Machine Learning Algorithms for Construction Projects Delay Risk Prediction
The DOI matches its Crossref record; 62 of the 62 references it cites were found in a registry or an index.
Abstract
Projects delays are among the most pressing challenges faced by the construction sector attributed to the sector’s complexity and its inherent delay risk sources’ interdependence. Machine learning offers an ideal set of techniques capable of tackling such complex systems; however, adopting such techniques within the construction sector remains at an early stage. The goal of this study was to identify and develop machine learning models in order to facilitate accurate project delay risk analysis and prediction using objective data sources. As such, relevant delay risk sources and factors were first identified, and a multivariate data set of previous projects’ time performance and delay-inducing risk sources was then compiled. Subsequently, the complexity and interdependence of the system was uncovered through an exploratory data analysis. Accordingly, two suitable machine learning models, utilizing decision tree and naïve Bayesian classification algorithms, were identified and trained using the data set for predicting project delay extents. Finally, the predictive performances of both models were evaluated through cross validation tests, and the models were further compared using machine-learning-relevant performance indices. The evaluation results indicated that the naïve Bayesian model provides a better predictive performance for the data set examined. Ultimately, the work presented herein harnesses the power of machine learning to facilitate evidence-based decision making, while inherent risk factors are active, interdependent, and dynamic, thus empowering proactive project risk management strategies.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Gondia et al. [22] proved that ML-based approaches are superior in predicting construction projects' delay risk over statistical learning.”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [22]
In the citing paper
“The present study considered a 10-fold CV because numerous studies have indicated that this is the optimal value for computational time, error estimation, and indices variance [22].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [22]
In the citing paper
“| Gondia et al. [22] | NB | Accuracy: 78.4% |”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [22]
In the citing paper
“For instance, in a Gondia et al. [22] study, the best ML model was the NB, which had a 51.2% accuracy rate.”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as Gondia et al. [22]
Citations
Cites
The Elements of Statistical Learning
Hastie, T., Tibshirani, R., & Friedman, J. (2009) · Springer Series in Statistics · doi:10.1007/978-0-387-84858-7 · Cited by 25,970
A Study of Cross-Validation and Bootstrap for Accuracy Estimation and Model Selection
Kohavi, R. (1995) · Zenodo · doi:10.5281/zenodo.19712698 · Cited by 10,909
Advances in Neural Information Processing Systems 14: Proceedings of the 2001 Conference
(2002) · The MIT Press eBooks · doi:10.7551/mitpress/1120.001.0001 · Cited by 8,890
Statistical Modeling: The Two Cultures (with comments and a rejoinder by the author)
Breiman, L. (2001) · Statistical Science · doi:10.1214/ss/1009213726 · Cited by 4,340
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
A survey of cross-validation procedures for model selection
Arlot, S., & Célisse, A. (2010) · LillOA (Université de Lille (University Of Lille)) · Cited by 3,662
A survey of cross-validation procedures for model selection
Arlot, S., & Celisse, A. (2010) · Statistics Surveys · doi:10.1214/09-ss054 · Cited by 3,522
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
Research works printed but not linked: 3
- Ismail I., 2014, Expert opinion on risk level for factors affecting time and cost overrun along the project lifecycle in Malaysian construction projects, Int. J. Constr. Technol. Manage., 1, 10
- Ng A. Y., 2002, Advances in neural information processing systems, 841
- R Core Team, 2013, A language and environment for statistical computing
Cited by
Items 101–200 of 374
Zheng, X. (2024) · Entertainment Computing · doi:10.1016/j.entcom.2024.100666 · Cited by 20
Evaluation of Classification for Project Features with Machine Learning Algorithms
Fan, C. (2022) · Symmetry · doi:10.3390/sym14020372 · Cited by 19
Jelodar, M. B., Raut, P. H., & Saghatforoush, E. (2021) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/(asce)la.1943-4170.0000449 · Cited by 21
Graph-Based Automated Construction Scheduling without the Use of BIM
Hong, Y., Xie, H. S., Agapaki, E., & Brilakis, I. K. (2022) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12687 · Cited by 22
Forecasting Project Duration in the Face of Disruptive Events: A Resource-Based Approach
Zarghami, S. A. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002257 · Cited by 18
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
Erzaij, K. R., Burhan, A. M., Hatem, W. A., & Ali, R. H. (2021) · Civil and Environmental Engineering · doi:10.2478/cee-2021-0066 · Cited by 18
“regression [9, 10], naïve Bayesian models [11, 12] and support vector machines [13-15].”
