Machine Learning Algorithms for Construction Projects Delay Risk Prediction
The DOI matches its Crossref record; 62 of the 62 references it cites were found in a registry or an index.
Abstract
Projects delays are among the most pressing challenges faced by the construction sector attributed to the sector’s complexity and its inherent delay risk sources’ interdependence. Machine learning offers an ideal set of techniques capable of tackling such complex systems; however, adopting such techniques within the construction sector remains at an early stage. The goal of this study was to identify and develop machine learning models in order to facilitate accurate project delay risk analysis and prediction using objective data sources. As such, relevant delay risk sources and factors were first identified, and a multivariate data set of previous projects’ time performance and delay-inducing risk sources was then compiled. Subsequently, the complexity and interdependence of the system was uncovered through an exploratory data analysis. Accordingly, two suitable machine learning models, utilizing decision tree and naïve Bayesian classification algorithms, were identified and trained using the data set for predicting project delay extents. Finally, the predictive performances of both models were evaluated through cross validation tests, and the models were further compared using machine-learning-relevant performance indices. The evaluation results indicated that the naïve Bayesian model provides a better predictive performance for the data set examined. Ultimately, the work presented herein harnesses the power of machine learning to facilitate evidence-based decision making, while inherent risk factors are active, interdependent, and dynamic, thus empowering proactive project risk management strategies.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Gondia et al. [22] proved that ML-based approaches are superior in predicting construction projects' delay risk over statistical learning.”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [22]
In the citing paper
“The present study considered a 10-fold CV because numerous studies have indicated that this is the optimal value for computational time, error estimation, and indices variance [22].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [22]
In the citing paper
“| Gondia et al. [22] | NB | Accuracy: 78.4% |”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [22]
In the citing paper
“For instance, in a Gondia et al. [22] study, the best ML model was the NB, which had a 51.2% accuracy rate.”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as Gondia et al. [22]
Citations
Cites
The Elements of Statistical Learning
Hastie, T., Tibshirani, R., & Friedman, J. (2009) · Springer Series in Statistics · doi:10.1007/978-0-387-84858-7 · Cited by 25,970
A Study of Cross-Validation and Bootstrap for Accuracy Estimation and Model Selection
Kohavi, R. (1995) · Zenodo · doi:10.5281/zenodo.19712698 · Cited by 10,909
Advances in Neural Information Processing Systems 14: Proceedings of the 2001 Conference
(2002) · The MIT Press eBooks · doi:10.7551/mitpress/1120.001.0001 · Cited by 8,890
Statistical Modeling: The Two Cultures (with comments and a rejoinder by the author)
Breiman, L. (2001) · Statistical Science · doi:10.1214/ss/1009213726 · Cited by 4,340
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
A survey of cross-validation procedures for model selection
Arlot, S., & Célisse, A. (2010) · LillOA (Université de Lille (University Of Lille)) · Cited by 3,664
A survey of cross-validation procedures for model selection
Arlot, S., & Celisse, A. (2010) · Statistics Surveys · doi:10.1214/09-ss054 · Cited by 3,522
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
Research works printed but not linked: 3
- Ismail I., 2014, Expert opinion on risk level for factors affecting time and cost overrun along the project lifecycle in Malaysian construction projects, Int. J. Constr. Technol. Manage., 1, 10
- Ng A. Y., 2002, Advances in neural information processing systems, 841
- R Core Team, 2013, A language and environment for statistical computing
Cited by
Items 301–374 of 374
Exploring Highway Construction Delay Factors in Malaysia: A Quantitative Analysis
Shah, S. S., Monil, M., & Osman, Z. (2025) · Advances in economics, business and management research/Advances in Economics, Business and Management Research · doi:10.2991/978-94-6463-801-1_16
