A leanness measure of manufacturing systems for quantifying impacts of lean initiatives
The DOI matches its Crossref record; 35 of the 35 references it cites were found in a registry or an index.
Abstract
Various lean tools and techniques have been developed for process improvement. In order to track the progress, lean metrics were developed correspondingly. However, an integrated and quantitative measure of overall leanness level has not been established. This paper proposes a unit-invariant leanness measure with a self-contained benchmark to quantify the leanness level of manufacturing systems. Evolved from the concept of data envelopment analysis (DEA), the leanness measure extracts the value-adding investments from a production process to determine the leanness frontier as a benchmark. A linear program based on slacks-based measure (SBM) derives the leanness score that indicates how lean the system is and how much waste exists. Using the score, impacts of various lean initiatives can be quantified as decision support information complementing the existing lean metrics.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Measuring the efficiency of decision making units
Charnes, A., Cooper, W. W., & Rhodes, E. (1978) · European Journal of Operational Research · doi:10.1016/0377-2217(78)90138-8 · Cited by 29,767
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
A slacks-based measure of efficiency in data envelopment analysis
Tone, K. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00407-5 · Cited by 5,632 · cited 6×
“SBM linear program (Tone 2001) Min ¼ t 1 m Xm i¼1 S i =xi0 ð6Þ Subject to 1 ¼ tþ 1 s Xs r¼1 S þ r =yr0 ð7Þ tx0 ¼ X þ S ð8Þ ty0 ¼ Y Sþ ð9Þ where , S , Sþ 0 t40 Tone (2001) claims that, for the optimal solution of the SBM linear program ( *, t*, *,S *,Sþ*), the following relationships exist: *¼ *, *¼…”
MethodInfluentialThe Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
A slacks-based measure of super-efficiency in data envelopment analysis
Tone, K. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(01)00324-1 · Cited by 3,576 · cited 5×
“SBM linear program (Tone 2001) Min ¼ t 1 m Xm i¼1 S i =xi0 ð6Þ Subject to 1 ¼ tþ 1 s Xs r¼1 S þ r =yr0 ð7Þ tx0 ¼ X þ S ð8Þ ty0 ¼ Y Sþ ð9Þ where , S , Sþ 0 t40 Tone (2001) claims that, for the optimal solution of the SBM linear program ( *, t*, *,S *,Sþ*), the following relationships exist: *¼ *, *¼…”
MethodInfluentialLean Thinking—Banish Waste and Create Wealth in your Corporation
Womack, J. P., & Jones, D. T. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600967 · Cited by 2,122
Lean Thinking-Banish Waste and Create Wealth in Your Corporation.
Rand, G., Womack, J., & Jones, D. T. (1997) · The Journal of the Operational Research Society · doi:10.2307/3010314 · Cited by 1,835
Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain
Ben Naylor, J., Naim, M. M., & Berry, D. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00223-0 · Cited by 1,573 · cited 2×
“Naylor et al. (1999) use ‘leanness’ to describe the process of realizing lean principles 6568 H.”
BackgroundMethodSUGIMORI, Y., KUSUNOKI, K., CHO, F., & UCHIKAWA, S. (1977) · International Journal of Production Research · doi:10.1080/00207547708943149 · Cited by 1,327 · cited 1×
“The TPS was first introduced in English to the academia by Sugimori et al. (1977).”
Background(2016) · International Series in Operations Research & Management Science · doi:10.1007/978-1-4899-7684-0 · Cited by 1,150
Toyota Production System: An Integrated Approach to Just-In-Time
Monden, Y. (1993) · Cited by 957
The seven value stream mapping tools
Hines, P., & Rich, N. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710157989 · Cited by 944 · cited 2×
“Hines and Rich ( 1997 ) introduced a set of value stream mapping tools in 1995 for identifying waste and appropriate routes to improvement.”
BackgroundHandbook on Data Envelopment Analysis
(2004) · International Series in Operations Research & Management Science · doi:10.1007/b105307 · Cited by 921
Toyota Production System: Beyond Large-Scale Production
Ohno, T., & Bodek, N. (2019) · Productivity Press eBooks · doi:10.4324/9780429273018 · Cited by 793
(1994) · ORCA Online Research @Cardiff (Cardiff University) · Cited by 721
Assessing changes towards lean production
Karlsson, C., & Åhlström, P. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610109820 · Cited by 621 · cited 3×
“Soriano-Meier and Forrester (2002) evaluate the degree of leanness of manufacturing firms using nine variables suggested by Karlsson and Ahlstrom (1996).”
BackgroundMethodLean, agile or leagile? Matching your supply chain to the marketplace
Mason-Jones, R., Naylor, B., & Towill, D. R. (2000) · International Journal of Production Research · doi:10.1080/00207540050204920 · Cited by 595 · cited 1×
“This definition has been cited by many following publications on leagility, including Mason-Jones et al. (2000).”
MethodClassification scheme for lean manufacturing tools
Pavnaskar, S. J., Gershenson, J. K., & Jambekar, A. B. (2003) · International Journal of Production Research · doi:10.1080/0020754021000049817 · Cited by 466 · cited 2×
“Pavnaskar et al. (2003) organize 101 lean tools and metrics to match manufacturing wastes with appropriate tools; however this matrix provides only the problem-tool connection without a measure of leanness.”
BackgroundLean indicators and manufacturing strategies
Martínez Sánchez, A., & Pérez Pérez, M. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110407436 · Cited by 397 · cited 1×
“Sanchez and Perez (2001) develop a check-list of 36 lean indicators in six groups to assess the changes towards lean.”