MethodHaghighi, M. H., & Ashrafi, M. (2023) · Annals of Operations Research · doi:10.1007/s10479-023-05653-3 · Cited by 17
Developing a Machine-Learning Model to Predict Clash Resolution Options
Harode, A., Thabet, W. Y., & Gao, X. (2024) · Journal of Computing in Civil Engineering · doi:10.1061/jccee5.cpeng-5548 · Cited by 17
Machine learning algorithms for safer construction sites: Critical review
Junjia, Y., Alias, A. H., Haron, N. A., & Bakar, N. A. (2024) · Building Engineering · doi:10.59400/be.v2i1.544 · Cited by 20
Alsulamy, S. H. (2025) · Applied Soft Computing · doi:10.1016/j.asoc.2025.112890 · Cited by 20
Measurement of Fuzzy Membership Functions in Construction Risk Assessment
Nguyen, L. D., & Tran, D. Q. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002015 · Cited by 17
Toward Integrated Human-Machine Intelligence for Civil Engineering: An Interdisciplinary Perspective
Zhang, C., Kim, J., Jeon, J., Xing, J., Ahn, C. R., Tang, P., & Cai, H. (2022) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784483893.035 · Cited by 17
A graph-based approach for unpacking construction sequence analysis to evaluate schedules
Hong, Y., Xie, H. S., Hovhannisyan, V., & Brilakis, I. K. (2022) · Advanced Engineering Informatics · doi:10.1016/j.aei.2022.101625 · Cited by 23
Gao, Y., González, V. A., Yiu, T. W., Cabrera‐Guerrero, G., & Deng, R. (2022) · Buildings · doi:10.3390/buildings12060841 · Cited by 16
Privacy-preserving culvert predictive models: A federated learning approach
Mohammadi, P., Rashidi, A., & Asgari, S. (2024) · Advanced Engineering Informatics · doi:10.1016/j.aei.2024.102483 · Cited by 16
Sodangi, M., & Salman, A. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2022.2106038 · Cited by 16
“Construction delays continue to be pervasive and difficult to manage efficiently despite the utilization of modern technology and engineering techniques in the management of construction projects (Gondia et al. 2020).”
BackgroundHsu, M., Dacre, N., & Senyo, P. K. (2021) · SSRN Electronic Journal · doi:10.2139/ssrn.3880328 · Cited by 16
Exploring the Critical Risk Factors of Public–Private Partnership City Hospital Projects in Turkey
Erdem, T. D., Birgönül, Z., Bilgin, G., & Akçay, E. C. (2024) · Buildings · doi:10.3390/buildings14020498 · Cited by 15
Salama, A. H. E.-S. (2024) · Asian Journal of Civil Engineering · doi:10.1007/s42107-024-01196-5 · Cited by 15
“The success of the GPR model in predicting delay impacts with high accuracy suggests it can be a powerful tool for construction project managers in forecasting potential delays and making informed decisions to mitigate their effects (Gondia et al., 2020).”
The C-BA method: enhancing megaproject forecasting through the “Fifth Hand” principle
Mariani, C., Cellerino, F., Aliaga, E. H. A., Atencio, E., & Mancini, M. (2025) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-11-2024-0281 · Cited by 17
Mali, A. S., Kolhe, A., Gorde, P. J., Kolekar, A. B., Umbrajkar, A., Solepatil, S. B., & Zare, K. (2025) · Asian Journal of Civil Engineering · doi:10.1007/s42107-025-01335-6 · Cited by 20
“The computational techniques, machine learning frameworks, and analytical tools to create predictive models that aid decision-making processes throughout a project's time duration and risk (Gondia et al., 2020).”