Optimizing Construction Project Scheduling and Resource Allocation Using Machine Learning Techniques
Singh, A. (2025) · International Journal for Research in Applied Science and Engineering Technology · doi:10.22214/ijraset.2025.73529
Work-in-Progress: Advancing Construction Management Education with Core Data Analytics Skills
Fathi, M., Cercone, C., Volovski, M., Quayyum, S., Omidvar, M., & Lee, J. (2025) · ASEE Annual Conference & Exposition · doi:10.18260/1-2--57519
IIT (BHU) Varanasi, V., & Sanyal, A. P. (2024) · International Conference on Construction Project Management and Construction Engineering (iCCPMCE) · doi:10.71427/iccpmce2024/60
Wang, C., & Li, X. (2025) · Journal of Computational Methods in Sciences and Engineering · doi:10.1177/14727978251374337
Risk Factors Affecting the Cost Performance of International Construction Projects
Maddah, R., Tripathi, K. K., & Jha, K. N. (2025) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/jladah.ladr-1228
Enhancing labour productivity in the Sri Lankan construction industry through computer vision
EkanayakaK, E. M. K. K., & Eranga, B. A. I. (2025) · World Construction Symposium (WCS) · doi:10.31705/wcs.2025.48
Al-Obaidi, S. E. S., & Al-Tuwaijari, J. M. (2025) · Academic Science Journal · doi:10.24237/asj.03.03.872b
Grims, M., Karas, D., Ivanova, M., Höfinger, G., Bruchhaus, S., Bornschlegl, M. X., & Hemmje, M. (2025) · Applied System Innovation · doi:10.3390/asi8060161 · Cited by 1
Prediction Model for Delay Risks in Construction Project Based on Artificial Intelligence
Aldaiyat, R. M. R. E., Alheeti, K. M. A., & Dosary, D. A. (2025) · Advances in Science, Technology & Innovation/Advances in science, technology & innovation · doi:10.1007/978-3-031-92135-3_11
Improving Lean Construction by Integrating ML for Contractor Performance Prediction
Fonseca, P., Chuprov, S., Solís, J. P., & Marquez, G. (2025) · Conference of Open Innovations Association (FRUCT) · doi:10.23919/fruct67853.2025.11239221
“Researchers have developed frameworks to anticipate project delays by analyzing historical data, reflecting Lean’s emphasis on data-driven decisions [12], [13].”
Mohammadi, P., Asgari, S., & Rashidi, A. (2025) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784486139.024
Liu, R., Yu, G., Shi, K., Chen, Y., & Ren, Q. (2025) · Water · doi:10.3390/w17243583
“With the development of computer technology, many scholars use artificial intelligence technology to analyze monitoring data and achieve auxiliary management of projects [9].”
Uporaba metod strojnega učenja za izboljšanje procesa vodenja nalog pri projektnih dejavnostih
Unuchak, T. (2024) · University of Maribor digital library (University of Maribor)
Dicks, E. P. (2023) · CU Scholar (University of Colorado Boulder)
Community and Infrastructure Resilience Prediction and Management in a Changing Climate
Abdel-Mooty, M. N. (2023) · MacSphere (McMaster University) · doi:10.71548/24456 · Cited by 1
ABDELMOTTALEB, M., Munir, M., & Underwood, J. (2026) · SSRN Electronic Journal · doi:10.2139/ssrn.6105492
Solving a robust real-life multi-skill resource-constrained multi-projects cheduling problemPreprint
Torba, R., Dauzère‐Pérès, S., Yugma, C., Gallais, C., & Pouzet, J. (2026) · SSRN Electronic Journal · doi:10.2139/ssrn.6104648
The Role of Machine Learning in Predicting Project Delays
Dayalan, D. (2025) · International Journal of AI BigData Computational and Management Studies · doi:10.63282/3050-9416.ijaibdcms-v6i4p130
Improving decision-making in construction: Nonparametric modeling of weather-induced impacts
Comito, M. B., Izbicki, R., Hubert, P. D. C., & Moura, F. (2026) · Communications in Statistics Case Studies Data Analysis and Applications · doi:10.1080/23737484.2026.2641190
Wu, L., & Huang, X. (2026) · Internet Technology Letters · doi:10.1002/itl2.70261
Saihi, A. (2026) · International journal of information systems and project management · doi:10.12821/ijispm140204 · Cited by 3
Kadu, A. V., & Reddy, K. T. V. (2026) · Journal of Computer Science · doi:10.3844/jcssp.2026.1045.1059
Asriwinarti, N. K. (2025) · International Conference on Data Science and Geoinformatics (ICDSG) · doi:10.1109/icdsg67714.2025.11381318
“Consequently, data driven and artificial intelligence (AI)- based methods have gained significant attention for their ability to model risks and forecast potential delays with higher accuracy [8].”
