A review of occupational health and safety risk assessment approaches based on multi-criteria decision-making methods and their fuzzy versions
The DOI matches its Crossref record; 79 of the 79 references it cites were found in a registry or an index.
Abstract
Occupational health and safety (OHS) is a multidisciplinary activity working under the tasks of protection of workers and worksites. Risk assessment, as a compulsory process in implementation of OHS, stands out as evaluating the risks arising from the hazards, taking into account the required control measures, and deciding whether or not the risks can be reduced to an acceptable level. The diversity in risk assessment approaches is such that there are many methods for any industry. Multicriteria decision-making (MCDM)-based approaches contribute to risk assessment knowledge with their ability on solving real-world problems with multiple, conflicting, and incommensurate criteria. This article conducts a critical state-of-the-art review of OHS risk assessment studies using MCDM-based approaches. Additionally, it includes fuzzy versions of MCDM approaches applied to OHS risk assessment. A total of 80 papers are classified in eight different application areas. The papers are reviewed by the points of publication trend, published journal, risk parameters/factors, and tools used. This critical review provides an insight for researchers and practitioners on MCDM-based OHS risk assessment approaches in terms of showing current state and potential areas for attempts to be focused in the future.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
How to Make a Decision: The Analytic Hierarchy Process
Saaty, T. L. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90057-i · Cited by 9,605
Multiple Attribute Decision Making
Hwang, C.-L., & Yoon, K. (1981) · Lecture Notes in Economics and Mathematical Systems · doi:10.1007/978-3-642-48318-9 · Cited by 8,526 · cited 2×
“The TOPSIS method was first proposed by Hwang and Yoon (1981).”
MethodCompromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS
Opricovic, S., & Tzeng, G.-H. (2004) · European Journal of Operational Research · doi:10.1016/s0377-2217(03)00020-1 · Cited by 4,988 · cited 2×
“The compromise solution is a feasible solution which is the closest to the ideal solution like TOPSIS methodology (Opricovic and Tzeng 2004).”
MethodApplications of the Extent Analysis Method on Fuzzy AHP
Chang, D.-Y. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00300-2 · Cited by 4,874 · cited 1×
“In the related knowledge, many FAHP methods are proposed such as van Laarhoven and Pedrycz (1983), Buckley (1985), and Chang (1996).”
MethodBuckley, J. J. (1985) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(85)90090-9 · Cited by 3,360 · cited 1×
“In the related knowledge, many FAHP methods are proposed such as van Laarhoven and Pedrycz (1983), Buckley (1985), and Chang (1996).”
MethodDecision making with dependence and feedback : the analytic network process
Saaty, T. L. (1996) · Medical Entomology and Zoology · Cited by 3,356
A fuzzy extension of Saaty's priority theory
van Laarhoven, P. J. M., & Pedrycz, W. (1983) · Fuzzy Sets and Systems · doi:10.1016/s0165-0114(83)80082-7 · Cited by 3,045 · cited 1×
“In the related knowledge, many FAHP methods are proposed such as van Laarhoven and Pedrycz (1983), Buckley (1985), and Chang (1996).”
MethodA state-of the-art survey of TOPSIS applications
Behzadian, M., Khanmohammadi Otaghsara, S., Yazdani, M., & Ignatius, J. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2012.05.056 · Cited by 2,690
Multiple Objective Decision Making ― Methods and Applications: A State-of-the-Art Survey
Hwang, C.-L., & Yoon, K. (1979) · Medical Entomology and Zoology · Cited by 1,853
Risk assessment and risk management: Review of recent advances on their foundation
Aven, T. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.12.023 · Cited by 1,713 · cited 1×
“Aven (2016) made a comprehensive review of recent advances on risk assessment and management with a special focus on the fundamental ideas and thinking.”
BackgroundIntegrated analytic hierarchy process and its applications – A literature review
Ho, W. (2008) · European Journal of Operational Research · doi:10.1016/j.ejor.2007.01.004 · Cited by 1,159 · cited 1×
“An in-depth knowledge and analysis is provided in Ho (2008) for AHP, Kubler et al. (2016) for FAHP, Behzadian et al. (2012) for TOPSIS/FTOPSIS, Gul et al. (2016) for VIKOR/ FVIKOR.”