Improving the accuracy of schedule information communication between humans and data
Hong, Y., Xie, H. S., Bhumbra, G. S., & Brilakis, I. K. (2022) · Advanced Engineering Informatics · doi:10.1016/j.aei.2022.101645 · Cited by 18
Artificial intelligence feasibility in construction industry
Rampini, L., Khodabakhshian, A., & Cecconi, F. R. (2022) · Computing in construction · doi:10.35490/ec3.2022.189 · Cited by 15
Martínez, A., Jin, F., & Miller, S. A. (2025) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2025.108567 · Cited by 22
Asghari, V., Kazemi, M. H., Shahrokhishahraki, M., Tang, P., Alvanchi, A., & Hsu, S. (2023) · Advanced Engineering Informatics · doi:10.1016/j.aei.2023.102215 · Cited by 14
Transforming Project Management with AI: Opportunities and Challenges
Yadav, R. (2024) · Open Journal of Business and Management · doi:10.4236/ojbm.2024.126189 · Cited by 16
Forecasting delay-time model for Saudi construction projects using DEMATEL–SD technique
Al-Gahtani, K. S., Alsugair, A. M., Alsanabani, N. M., Alabduljabbar, A. A., & Almutairi, B. O. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2022.2152944 · Cited by 14
Nwadigo, O., Naismith, N., GhaffarianHoseini, A., Hoseini, A. G., & Tookey, J. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2020-0371 · Cited by 14
Cho, M., Park, M. S., Park, J., Park, S.-K., Cha, G., & Park, S. (2025) · Automation in Construction · doi:10.1016/j.autcon.2025.106588 · Cited by 16
Using a Machine Learning Approach to Predict the Thailand Underground Train’s Passenger
Kusonkhum, W., Srinavin, K., Leungbootnak, N., & Chaitongrat, T. (2022) · Journal of Advanced Transportation · doi:10.1155/2022/8789067 · Cited by 18
Knowledge synthesis of intelligent decision techniques applications in the AECO industry
Liao, L., Quan, L., Yang, C., & Li, L. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104304 · Cited by 14
Xie, H. S., Hong, Y., Xin, M., Brilakis, I. K., & Shi, O. (2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2022-0669 · Cited by 18
Kazar, G. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-06-2024-0706 · Cited by 16
Bekdaş, G., Aydın, Y., Nigdeli, S. M., Ünver, İ. S., Kim, W.-W., & Geem, Z. W. (2025) · Buildings · doi:10.3390/buildings15020288 · Cited by 14
“Some of them involve the prediction of flexible pavement structural capacity [18], predicting the risk of delay in construction projects [19], prediction of the compressive strength of geopoly-mer concrete [20], prediction of axial compression capacity of concrete-filled steel tubular columns [21],…”
Machine learning and optimization strategies for infrastructure projects risk management
Moussa, A., Ezzeldin, M., & El-Dakhakhni, W. W. (2025) · Construction Management and Economics · doi:10.1080/01446193.2025.2479764 · Cited by 14
“Hyperparameter tuning is a crucial step in training ML algorithms (Gondia et al. 2020).”
Self-citationFan, C. (2025) · Automation in Construction · doi:10.1016/j.autcon.2025.106470 · Cited by 15
Big data analytics in the AEC industry: scientometric review and synthesis of research activities
Ohene, E., Nani, G., Antwi‐Afari, M. F., Darko, A., Addai, L. A., & Horvey, E. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2024-0144 · Cited by 16
Cost Control Management of Construction Projects Based on Fuzzy Logic and Auction Theory
Zhao, Z., & Gao, Y. L. (2024) · IEEE Access · doi:10.1109/access.2024.3438291 · Cited by 12
“Gondia et al. [18] aimed to develop machine learning models for accurate analysis and prediction of project delay risk using objective data sources.”
