Energy-oriented deconstruction and recovery planning
The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Abstract
The reduction of waste through the establishment of closed-loop material flows has an important role in creating a more sustainable built environment. Especially in deconstruction projects, participants could take advantage of the application of waste management and recovery strategies while adhering to the principle of ‘sustainable construction’. The opportunity for materials recovery depends on the type of deconstruction technique applied at a building's end-of-life. An integrated deconstruction–recovery planning approach for deconstruction projects is developed to include ecological as well as economic benefits. This planning approach is an extension of the multi-mode resource-constrained project-scheduling problem (MMRCPSP) from operations research. Although the general MMRCPSP considers time– and resource–resource trade-offs, the proposed extension incorporates energy–time–resource trade-offs. The energy–time–resource trade-offs reflect the realization of energy savings or costs over the life cycle of a building. Based on a life cycle energy analysis, recovery options can be selected for deconstructed components and materials dependent on the chosen deconstruction techniques (e.g. demolition, selective deconstruction, manual deconstruction, and deconstruction using various resources). La réduction des déchets par l'établissement de flux de matériaux en boucles fermées a un rôle important dans la création d'un milieu bâti plus durable. Dans les projets de démolition, en particulier, les participants pourraient tirer parti de l'application de stratégies de gestion des déchets et de récupération tout en respectant les principes de la construction durable. L'opportunité de la récupération de matériaux dépend du type de technique de démolition utilisée à la fin de la vie utile d'un bâtiment. Une méthode de planification intégrée de la démolition-récupération pour les projets de démolition est développée pour inclure des avantages écologiques et économiques. Cette méthode de planning est une prolongation du problème d'ordonnancement de projet à réaliser à l'aide de ressources en nombre limité à plusieurs modes (MMRCPSP) inspiré de la recherche opérationnelle. Bien que le MMRCPSP général considère les arbitrages concernant le temps et les ressources, l'extension proposée inclut des arbitrages portant sur l'énergie, le temps et les ressources. De tels arbitrages traduisent la réalisation d'économies d'énergie ou de coût sur le cycle de vie d'un bâtiment. En se basant sur l'analyse énergétique du cycle de vie, on peut choisir des options de récupération portant sur des éléments démolis et des matériaux en fonction de la technique de démolition choisie (par exemple, démolition, démolition sélective, démolition manuelle et démolition utilisant diverses ressources). déchets de la construction et de la démolition; démolition; cycle de vie; récupération de matériaux; planning de projet; recyclage
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Pulselli, R. M., Simoncini, E., Pulselli, F. M., & Bastianoni, S. (2007) · Energy and Buildings · doi:10.1016/j.enbuild.2006.10.004 · Cited by 266 · cited 4×
“…1995; Crawley and Aho, 1999; Irurah and Holm, 1999; Fay et al., 2000; Thormark, 2000; Treloar et al., 2000; Erlandsson and Borg, 2003; Venkatarama Reddy and Jagadish, 2003; Emmanuel, 2004; Mithraratne and Vale, 2004; Ozel and Kohler, 2004; Pulselli et al., 2006; Mora, 2007; Richard et al., 2007).”
BackgroundInfluentialDesign for deconstruction and material reuse
Tingley, D. D., & Davison, B. (2011) · Proceedings of the Institution of Civil Engineers - Energy · doi:10.1680/ener.2011.164.4.195 · Cited by 142
Scheduling of deconstruction projects under resource constraints
Schultmann, F., & Rentz, O. (2002) · Construction Management and Economics · doi:10.1080/01446190210135913 · Cited by 24 · cited 2×
“4For instance, the deconstruction of a wall can be performed either by using pneumatic hammers and a grabbing bucket or by demolishing it (Schultmann and Rentz, 2002).”