MethodKlinke, A., & Renn, O. (2002) · Risk Analysis · doi:10.1111/1539-6924.00274 · Cited by 668 · cited 1×
“OHS risk assessment and management involves many stakeholders who possess different objectives and criteria (Klinke and Renn 2002).”
Background1Multi-Criteria Decision Making: An Operations Research Approach
Triantaphyllou, E., Shu, B., Sánchez, S. N., & Ray, T. (2014) · Cited by 594
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574 · cited 2×
“It is mostly used with FAHP (Taylan et al. 2014; Gul and Guneri 2016; Akyildiz and Mentes 2017).”
BackgroundDeveloping a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management
Dağdeviren, M., & Yüksel, İ. (2007) · Information Sciences · doi:10.1016/j.ins.2007.10.016 · Cited by 479 · cited 10×
“factors occurrence, severity and detection and the extended VIKOR was used to determine risk priorities of the failure modes. A case was carried out in a general anesthesia process. As a shortcoming of the proposed approach, no sensitivity analysis was carried out in order to demonstrate the validity. Mandal et al. (2…”
MethodInfluentialA state-of the-art survey & testbed of fuzzy AHP (FAHP) applications
Kubler, S., Robert, J., Derigent, W., Voisin, A., & Le Traon, Y. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2016.08.064 · Cited by 441 · cited 16×
“They incorporate 5S methodology, FMEA, interval type-two fuzzy sets, AHP, and VIKOR in risk assessment of the university laboratory operations.”
BackgroundMethodInfluentialMarhavilas, P. K., Koulouriotis, D., & Gemeni, V. (2011) · Journal of Loss Prevention in the Process Industries · doi:10.1016/j.jlp.2011.03.004 · Cited by 436
Occupational risk assessment in construction industry – Overview and reflection
Pinto, A., Nunes, I. L., & Ribeiro, R. A. (2011) · Safety Science · doi:10.1016/j.ssci.2011.01.003 · Cited by 432 · cited 2×
“In Pinto et al. (2011), OHS risk assessment methods were dealt as a state-of-theart for construction industry by discussing the limitations and pointing advantages of fuzzy sets based approaches.”
BackgroundMethodAminbakhsh, S., Gunduz, M., & Sonmez, R. (2013) · Journal of Safety Research · doi:10.1016/j.jsr.2013.05.003 · Cited by 401 · cited 5×
“2012), rank safety risks or failures caused by controllable hazards (Aminbakhsh et al. 2013; Dong and Cooper 2016; Kokang€ ul et al. 2017; Kang et al. 2014), and determine safety/risk scores/weights in a hierarchical risk assessment process (Ardeshir et al. 2014; Wang et al. 2016; Topuz and van Gestel 2016; Debnath et…”
BackgroundMethodInfluentialFattahi, R., & Khalilzadeh, M. (2018) · Safety Science · doi:10.1016/j.ssci.2017.10.018 · Cited by 391
Liu, H.-C., Liu, L., Liu, N., & Mao, L.-X. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2012.05.031 · Cited by 388 · cited 1×
“Liu and Tsai (2012) proposed an integrated approach benefiting from a two stage QFD, FANP, and FFMEA for occupational hazards in the construction industry.”
BackgroundZheng, G., Zhu, N., Tian, Z., Chen, Y., & Sun, B. (2012) · Safety Science · doi:10.1016/j.ssci.2011.08.042 · Cited by 381 · cited 5×
“The class of Others includes (1) work, environment, and worker factors (Ilangkumaran et al. 2015; Zheng et al. 2012), (2) organizational, personal, job related and environmental factors (Tian and Yan 2013; Da gdeviren and Y€uksel 2008), economic and financial risk, planning risk, contractual and…”
BackgroundInfluentialRisk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP
Abdelgawad, M., & Fayek, A. R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000210 · Cited by 340
A state of the art literature review of VIKOR and its fuzzy extensions on applications
Gül, M., Çelik, E., Aydın, N., Gümüş, A. T., & Güneri, A. F. (2016) · Applied Soft Computing · doi:10.1016/j.asoc.2016.04.040 · Cited by 329 · cited 6×
“Besides, papers related to ANP/FANP, TOPSIS/FTOPSIS, and VIKOR/FVIKOR based approaches are published after the year 2012.”