Construction Schedules: Predicting Weather-Induced Delays with Support Vector Machines
Nguyen, T. A., & Nguyen, H. H. (2026) · Studies in big data · doi:10.1007/978-3-032-08765-2_2
Ammari, A. S., Nouri, Y., Narmashiri, K., Rajabi, E., Rayegani, A., & Dourhi, K. (2026) · Case Studies in Construction Materials · doi:10.1016/j.cscm.2026.e06103
Annapurna, S., Sridhar, S., Pallavi, P., Chander, T. B., & Niharika, S. (2026) · International Conference on Machine Learning and Autonomous Systems (ICMLAS) · doi:10.1109/icmlas67792.2026.11483637
“Gondia et al. [15] trained random forest and gradient boosting classifiers on leading safety indicators from North American site inspections, demonstrating that proactive risk signals significantly outperform lagging metrics for accident prediction.”
AI-Driven Financial Project Management
Singh, A. K., & Chopra, P. S. (2026) · Advances in computational intelligence and robotics book series · doi:10.4018/979-8-2600-1756-2.ch002
Tserng, H. P., Chiu, T.-C., & Guo, S.-J. (2026) · Journal of the Chinese Institute of Engineers · doi:10.1080/02533839.2026.2659781
“Many commonly used duration prediction methods were developed for land-based projects and rely on empirical rules, regression analysis, or conceptual estimates (El-Dash, Ramadan, and Youssef 2019; Gondia et al. 2020; Mohamed and Moselhi 2022).”
A Warm-Started CP-SAT Framework for Resource-Constrained Project Scheduling
Mohamed Riyaz, A., & Kanaga, E. G. M. (2026) · International Conference on Inventive Computation Technologies (ICICT) · doi:10.1109/icict68280.2026.11510907
“In the recent past, there have been studies on applying ML for delay prediction in construction projects [2], [3], applying RL for construction project scheduling [1], [8], [9], as well as GNNs for capturing task dependency structure in construction projects [5]–[7].”
InfluentialData-Driven Risk Management Approach in Design Management Projects
Lagda, A. L. M., & Intal, G. L. (2026) · Contributions to management science · doi:10.1007/978-981-95-7060-7_3
Tazhibayev, A. (2026) · Universum Technical sciences · doi:10.32743/unitech.2026.145.4.22597
“…of Kazakhstan and the 2024 annual report of NC KazMunayGas JSC [15, 16, 24]; technical documentation of the KPJV consortium (Wor-leyParsons, Fluor, KING, KGNT) for the FGP project [17]; as well as academic publications on predictive analytics in construction from Emerald, MDPI, and ASCE [19].”
Kamil, A. I. M., Fathi, M. S., Musa, R., & Aziz, Z. (2026) · AIP conference proceedings · doi:10.1063/5.0327727
Kusonkhum, W., Srinavin, K., Kuntiyawichai, K., Chaitongrat, T., & Prapaporn, W. (2026) · Transportation Research Interdisciplinary Perspectives · doi:10.1016/j.trip.2026.102079
Cui, Z., Xu, S., Gao, J., Geng, L., & Zhou, Y. (2026) · Buildings · doi:10.3390/buildings16112264
Application of Artificial Intelligence in Construction Contract Management: A Systematic Review
Uddin, M. S., Datta, S. D., Abdelaty, A., & Babar, M. (2026) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/jladah.ladr-1536
Development of a Machine Learning Model for Assessing Risks of Delay in IT Project Management
Agamirov, L. V., Agamirov, V. L., Vlasnev, I. S., Sampilov, A. M., & Toutova, N. V. (2026) · Wave Electronics and its Application in Information and Telecommunication Systems (WECONF) · doi:10.1109/weconf69969.2026.11553730
“In other industries, such as construction [3– 6] or logistics, open datasets on delays exist, which have enabled the development of predictive models; however, similar studies for IT projects are rare.”