BackgroundSelf-citation
Cited by
López Ruiz, L. A., Roca Ramón, X., & Gassó Domingo, S. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.119238 · Cited by 538
Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong
Jaillon, L., & Poon, C. S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.09.006 · Cited by 305
The next generation of sustainable construction
Kibert, C. J. (2007) · Building Research & Information · doi:10.1080/09613210701467040 · Cited by 205
Extended theory of planned behaviour for promoting construction waste recycling in Hong Kong
Mak, T. M. W., Yu, I. K. M., Wang, L., Hsu, S.-C., Tsang, D. C. W., Li, C. N., Yeung, T. L. Y., Zhang, R., & Poon, C. S. (2019) · Waste Management · doi:10.1016/j.wasman.2018.11.016 · Cited by 196
Design issues of using prefabrication in Hong Kong building construction
Jaillon, L., & Poon, C. (2010) · Construction Management and Economics · doi:10.1080/01446193.2010.498481 · Cited by 189
“Schultmann and Sunke ( 2007 ), based on a life cycle energy analysis, suggested that considering the limited space available for the disposal of waste, the depletion of resources such as wood, metal and natural gravel, the escalating amount of resource consumption for the manufacturing of new construction materials an…”
BackgroundRabbat, C., Awad, S., Villot, A., Rollet, D., & Andrès, Y. (2022) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2021.111962 · Cited by 183
Components reuse in the building sector – A systematic review
Rakhshan, K., Morel, J.-C., Alaka, H., & Charef, R. (2020) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20910463 · Cited by 228
A novel selective disassembly sequence planning method for adaptive reuse of buildings
Sanchez, B., & Haas, C. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.201 · Cited by 158
“…case studies the cost-effectiveness and the environmental impact reduction from the application f design for disassembly in building projects (Akbarnezhad et al., 2014, Densley Tingley and Davison, 2012, Guy and McLendon, 2000, Kokkos, 2014, Schultmann and Sunke, 2007, Silvestre et al., 2014).”
BackgroundChileshe, N., Rameezdeen, R., Hosseini, M. R., Martek, I., Li, H. X., & Panjehbashi-Aghdam, P. (2018) · Waste Management · doi:10.1016/j.wasman.2018.07.013 · Cited by 144
Barriers to implementing reverse logistics in South Australian construction organisations
Chileshe, N., Rameezdeen, R., Hosseini, M. R., & Lehmann, S. (2015) · Supply Chain Management: An International Journal · doi:10.1108/scm-10-2014-0325 · Cited by 121
Drivers for adopting reverse logistics in the construction industry: a qualitative study
Chileshe, N., Rameezdeen, R., & Hosseini, M. R. (2016) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-06-2014-0087 · Cited by 119
Hiete, M., Stengel, J., Ludwig, J., & Schultmann, F. (2011) · Building Research & Information · doi:10.1080/09613218.2011.576849 · Cited by 116
“On the supply side, design for deconstruction, selective deconstruction and pre-sorting favour mono-material C&D waste fractions (e.g., Schultmann, 2005; Raess et al., 2006; Schultmann and Sunke, 2007).”
BackgroundSelf-citationImpact of building service life models on life cycle assessment
Grant, A., & Ries, R. (2013) · Building Research & Information · doi:10.1080/09613218.2012.730735 · Cited by 103
Cost prediction model for building deconstruction in urban areas
Tatiya, A., Zhao, D., Syal, M., Berghorn, G. H., & LaMore, R. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.08.084 · Cited by 90
Rameezdeen, R., Chileshe, N., Hosseini, M. R., & Lehmann, S. (2016) · International Journal of Construction Management · doi:10.1080/15623599.2015.1110275 · Cited by 86
A Circular Built Environment in the Digital Age
(2024) · Circular Economy and Sustainability · doi:10.1007/978-3-031-39675-5 · Cited by 59
Re-Evaluating Heritage Waste: Sustaining Material Values through Deconstruction and Reuse
Ross, S. M. (2020) · The Historic Environment: Policy & Practice · doi:10.1080/17567505.2020.1723259 · Cited by 20
Metadata
- Authors
- Schultmann, F., & Sunke, N.
- Venue
- Building Research & Information
- Publisher
- Informa UK Limited
- Published
- 2007-11
- Volume
- 35
- Issue
- 6
- Pages
- 602-615
- ISSN
- 0961-3218 (ISSN-L)
- 1466-4321
- OpenAlex
- W1997010568
- Cited by
- 80
- References
- 3
- FWCI
- 7.66
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.