Risk Paths in International Construction Projects: Case Study from Chinese Contractors
Open accessThe DOI matches its Crossref record; 76 of the 76 references it cites were found in a registry or an index.
Abstract
AbstractContracting in overseas construction markets involves not only the typical risks at home, but also the complex and diverse risks peculiar to international transactions. In addition, international construction project risks are highly interdependent. The objectives of this study are to (1) explore the risk paths in the international construction projects performed by Chinese contractors, and (2) examine the risk effects on the objectives of these projects. To achieve the research objectives, a total of 60 risks were identified from literature review and a questionnaire survey was conducted with 104 professionals from Chinese international contractors. Adopting the structural equation modeling technique, this study proposed a networking of 20 significant risk paths. Specifically, host government–related risk, contractor’s lack of experience, and contractors’ lack of managerial skills had significant effect on project cost, quality, and schedule objectives, respectively. Moreover, host government–rel...
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Ignoring the interdependence of risks can result in an ineffective reflection of the actual risk conditions associated with construction projects. It may provide less reliable risk assessment results for decision-making [4].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [4]
Citations
Cites
Evaluating Structural Equation Models with Unobservable Variables and Measurement Error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.2307/3151312 · Cited by 109,314 · cited 1×
“Social risk R20 Language barrier Zhi (1995), Hastak and Shaked (2000), and Han and Diekmann (2001b) R21 Differences in religious or culture tradition Zhi (1995), Han and Diekmann (2001a), Dikmen and Birgonul (2006), Dikmen et al.”
BackgroundEvaluating structural equation models with unobservable variables and measurement error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.1177/002224378101800104 · Cited by 109,190
Pls-Sem: indeed a silver bullet
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011) · Journal of Marketing Theory and Practice · doi:10.2753/mtp1069-6679190202 · Cited by 21,631
中華人民共和国国家統計局 (1988) · Medical Entomology and Zoology · Cited by 12,443
Bootstrap Methods and their Application
Davison, A. C., & Hinkley, D. V. (1997) · doi:10.1017/cbo9780511802843 · Cited by 7,350
Modern Methods for Business Research
(1998) · doi:10.4324/9781410604385 · Cited by 6,534
Better Bootstrap Confidence Intervals
Efron, B. (1987) · Journal of the American Statistical Association · doi:10.1080/01621459.1987.10478410 · Cited by 3,364
Megaprojects and Risk: An Anatomy of Ambition
Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9781107050891 · Cited by 2,415
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
How to factor-analyze your data right: do’s, don’ts, and how-to’s.
Matsunaga, M. (2010) · International Journal of Psychological Research · doi:10.21500/20112084.854 · Cited by 1,419 · cited 2×
“Country level Macroeconomic risk R01 Fluctuation in currency exchange rates Wang et al. (2004), Dikmen and Birgonul (2006), Dikmen et al.”
BackgroundMultivariate Data Analysis with Readings
Sparkman, R. M., Hair, J. F., Anderson, R. E., Tatham, R. L., & Grablowsky, B. J. (1979) · Journal of Marketing Research · doi:10.2307/3150726 · Cited by 1,277
Understanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859 · cited 1×
“RC has been seen as a function of LO and MI (Zou et al. 2007; Hwang et al. 2015b).”
Partial Least Squares: The Better Approach to Structural Equation Modeling?
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2012) · Long Range Planning · doi:10.1016/j.lrp.2012.09.011 · Cited by 855
Better Bootstrap Confidence Intervals
Efron, B. (1987) · Journal of the American Statistical Association · doi:10.2307/2289144 · Cited by 698
Analysis of factors influencing project cost estimating practice
Akintoye, A. (2000) · Construction Management and Economics · doi:10.1080/014461900370979 · Cited by 608 · cited 1×
“The response rate was 21%, which was acceptable compared with the norm of 20–30% with most questionnaire surveys in the construction industry (Akintoye 2000; Hwang et al. 2015a).”
BackgroundRisk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468 · cited 1×
“(2009) Project level Contract problems R29 Advantageous risk allocation to owner Dikmen and Birgonul (2006) and El-Sayegh (2008)”
BackgroundA fuzzy approach to construction project risk assessment
Nieto-Morote, A., & Ruz-Vila, F. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.002 · Cited by 464
Risk management framework for construction projects in developing countries
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004) · Construction Management and Economics · doi:10.1080/0144619032000124689 · Cited by 445 · cited 1×
“Because risk assessment is complex and vague, qualitative linguistic terms are unavoidable (Wang et al. 2004).”