LLMs as Research Instruments for Problems in Engineering Management: A Context Modeling Framework
Qin, R., Mansouri, A., Zhen, D., Erfani, A., & Cui, Q. (2026) · Journal of Management in Engineering · doi:10.1061/jmenea.meeng-7519 · Cited by 2
Lee, J., & Park, W.-J. (2026) · Buildings · doi:10.3390/buildings16132517
Bhatta, S., Acharya, S., Roy, A., Adhikari, S., & Shahandashti, M. (2026) · ASCE International Conference on Transportation and Development (ICTD) · doi:10.1061/9780784487013.002
Branching into Resilience: A Network-Driven Random Forest Model for Project Vulnerability
Yeganeh, F. T., Zegordi, S. H., & Behnamian, J. (2026) · Networks and Spatial Economics · doi:10.1007/s11067-026-09770-x
ARVION: From Delay Detection to Intelligent Intervention in Industrial Projects
Immanuvel Arokia James, K., Rajasekar, M. D. G., Sivanya, S., Sindhuja, S., & Vijay Prabhakaran, R. (2026) · International Conference on System, Computation, Automation and Networking (ICSCAN) · doi:10.1109/icscan66520.2026.11588385
Bocean, C. G., Scriosteanu, A., Gîrboveanu, S., Mitrache, M., Sîrbu, M., Băloi, I.-C., Budică-Iacob, A.-F., & Criveanu, M. M. (2026) · Systems · doi:10.3390/systems14070818 · Cited by 1
Benchmarking Machine Learning Models for Software Project Schedule Overrun Prediction
Sweilem, A. R., Abdoh, H. J., & Abdoh, A. J. (2026) · Journal of Computer Science and Technology Studies · doi:10.32996/jcsts.2026.8.8.13
Billah, W., Alshibani, A., Mohammed, A., Alkhalifah, M., Ghaithan, A. M., & Khan, S. H. (2026) · International Journal of Construction Management · doi:10.1080/15623599.2026.2708230
Taghipour, M., Khanzadi, M., & Amirkhani, A. (2026) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2026.104362
Tanya Monic Twinkle, B., & Kanaga, E. G. M. (2026) · International Conference on Data Science and Business Systems (ICDSBS) · doi:10.1109/icdsbs69077.2026.11634728
“Ensemble Method under utilization: The construction industry has not yet adopted ensemble methods which have proved their effectiveness in other fields according to research by [9].”
InfluentialSalawudeen, A. A., Adebayo, R. A., & Ogundipe, O. B. (2026) · International journal of latest research in engineering and technology. · doi:10.56581/ijlret.12.07.01-20
How to customize generative artificial intelligence? Case Finnish hospital construction
Nyqvist, R., Peltokorpi, A., Marjavaara, P., Lehtovaara, J., & Oksanen, S. (2026) · Construction Innovation · doi:10.1108/ci-10-2025-0464
Elazhary, M., & El-adaway, I. H. (2026) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-18158
Tümtürk, E. (2026) · Engineering Construction & Architectural Management · doi:10.1108/ecam-09-2025-1553
Tian, Y., Chen, Y., & Ning, Y. (2026) · Automation in Construction · doi:10.1016/j.autcon.2026.107226
Zagia, F., Kajewski, S. L., Omrani, S., & Motamedisedeh, O. (2026) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-12-2025-0776
Moradi, A., & Asgharinia, M. (2026) · Proceedings of the Indian Division of the Institution of Electronic and Radio Engineers/Proceedings · doi:10.66224/jcer.8.1.47
Dabiri, A., & Behzadan, A. H. (2026) · AI · doi:10.3390/ai7090363
A bibliometric review of research on delays in construction projects between 2000-2024
TIRATACI, H., & Yaman, H. (2026) · Organization Technology and Management in Construction An International Journal · doi:10.2478/otmcj-2026-0009 · Cited by 1
“Density and betweenness centrality metrics further construction processes (Ika and Donnelly 2017; Gondia et al. 2020).”