BackgroundAssessing cyber risks in construction projects: A machine learning-centric approach
Yao, D., & de Soto, B. G. (2024) · Developments in the Built Environment · doi:10.1016/j.dibe.2024.100570 · Cited by 11
Alrasheed, K. A. (2025) · Discover Civil Engineering · doi:10.1007/s44290-025-00316-7 · Cited by 14
Mohammed, A., Busaeedi, N. A., Mohamed, A. A., & Saud, S. (2022) · Abu Dhabi International Petroleum Exhibition & Conference (ADIPEC) · doi:10.2118/210877-ms · Cited by 11
The State of Art in Machine Learning Applications in Civil Engineering
Aydın, Y., Bekdaş, G., Işıkdağ, Ü., & Nigdeli, S. M. (2023) · Studies in systems, decision and control · doi:10.1007/978-3-031-34728-3_9 · Cited by 11
Gogate, N. G., Shelake, A. G., & Band, P. (2023) · International Journal of Construction Management · doi:10.1080/15623599.2023.2267852 · Cited by 15
An Artificial Neural Network Approach for Construction Project Risk Management
Aggabou, L. K., Lakehal, B., & Mouda, M. (2024) · International Journal of Safety and Security Engineering · doi:10.18280/ijsse.140222 · Cited by 11
“For example, Gondia et al. [18] and Farag et al. [19] demonstrated the application of decision trees, Naïve Bayes classifiers, and genetic algorithm-based clustering in identifying and analyzing construction risks.”
MethodAI-driven safety checks for ladders used on construction sites
Hire, S., Ranjan, A., Ruikar, K. D., & Sandbhor, S. (2022) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1101/9/092040 · Cited by 11
Integration of Emerging Technologies with Construction Practices in Australia
Chaaya, M. L., Sarkis, L. M., & Tahmasebinia, F. (2025) · Buildings · doi:10.3390/buildings15030396 · Cited by 11
Risk-Aware Machine Learning: Embedding Ethical Constraints into Predictive Models
Tiamiyu, O. R. (2023) · Journal of Frontiers in Multidisciplinary Research · doi:10.54660/.jfmr.2023.4.2.338-348 · Cited by 12
Saurav, K. R. H. (2026) · doi:10.63125/z6c3b737 · Cited by 10
Machine Learning Application in Construction Delay and Cost Overrun Risks Assessment
Khodabakhshian, A., Malsagov, U., & Cecconi, F. R. (2024) · Lecture notes in networks and systems · doi:10.1007/978-3-031-54053-0_17 · Cited by 15
Ghorbani, S., & Khanachah, S. N. (2020) · Annals of Management and Organization Research · doi:10.35912/amor.v1i4.553 · Cited by 10
Sing, M. C. P., Ma, Q., & Gu, Q. (2025) · Applied Sciences · doi:10.3390/app15073519 · Cited by 10
Long, N. L. M., & Luu, V. T. (2025) · International Journal of Construction Management · doi:10.1080/15623599.2025.2485166 · Cited by 10
“Regular progress meetings and performance evaluations facilitate continuous improvement (Gondia et al. 2020; Gunduz and Al-Naimi 2022; Deep et al. 2023).”