BackgroundRisk management for overseas construction projects
Zhi, H. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00015-i · Cited by 407 · cited 1×
“Inadequate overseas environmental information and construction experience contribute to a higher risk exposure and possibility of losses in the international market than those in the domestic market (Zhi 1995; Zhao et al. 2014a).”
BackgroundUsing fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, I., Birgonul, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 374 · cited 3×
“(2013) R27 Unavailability of material Zhi (1995), Hastak and Shaked (2000), Dikmen et al. (2007), and Bu-Qammaz et al.”
BackgroundInfluentialTaxonomy for change causes and effects in construction projects
Sun, M., & Meng, X. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.005 · Cited by 331
ICRAM-1: Model for International Construction Risk Assessment
Hastak, M., & Shaked, A. (2000) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2000)16:1(59 · Cited by 285
Construction workers’ perceptions of health and safety training programmes
Wilkins, J. R. (2011) · Construction Management and Economics · doi:10.1080/01446193.2011.633538 · Cited by 283 · cited 1×
“The nonprobability sampling plan can be used to obtain a representative sample (Patton 2001), and has been recognized as appropriate when respondents are not randomly selected from the entire population, but are rather selected based on their willingness to participate in the study (Wilkins 2011).”
MethodCauses, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman
Alnuaimi, A. S., Taha, R. A., Al Mohsin, M., & Al-Harthi, A. S. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000154 · Cited by 233
Construction Project Cost Escalation Factors
Shane, J. S., Molenaar, K. R., Anderson, S., & Schexnayder, C. (2009) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2009)25:4(221 · Cited by 220
Eybpoosh, M., Dikmen, I., & Talat Birgonul, M. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000382 · Cited by 217
Approaches for Making Risk-Based Go/No-Go Decision for International Projects
Han, S. H., & Diekmann, J. E. (2001) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2001)127:4(300 · Cited by 203
Kuo, Y.-C., & Lu, S.-T. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.10.003 · Cited by 199
Factors That Affect Process Quality in the Life Cycle of Building Projects
Arditi, D., & Günaydın, H. M. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:3(194 · Cited by 178
Managerial perceptions of political risk in international projects
Khattab, A. A. A., Anchor, J. R., & Davies, E. M. M. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.006 · Cited by 166
Li, H. X., Al-Hussein, M., Lei, Z., & Ajweh, Z. (2013) · Canadian Journal of Civil Engineering · doi:10.1139/cjce-2013-0013 · Cited by 164
Critical success factors for enterprise risk management in Chinese construction companies
Zhao, X., Hwang, B., & Low, S. P. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.867521 · Cited by 164
Self-citationLe, Y., Shan, M., Chan, A. P. C., & Hu, Y. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000886 · Cited by 159
Reducing Hindrances to Enterprise Risk Management Implementation in Construction Firms
Zhao, X., Hwang, B., Low, S. P., & Wu, P. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000945 · Cited by 158
Self-citationXiong, B., Skitmore, M., Xia, B., Masrom, M. A. N., Ye, K., & Bridge, A. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.06.003 · Cited by 140
Investigating the client-related rework in building projects: The case of Singapore
Hwang, B., Zhao, X., & Goh, K. J. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.009 · Cited by 140
Self-citationAddressing Risks in Green Retrofit Projects: The Case of Singapore
Hwang, B., Zhao, X., See, Y. L., & Zhong, Y. (2015) · Project Management Journal · doi:10.1002/pmj.21512 · Cited by 134
Self-citationIntegrating system dynamics and fuzzy logic modelling for construction risk management
Nasirzadeh, F., Afshar, A., Khanzadi, M., & Howick, S. (2008) · Construction Management and Economics · doi:10.1080/01446190802459924 · Cited by 125
Deng, X., Low, S. P., Li, Q., & Zhao, X. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000836 · Cited by 123
Self-citationRisk assessment of international construction projects using the analytic network process
Bu-Qammaz, A. S., Dikmen, I., & Birgonul, M. T. (2009) · Canadian Journal of Civil Engineering · doi:10.1139/l09-061 · Cited by 120
Project relationships – A model for analyzing interactional uncertainty
Jensen, C., Johansson, S., & Löfström, M. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.06.004 · Cited by 116
Kim, D. Y., Han, S. H., Kim, H., & Park, H.-D. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.12.048 · Cited by 115
Dikmen, İ., & Birgönül, M. T. (2006) · Canadian Journal of Civil Engineering · doi:10.1139/l05-087 · Cited by 108
Subramanyan, H., Sawant, P. H., & Bhatt, V. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000435 · Cited by 106
Deng, X., Pheng, L. S., & Zhao, X. (2014) · Project Management Journal · doi:10.1002/pmj.21397 · Cited by 99
Self-citationPolitical, Economic, and Legal Risks Faced in International Projects: Case Study of Vietnam
Ling, F. Y. Y., & Hoang, V. T. P. (2009) · Journal of Professional Issues in Engineering Education and Practice · doi:10.1061/(asce)ei.1943-5541.0000015 · Cited by 92 · cited 1×
“Hence, risk management is critical for construction firms to survive and remain profitable in the international construction market (Shane et al. 2009; Ling and Hoang 2010).”