InfluentialQuantum machine learning enhanced civil engineering industry 5.0
Sharma, C., Sood, K., & Sood, S. K. (2026) · The Journal of Supercomputing · doi:10.1007/s11227-026-08878-8
“In addition, recent studies have shifted towards digital technology applications in the construction ecosystem such as project delay prediction [91], BIM-AI convergence [92], digital twins [93], and AI-based construction management [2], indicating an increased interest in smart project planning,…”
Alsaadi, M. (2026) · International Journal of Computers and Informatics · doi:10.59992/ijci.2026.v5n9p1
Mohammed, E. (2026) · Bilad Alrafidain Journal for Engineering Science and Technology · doi:10.56990/bajest/2026.050216
Almoosa, S., Ahmed, V., & Bahroun, Z. (2026) · Results in Engineering · doi:10.1016/j.rineng.2026.113167
Explainable AI in Construction Project Management
Ottenheym, B. C. G. (2026) · TU/e Research Portal
Aliu, A. (2026) · International Journal of Innovative Science and Research Technology (IJISRT) · doi:10.38124/ijisrt/26aug1364
“In scheduling and risk, machine learning has been applied to construction delay-risk prediction [26] and to infrastructure project risk management through machine learning and optimization [27].”
Kitsao, B. H., Mbuvi, B. W., & Prakash, A. (2026) · International Journal of Economics Business and Innovation Research · doi:10.63922/ijebir.v5i03.3027
การบริหารจัดการมูลเหตุความล่าช้าในนวัตกรรมก่อสร้างภาครัฐด้วยเทคนิคเหมืองข้อมูล
Nachaithong, A., Ouansrimeang, S., & Wisaeng, K. (2024) · University of the Thai Chamber of Commerce Journal Humanities and Social Sciences
Ghimire, P. J., & Khatiwada, P. (2026) · International Journal of Construction Management · doi:10.1080/15623599.2026.2742381
Lawal, A. O., & Enyejo, J. O. (2023) · International Journal of Scientific Research in Civil Engineering · doi:10.32628/ijsrce237217
“…that delay and cost-risk patterns can be learned from historical project variables, although many published models predict a single outcome and do not explicitly integrate supply-chain, technical, and operational risk domains (Gondia et al., 2020; Egwim et al., 2021; Ashtari et al., 2022).”
Khan, Z. (2026) · Insights (Bhalwal) International Journal of Humanities Management and Social Sciences · doi:10.68156/46sjss47
Phan, D. L., Le, T.-T., Tran, N. M., & Tran, D.-H. (2026) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-04-2026-0307
SHRIVASTAVA, R. K., & Biswas, A. (2026) · Journal of Engineering Design and Technology · doi:10.1108/jedt-07-2026-0574
Assalahi, I. M., & Hasan, H. H. (2026) · African Journal of Advanced Pure and Applied Sciences
Reconfiguring power, trust, and identity in early contractor involvement
Gulzar, R. S., & Martín, H. G. (2026) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2026-0050
Rapid Pre-construction Forecasting of Schedule Overruns: A Machine Learning Regression Approach
Shdid, C. A., Awwad, R., & Nasr, J. (2026) · The Open Construction and Building Technology Journal · doi:10.2174/0118748368518070261027111727
Mostofa, A., & Azad, T. A. B. (2022) · American Journal of Advanced Technology and Engineering Solutions · doi:10.63125/g4at4237 · Cited by 9
Metadata
- Authors
- Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H.
- Affiliations
- McMaster University (CA)
- German University in Cairo (EG)
- Corresponding author
- Gondia, Ahmed
- Venue
- Journal of Construction Engineering and Management
- Published
- 2020-01
- Volume
- 146
- Issue
- 1
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2982358567
- Semantic Scholar
- f377710bec5c1ae3454e26eb951728250b2d2cb2
- Cited by
- 327
- References
- 61
- Citations by year
- 2026: 52 · 2025: 72 · 2024: 58 · 2023: 50 · 2022: 54 · 2021: 28 · 2020: 13
- FWCI
- 16.94
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Journal of Construction Engineering and Management (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Keywords
- construction delays, decision tree, naive Bayesian classification, project time performance, project risk management
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.