SMART DELAY PREDICTION: SUPERVISED MACHINE LEARNING SOLUTIONS FOR CONSTRUCTION PROJECTS
Sahu, P., Bera, D. K., Parhi, P. K., & Kandpal, M. (2025) · JOURNAL OF MECHANICS OF CONTINUA AND MATHEMATICAL SCIENCES · doi:10.26782/jmcms.2025.06.00010 · Cited by 12
Guo, Q., Su, S., Gan, V. J. L., Liu, C., Feng, J., & Ding, W. (2025) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2025.108109 · Cited by 9
Ensafi, M., Alimoradi, S., Gao, X., & Thabet, W. Y. (2022) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784483961.013 · Cited by 9
Disrupting Buildings: Digitalisation and the Transformation of Deep Renovation
Lynn, T., Rosati, P., Kassem, M., Krinidis, S., & Kennedy, J. (2023) · Palgrave studies in digital business & enabling technologies · doi:10.1007/978-3-031-32309-6 · Cited by 12
Mejía, G., Gutiérrez-Prada, J. A., Portilla-Carreño, O., & Soto-Paz, J. (2024) · ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering · doi:10.1061/ajrua6.rueng-1363 · Cited by 12
Evaluation of Factors Leading to Time Delays and Cost Overruns in Marine Construction Projects
Nassar, A., & Elbisy, A. M. (2024) · Engineering Technology & Applied Science Research · doi:10.48084/etasr.8116 · Cited by 10
Self-citationZhao, R., Yang, Z., Liang, D., & Xue, F. (2024) · Lecture notes in operations research · doi:10.1007/978-981-97-1949-5_140 · Cited by 9
Planning of construction projects taking into account the design risk
Kostrzewa-Demczuk, P., & Rogalska, M. (2023) · Archives of Civil Engineering · doi:10.24425/ace.2023.144191 · Cited by 9
“The use of statistical methods and Monte Carlo simulations enables such designing of construction projects that take into account their risk and uncertainty in its approach, and will also generate information about possible delays [6,32].”
BackgroundMethodZohourian, M., Pamidimukkala, A., & Kermanshachi, S. (2025) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/jladah.ladr-1397 · Cited by 10
MSCA based Deep Recurrent Neural Network for Statistics Risk Management in Construction Projects
(2021) · Acta Montanistica Slovaca · doi:10.46544/ams.v26i3.08 · Cited by 8
“The performance of the various classifiers such as ANN (Alias et al., 2015), RF-GA (Yaseen et al., 2020; Gondia et al., 2020) is compared with the proposed DRNN-MSCA approach is shown in Fig 6.”
MethodRisk-based completion cost prediction approach in construction projects utilizing machine learning
Turkyilmaz, A. H., & Polat, G. (2025) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2025.016 · Cited by 8
The value of data from construction project site meeting minutes in predicting project duration
Niekerk, J. V., Wium, J. A., & de Koker, N. (2022) · Built Environment Project and Asset Management · doi:10.1108/bepam-03-2021-0047 · Cited by 8
Predicting Percent Plan Complete through Time Series Analysis
Nguyen, T. Q., Yeoh, J. K. W., & Angelia, N. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12867 · Cited by 8
Leśniak, A. (2023) · Civil And Environmental Engineering Reports · doi:10.59440/ceer-2023-0007 · Cited by 9
“In [11], the authors developed two machine learning models in order to facilitate accurate project delay risk analysis and prediction.”
BackgroundData analytics for project delivery: unlocking the potential of an emerging field
Shen, Y., Brookes, N. J., Flores, L. L., & Brettschneider, J. A. (2024) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-08-2023-0180 · Cited by 14
Resilient Project Scheduling Using Artificial Intelligence: A Conceptual Framework
Dahmani, S., Ben-Ammar, O., & Jebali, A. (2021) · IFIP advances in information and communication technology · doi:10.1007/978-3-030-85874-2_33 · Cited by 8
Rahman, M. A., & Zhu, R. (2025) · Sustainable Cities and Society · doi:10.1016/j.scs.2025.106446 · Cited by 8
Huang, P. (2023) · Soft Computing · doi:10.1007/s00500-023-08309-3 · Cited by 7
“The framework uses machine learning techniques to learn performance data that represents performance big data (Bkassiny et al. 2012, Sangaiah et al. 2019).”