BackgroundLean Manufacturing: Tools, Techniques, and How to Use Them
Feld, W. M. (2000) · CRC Press eBooks · doi:10.1201/9781420025538 · Cited by 361 · cited 3×
“Hines and Rich (1997) introduced a set of value stream mapping tools in 1995 for identifying waste and appropriate routes to improvement.”
BackgroundHines, P., Rich, N., Bicheno, J., Brunt, D., Taylor, D., Butterworth, C., & Sullivan, J. (1998) · The International Journal of Logistics Management · doi:10.1108/09574099810805726 · Cited by 358
Lean manufacturing—tools, techniques, and how to use them
(2001) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(01)80022-4 · Cited by 330
Agility, adaptability and leanness: A comparison of concepts and a study of practice
Katayama, H., & Bennett, D. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00129-7 · Cited by 301 · cited 2×
“Katayama and Bennett ( 1999 ) point out that ‘labour productivity’ was once used as a measure of leanness, but it ignores the other benefits of leanness and could mislead the decision makers to over invest on automation.”
BackgroundDetty, R. B., & Yingling, J. C. (2000) · International Journal of Production Research · doi:10.1080/002075400189509 · Cited by 274 · cited 1×
“Detty and Yingling (2000) utilize simulation models with several performance metrics to quantify potential benefits of lean implementation.”
MethodA model for evaluating the degree of leanness of manufacturing firms
Soriano‐Meier, H., & Forrester, P. L. (2002) · Integrated Manufacturing Systems · doi:10.1108/09576060210415437 · Cited by 251 · cited 3×
“Soriano-Meier and Forrester (2002) evaluate the degree of leanness of manufacturing firms using nine variables suggested by Karlsson and Ahlstrom (1996).”
BackgroundMethodLean supply: the design and cost reduction dimensions
McIvor, R. (2001) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(01)00004-1 · Cited by 174 · cited 2×
“McIvor ( 2001 ) uses ‘total leanness’ to imply a perfectly lean state with several key dimensions of lean supply.”
BackgroundValue Stream Management: Eight Steps to Planning, Mapping, and Sustaining Lean Improvements
Tapping, D. (2002) · Productivity Press eBooks · doi:10.4324/9781482278163 · Cited by 136
A paradigm for benchmarking lean initiatives for quality improvement
Comm, C. L., & Mathaisel, D. F. X. (2000) · Benchmarking An International Journal · doi:10.1108/14635770010298584 · Cited by 119 · cited 2×
“Comm and Mathaisel (2000) describe leanness as a relative measure for whether a company is lean or not.”
BackgroundLean manufacturing for the small shop
Conner, G. B. (2001) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(01)80023-6 · Cited by 88
Swamidass, P. M. (2007) · International Journal of Production Research · doi:10.1080/00207540701223675 · Cited by 72 · cited 2×
“Alternatively, Swamidass ( 2007 ) use the ratio of total inventory to sales as a general performance index to analyse over 14,000 firm-years of lean practitioners.”
BackgroundDeveloping an understanding of corporate anorexia
Radnor, Z., & Boaden, R. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410524677 · Cited by 65 · cited 2×
“Radnor and Boaden ( 2004 ) summarize several interpretations of leanness, including an ideal state of lean, a context-dependent process, an ideal to be pursued, a condition of being lean, a particular state of the relationships between the facets of a system, and a journey to the ideal.”
BackgroundLean principles and premium brands: conflict or complement?
Oliver, N., Schab, L., & Holweg, M. (2007) · International Journal of Production Research · doi:10.1080/00207540701223600 · Cited by 41 · cited 1×
“For example, Oliver et al. (2007) conclude that companies adhering too narrowly to lean principles (waste-reduction) may be disadvantaged in premium-brand markets.”
BackgroundBrook, I., Baggaley, B., & Grasso, L. P. (2017) · Productivity Press eBooks · doi:10.1201/b11454 · Cited by 38
Strategic manufacturing capability pursuance: a conceptual framework
Leung, S., & Lee, W. B. (2004) · Benchmarking An International Journal · doi:10.1108/14635770410532598 · Cited by 32 · cited 3×
“Based on a maturity model, the LESAT assesses the leanness of an enterprise with surveys to determine the degree to which their goals are being achieved (Nightingale and Mize 2002). Although the lean indicators of assessment tools are designed to cover critical lean principles, a fixed set of indicators cannot fit eve…”
BackgroundMethodInfluentialMeasuring Leanness of Manufacturing Systems and Identifying Leanness Target by Considering Agility
Wan, H.-D. (2006) · VTechWorks (Virginia Tech) · Cited by 29
Self-citation
Cited by
The impact of lean methods and tools on the operational performance of manufacturing organisations
Belekoukias, I., Garza-Reyes, J. A., & Kumar, V. (2014) · International Journal of Production Research · doi:10.1080/00207543.2014.903348 · Cited by 474
Lean, leaner, too lean? The inventory–performance link revisited
Eroglu, C., & Hofer, C. (2011) · Journal of Operations Management · doi:10.1016/j.jom.2010.05.002 · Cited by 440
Four decades of lean: a systematic literature review
Stone, K. B. (2012) · International Journal of Lean Six Sigma · doi:10.1108/20401461211243702 · Cited by 393
The relationship between lean operations and sustainable operations
Piercy, N., & Rich, N. (2015) · International Journal of Operations & Production Management · doi:10.1108/ijopm-03-2014-0143 · Cited by 388
A Systematic Literature Review on Recent Lean Research: State‐of‐the‐art and Future Directions
Danese, P., Manfè, V., & Romano, P. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12156 · Cited by 345
Metadata
- Authors
- Wan, H.-D., & Frank Chen, F.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2008-12
- Volume
- 46
- Issue
- 23
- Pages
- 6567-6584
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2042921859
- Cited by
- 229
- References
- 35
- FWCI
- 17.39
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.