BackgroundHwang, B., Zhao, X., & Ong, S. Y. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000342 · Cited by 91
Self-citationModelling the risks faced by Indian construction companies assessing international projects
Jha, K. N., & Devaya, M. N. (2008) · Construction Management and Economics · doi:10.1080/01446190801953281 · Cited by 79
Causes of Bad Profit in Overseas Construction Projects
Han, S. H., Park, S. H., Kim, D. Y., Kim, H., & Kang, Y. W. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:12(932 · Cited by 75
Investigating Enterprise Risk Management Maturity in Construction Firms
Zhao, X., Hwang, B., & Low, S. P. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000873 · Cited by 74
Self-citationXiaopeng, D., & Pheng, L. S. (2013) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-013-0354-5 · Cited by 71
Making a risk-based bid decision for overseas construction projects
Han, S. H., & Diekmann, J. E. (2001) · Construction Management and Economics · doi:10.1080/01446190110072860 · Cited by 71
Safety Issues on Global Projects
Mahalingam, A., & Levitt, R. E. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:7(506 · Cited by 68
Discriminant Analysis for Predicting Ranges of Cost Variance in International Construction Projects
Kim, D. Y., Han, S. H., & Kim, H. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:6(398 · Cited by 64
Ning, Y. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.04.003 · Cited by 63
Hillson, D. (2024) · Routledge eBooks · doi:10.4324/9781003431954 · Cited by 61 · cited 1×
“2009), involves not just identifying individual risks, but also the interrelationships among these risks (Hillson 2009).”
BackgroundZhao, X., Hwang, B., & Phng, W. (2013) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-014-0045-x · Cited by 61
Self-citationEbrat, M., & Ghodsi, R. (2014) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-014-0139-5 · Cited by 58
Multicriteria Financial Portfolio Risk Management for International Projects
Han, S. H., Diekmann, J. E., Lee, Y., & Ock, J. H. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:3(346 · Cited by 58
Simister, S. (2009) · Cited by 55
Deng, X., & Low, S. P. (2013) · Journal of Professional Issues in Engineering Education and Practice · doi:10.1061/(asce)ei.1943-5541.0000174 · Cited by 50
Boosting Public Construction Project Outcomes through Relational Transactions
Ning, Y., & Ling, F. Y. Y. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000780 · Cited by 49 · cited 2×
“These ways to collect project performance data have been widely adopted in studies of a similar nature (Ling 2004; Ning and Ling 2013).”
BackgroundMethodExternal risk management practices of Chinese construction firms in Singapore
Low, S. P., Liu, J., & He, S. (2009) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-009-0085-9 · Cited by 44 · cited 1×
“Risk identification, a critical phase of project risk management (Low et al. 2009), involves not just identifying individual risks, but also the interrelationships among these risks (Hillson 2009).”
BackgroundSelf-citationArtificial neural network cost flow risk assessment model
Odeyinka, H. A., Lowe, J. G., & Kaka, A. P. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.802363 · Cited by 39
Key determinants of performance of design-bid-build projects in Singapore
Ling, F. Y. Y. (2004) · Building Research & Information · doi:10.1080/096132103200048497 · Cited by 37
Understanding Enterprise Risk Management Maturity in Construction Firms
Zhao, X., Hwang, B., & Low, S. P. (2015) · Springer eBooks · doi:10.1007/978-3-662-46994-1_74 · Cited by 36
Self-citationInternational Projects Proposal Analysis: Risk Assessment Using Radial Maps
Steffey, R. W., & Anantatmula, V. S. (2011) · Project Management Journal · doi:10.1002/pmj.20237 · Cited by 34 · cited 1×
“Social risk R20 Language barrier Zhi (1995), Hastak and Shaked (2000), and Han and Diekmann (2001b) R21 Differences in religious or culture tradition Zhi (1995), Han and Diekmann (2001a), Dikmen and Birgonul (2006), Dikmen et al.”
