The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Demystifying the cost barriers to offsite construction in the UK
Abstract
Offsite construction has long been reported as an effective alternative to conventional construction, with wide-ranging benefits. However, a wider take-up has been inhibited by perceived cost barriers which are insufficiently studied. Such cost barriers are addressed, drawing on an examination of the cost performance of four types of construction method: pre-cast concrete cross-wall panel, in-situ reinforced concrete (RC) frame, steel frame and timber frame. Data were collected for 20 medium to high rise residential buildings of eight projects by a leading UK housebuilder over a five-year period (2004–08). In all cases, detailed cost comparisons were completed for build method selection. Cross-wall was found to be consistently cheaper than RC frame or steel frame by 11% to 32% in the projects. The process of developing and innovating cross-wall technology led to sustained cost savings up to 25% from its first use. Cross-wall construction also improved cost effectiveness of 20-storey high rise buildings over other solutions. Cost engineering means for achieving cost reduction and effectiveness are identified, which included efficiency learning, technological innovation, multinational partnering, and ‘in-house’ build management. The results prove the logic of the experience curve in improving the cost efficiency of offsite construction, and should encourage offsite construction in the future.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Hartley, J. (2004) · Essential Guide to Qualitative Methods in Organizational Research · doi:10.4135/9781446280119.n26 · Cited by 15,461
Cited by
Barriers to promoting prefabricated construction in China: A cost–benefit analysis
Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.171 · Cited by 503
Major Barriers to Off-Site Construction: The Developer’s Perspective in China
Mao, C., Shen, Q., Pan, W., & Ye, K. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000246 · Cited by 446
Self-citationA holistic review of off-site construction literature published between 2008 and 2018
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.08.195 · Cited by 363
Kamali, M., & Hewage, K. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.10.108 · Cited by 288
Metadata
- Authors
- Pan, W., & Sidwell, R.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2011-11
- Volume
- 29
- Issue
- 11
- Pages
- 1081-1099
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2063457506
- Cited by
- 196
- References
- 1
- FWCI
- 9.69
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Demystifying the cost barriers to offsite construction in the UK. https://app.cochat.ai/papers/10.1080/01446193.2011.637938
- The paper
- Pan, W., & Sidwell, R. (2011). Demystifying the cost barriers to offsite construction in the UK. Construction Management and Economics. https://doi.org/10.1080/01446193.2011.637938
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.