, Y., & Su, Q. (2025) · Journal of Infrastructure Systems · doi:10.1061/jitse4.iseng-2585
Mandrah, B., & Mishra, M. R. (2025) · International Journal of Advanced Research in Science Communication and Technology · doi:10.48175/ijarsct-28294
Contract Risk Management for Cultural and Tourism Projects in EPC+O Mode
Yi, R., Du, Y., Xie, S., & Fang, Y. (2025) · Journal of Sustainable Built Environment · doi:10.70731/s91hg603
Metadata
- Authors
- Liu, J., Zhao, X., & Yan, P.
- Affiliations
- Tianjin University (CN)
- Central Queensland University (AU)
- Ph.D. Candidate, Dept. of Construction Management, College of Management and Economics, Tianjin Univ., 92 Weijin Rd., Tianjin 300072, China (corresponding author).
- Venue
- Journal of Construction Engineering and Management
- Published
- 2016-06
- Volume
- 142
- Issue
- 6
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2238965708
- Semantic Scholar
- c0731e4b929c2d8301d2da4f89a0f833101295be
- Cited by
- 203
- References
- 74
- Citations by year
- 2026: 7 · 2025: 20 · 2024: 17 · 2023: 28 · 2022: 18 · 2021: 21 · 2020: 23 · 2019: 24 · 2018: 20 · 2017: 20 · 2016: 5
- FWCI
- 25.20
- Type
- journal article
- Language
- en
- Open access
- green
- figshare.com
- Licence
- cc-by
- Locations
- Journal of Construction Engineering and Management (publishedVersion)
- Acquire (CQUniversity) (submittedVersion)
- Figshare (submittedVersion, cc-by)
- Funders
- National Science Foundation
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public-Private Partnership Projects
- Keywords
- international construction projects, Chinese contractors, contractor experience, management skills, project cost performance, project quality, project schedule, productivity, risk interrelationships
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.