BackgroundLegal Risks Faced by Foreign Architectural, Engineering, and Construction Firms in China
Ling, F. Y. Y., & Low, S. P. (2007) · Journal of Professional Issues in Engineering Education and Practice · doi:10.1061/(asce)1052-3928(2007)133:3(238 · Cited by 31
Foreign firms' financial and economic risk in China
Ling, F. Y. Y., & Lim, H. L. (2007) · Engineering Construction & Architectural Management · doi:10.1108/09699980710760667 · Cited by 29
Influence of Trade-Level Coordination Problems on Project Productivity
Hwang, B., Zhao, X., & van Do, T. H. (2014) · Project Management Journal · doi:10.1002/pmj.21445 · Cited by 27
Self-citationRisk-integrated cash flow forecasting for overseas construction projects
Han, S. H., Park, H. K., Yeom, S. M., Chae, M. J., & Kim, D. Y. (2014) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-014-0464-8 · Cited by 21
Effects of collaboration in projects on construction project performance
Löfgren, P. (2009) · Diva portal (Dalarna University Library) · Cited by 19
Tracing risk paths in international construction projects: A case study
Dikmen, İ., Birgönül, M. T., & Eybpoosh, M. (2011) · Research Repository (Delft University of Technology) · Cited by 9
Low, S. P., Liu, J. Y., & He, S. (2008) · International Journal of Construction Management · doi:10.1080/15623599.2008.10773112 · Cited by 9
Self-citationAnalysis of the Top 250 International Contractors in 2014 ENR
Zhang, Y. (2014) · Journal of Engineering Management · Cited by 9
Construction Project Risk Assessment
Wang, Y. (2012) · Lecture notes in electrical engineering · doi:10.1007/978-1-4471-4600-1_72 · Cited by 3
Research works printed but not linked: 3
- Cendrowski H., 2009, Enterprise risk management and COSO: A guide for directors, executives, and practitioners
- Patton M. Q., 2001, Qualitative research & evaluation components
- Zou P. X. Zhang G. and Wang J.-Y. (2006). “Identifying key risks in construction projects: Life cycle and stakeholder perspectives.” Pacific Rim Real Estate Society Conf. Univ. of Auckland Business School Auckland New Zealand.
Cited by
Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.136 · Cited by 318
Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.008 · Cited by 294
“Using the same approach, Liu et al. (2016) explored risk paths in international construction projects performed by Chinese contractors and evaluated the impact of risks on project objectives.”
BackgroundZuo, J., Zhao, X., Nguyen, Q. B. M., Ma, T., & Gao, S. (2018) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-01-2016-0016 · Cited by 172
Self-citationRisk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia
Alshihri, S., Al-Gahtani, K. S., & Almohsen, A. S. (2022) · Buildings · doi:10.3390/buildings12070902 · Cited by 193
“Similar results may be identified in China [59], where client risks and contractor-related risks were identified to be the significant risks.”
ResultAhmadabadi, A. A., & Heravi, G. (2019) · Transport Policy · doi:10.1016/j.tranpol.2018.07.004 · Cited by 166
Metadata
- Authors
- Liu, J., Zhao, X., & Yan, P.
- Affiliations
- Tianjin University (CN)
- Central Queensland University (AU)
- Ph.D. Candidate, Dept. of Construction Management, College of Management and Economics, Tianjin Univ., 92 Weijin Rd., Tianjin 300072, China (corresponding author).
- Venue
- Journal of Construction Engineering and Management
- Published
- 2016-06
- Volume
- 142
- Issue
- 6
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2238965708
- Semantic Scholar
- c0731e4b929c2d8301d2da4f89a0f833101295be
- Cited by
- 203
- References
- 74
- Citations by year
- 2026: 7 · 2025: 20 · 2024: 17 · 2023: 28 · 2022: 18 · 2021: 21 · 2020: 23 · 2019: 24 · 2018: 20 · 2017: 20 · 2016: 5
- FWCI
- 25.20
- Type
- journal article
- Language
- en
- Open access
- green
- figshare.com
- Licence
- cc-by
- Locations
- Journal of Construction Engineering and Management (publishedVersion)
- Acquire (CQUniversity) (submittedVersion)
- Figshare (submittedVersion, cc-by)
- Funders
- National Science Foundation
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public-Private Partnership Projects
- Keywords
- international construction projects, Chinese contractors, contractor experience, management skills, project cost performance, project quality, project schedule, productivity, risk interrelationships
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.