RetractedHalder, A., & Batra, S. (2023) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-023-09938-5 · Cited by 7
Abed, H. R., & Rashid, H. A. (2023) · Journal of Engineering · doi:10.31026/j.eng.2023.12.06 · Cited by 7
Lagos, C. I., Herrera, R. F., Cawley, A. M., & Alarcón, L. F. (2025) · Engineering Construction & Architectural Management · doi:10.1108/ecam-03-2025-0424 · Cited by 6
Sadikoglu, E., & Demirkesen, S. (2026) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2026.2641274 · Cited by 6
Improving Construction Project Schedules before Execution
Fitzsimmons, J., Hong, Y., & Brilakis, I. (2020) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2020/0157 · Cited by 6
“The proposed FM method integrates Bayesian Networks to estimate the conditional probability of activity delay given its predecessor and Support Vector Machines to estimate the time delay.”
MethodInfluentialStudy of the Sustainable Functioning of Construction Companies in the Conditions of Risk Factors
Lapidus, A. A., Abramov, I., Kuzmina, Т., Abramova, A., & AlZaidi, Z. A. K. (2023) · Buildings · doi:10.3390/buildings13092282 · Cited by 7
Analyzing Coating Conditions of Steel Bridges at Florida: A Data-Driven Approach
Rahman, M. A., Zhang, L., Lv, X., & Lau, K. (2023) · Journal of Performance of Constructed Facilities · doi:10.1061/jpcfev.cfeng-4111 · Cited by 6
Andrić, J. M., Lin, S., Cheng, Y., & Sun, B. (2025) · KSCE Journal of Civil Engineering · doi:10.1016/j.kscej.2025.100209 · Cited by 5
A machine learning approach for forecasting resilient material delivery in the construction industry
Zhang, W., Yu, C., Newman, S. T., Kin, D. C. H., & Zhong, R. Y. (2025) · International Journal of Production Research · doi:10.1080/00207543.2025.2482733 · Cited by 8
“Common influencing factors result in delays, including weather, shortage of equipment, inadequate quality or quantity of materials, and delays in public utility services (Gondia et al. 2020).”
A Review of Benefits Using Artificial Intelligence in Construction
Zohourian, M., Pamidimukkala, A., & Kermanshachi, S. (2025) · ASCE International Conference on Transportation and Development (ICTD) · doi:10.1061/9780784486191.032 · Cited by 7
Risk prediction for mega construction prediction: a concise review
Qadri, F. H., Sharif, M., & Muddassir, S. M. (2025) · Sustainable and Resilient Infrastructure · doi:10.1080/23789689.2025.2526227 · Cited by 6
“In light of the examination of past undertakings, project supervisors can figure out which conveyance technique has been best in comparable ventures and select the one that is generally appropriate for their ongoing task (Gondia et al., 2020; Van & Quoc, 2021).”
Towards zero harm discourse: denaturing the safety performance plateau in underground mining
Dzawanda, B., Mavugara, R., & Nyathi, T. (2024) · Safety in Extreme Environments · doi:10.1007/s42797-024-00111-0 · Cited by 5
Junjia, Y., Alias, A. H., Haron, N. A., & Bakar, N. A. (2024) · Artificial Intelligence Evolution · doi:10.37256/aie.6120255255 · Cited by 7
Amarkhil, Q., Elwakil, E., & Hubbard, B. (2021) · IEEE Conference on Technologies for Sustainability · doi:10.1109/sustech51236.2021.9467448 · Cited by 5
Afkhamiaghda, M., & Elwakil, E. (2021) · IEEE Conference on Technologies for Sustainability · doi:10.1109/sustech51236.2021.9467421 · Cited by 5
Sanyal, A. P., & Bhattacharya, S. P. (2023) · International Journal of Construction Management · doi:10.1080/15623599.2023.2211461 · Cited by 5
“For determining accurate project durations, construction firms regularly use standard quantitative delay risk analysis tools, like Monte Carlo analysis (Gondia et al. 2020).”
MethodSmart Infrastructure and Development in Stealth Construction
Stephen, S. S., Oke, A. E., Aigbavboa, C. O., Akinradewo, O. I., Adetoro, P. E., & Ikuabe, M. O. (2025) · Emerald Group Publishing Limited eBooks · doi:10.1108/978-1-83608-182-120251007 · Cited by 5
Hosny, F., El-Damaty, M., Mantha, B. R. K., & Dabous, S. A. (2025) · International Journal of Building Pathology and Adaptation · doi:10.1108/ijbpa-05-2024-0096 · Cited by 4
Machine learning-based dynamic model for on-site subcontractor performance management
Başaran, Y., Aladağ, H., & Işık, Z. (2025) · Engineering Construction & Architectural Management · doi:10.1108/ecam-11-2024-1563 · Cited by 3
Research on Corporate Financial Anomaly Detection and Early Warning System Based on SVM ‐ LightBGM
Wang, Y. (2025) · Security and Privacy · doi:10.1002/spy2.70107 · Cited by 4
“In other words, it enables the transformation of a linear algorithm into a nonlinear one through inner product operations [16].”
Sadeghi, S., Niu, C., Marjani, T., & Lotfi, R. (2026) · Built Environment Project and Asset Management · doi:10.1108/bepam-11-2024-0264 · Cited by 8
Sahu, P., Bera, D. K., Parhi, P. K., Kandpal, M., & Thakur, R. R. (2026) · International Journal of Construction Management · doi:10.1080/15623599.2026.2619678 · Cited by 7
“Using construction delay factors and deep learning (DL) fueled with historical data, they assist the analyst to understand the pattern of delays and develop forecasting factors for construction project (Gondia et al. 2020; Guo et al. 2020).”
Jimenez, H. A. F., Cabrera, A. G., Sánchez, O., Gómez, C., & Arrieta, N. (2026) · Case Studies on Transport Policy · doi:10.1016/j.cstp.2026.101748 · Cited by 4
Sholeh, M. N., Hatmoko, J. U. D., & Widoanindyawati, V. (2026) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-026-10583-x · Cited by 7
Delay Analysis of Residential Construction by Using Augmented Reality and Virtual Reality
Sikarwar, R. S., & Shelake, A. G. (2023) · Lecture notes in civil engineering · doi:10.1007/978-981-99-2552-0_4 · Cited by 4
Pireddu, A., Bedini, A., Lombardi, M., Ciribini, A. L. C., & Berardi, D. (2024) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph21070831 · Cited by 4
“Appendix E”
Lin, S.-S., Zheng, X., & Deveci, M. (2025) · Journal of Industrial Information Integration · doi:10.1016/j.jii.2025.100849 · Cited by 4
Research on Risk Factors of Construction Project Delays Based on System Dynamics
Zhao, L., Qin, X., & Chen, C. (2025) · Procedia Computer Science · doi:10.1016/j.procs.2025.08.044 · Cited by 4
Enhancing Forensic Analysis of Construction Project Delays Through Digital Interventions
Boyacioglu, S. E., Greenwood, D., Rogage, K., & Parry, A. (2025) · Buildings · doi:10.3390/buildings15142391 · Cited by 4
Metadata
- Authors
- Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H.
- Affiliations
- McMaster University (CA)
- German University in Cairo (EG)
- Corresponding author
- Gondia, Ahmed
- Venue
- Journal of Construction Engineering and Management
- Published
- 2020-01
- Volume
- 146
- Issue
- 1
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2982358567
- Semantic Scholar
- f377710bec5c1ae3454e26eb951728250b2d2cb2
- Cited by
- 327
- References
- 61
- Citations by year
- 2026: 52 · 2025: 72 · 2024: 58 · 2023: 50 · 2022: 54 · 2021: 28 · 2020: 13
- FWCI
- 16.94
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Journal of Construction Engineering and Management (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Keywords
- construction delays, decision tree, naive Bayesian classification, project time performance, project risk management
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.