BackgroundMethodInfluentialFuzzy TOPSIS approach for failure mode, effects and criticality analysis
Braglia, M., Frosolini, M., & Montanari, R. (2003) · Quality and Reliability Engineering International · doi:10.1002/qre.528 · Cited by 297 · cited 2×
“As a methodological contribution to the FTOPSIS-based risk assessment approaches, Braglia et al. (2003) Ta bl e 5.”
MethodA fuzzy Bayesian network approach for risk analysis in process industries
Yazdi, M., & Kabir, S. (2017) · Process Safety and Environmental Protection · doi:10.1016/j.psep.2017.08.015 · Cited by 288 · cited 12×
“FTA was used to identify the main causes of events and incidents.”
BackgroundMethodInfluentialHuman health and safety risks management in underground coal mines using fuzzy TOPSIS
Mahdevari, S., Shahriar, K., & Esfahanipour, A. (2014) · Science of The Total Environment · doi:10.1016/j.scitotenv.2014.04.076 · Cited by 274
A new approximation for risk assessment using the AHP and Fine Kinney methodologies
Kokangül, A., Polat, U., & Dağsuyu, C. (2016) · Safety Science · doi:10.1016/j.ssci.2016.07.015 · Cited by 272
Huang, J., Li, Z., & Liu, H.-C. (2017) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2017.06.014 · Cited by 250
The use of multi-criteria decision analysis to tackle waste management problems: a literature review
Achillas, C., Moussiopoulos, N., Karagiannidis, A., Banias, G., & Perkoulidis, G. (2013) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x12470203 · Cited by 236 · cited 2×
“These methods are used to identify either the single most preferred alternative, short-list alternatives for subsequent detailed analysis, rank different alternatives, or to differentiate acceptable from unacceptable possibilities (Achillas et al. 2013).”
BackgroundMethodA fuzzy risk assessment approach for occupational hazards in the construction industry
Liu, H.-T., & Tsai, Y.-L. (2011) · Safety Science · doi:10.1016/j.ssci.2011.11.021 · Cited by 227 · cited 4×
“In the risk assessment literature, both methods are used by researchers in order to determine priorities of the risk groups/failure modes (Liu et al. 2012; Mandal et al. 2015; Gul et al. 2017a; Gul et al. 2017b; Gul et al. 2017c; Mohsen and Fereshteh 2017; Ozdemir et al. 2017).”
BackgroundMethodInfluentialOccupational Health and Safety Management in Organizations: A Review
Zanko, M., & Dawson, P. (2011) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2011.00319.x · Cited by 221 · cited 1×
“It identifies sources of risk and determines control measures before an injury happened (Zanko and Dawson 2012).”
BackgroundA combined multi-criteria approach to support FMECA analyses: A real-world case
Carpitella, S., Certa, A., Izquierdo, J., & Fata, C. M. L. (2017) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2017.09.017 · Cited by 218 · cited 2×
“Carpitella et al. (2018) used three evaluation parameters that differ from those traditionally involved in RPN computation in classical FMECA (i.e., severity, occurrence, and detection).”
MethodMohsen, O., & Fereshteh, N. (2017) · Safety Science · doi:10.1016/j.ssci.2016.10.006 · Cited by 210 · cited 1×
“MCDM and fuzzy logic integrated MCDM readily provide capturing the judgment of the decisionmakers to weigh and rank the risk parameters and associated hazards when accurate and complete risk data are unavailable (Ng et al. 2017).”
BackgroundKuo, Y.-C., & Lu, S.-T. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.10.003 · Cited by 199 · cited 2×
“…al. 2012), (2) organizational, personal, job related and environmental factors (Tian and Yan 2013; Da gdeviren and Y€uksel 2008), economic and financial risk, planning risk, contractual and legal risk, design risk, geological risk and construction risk (Kuo and Lu 2013; Zou and Lee 2010) and so on.”
BackgroundValidity and validation of safety-related quantitative risk analysis: A review
Goerlandt, F., Khakzad, N., & Reniers, G. (2016) · Safety Science · doi:10.1016/j.ssci.2016.08.023 · Cited by 189
Risk evaluation of green components to hazardous substance using FMEA and FAHP
Hu, A. H., Hsu, C.-W., Kuo, T.-C., & Wu, W.-C. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.08.031 · Cited by 189 · cited 9×
“Liu and Tsai (2012) proposed an integrated approach benefiting from a two stage QFD, FANP, and FFMEA for occupational hazards in the construction industry.”
BackgroundMethodInfluentialAn orders-of-magnitude AHP supply chain risk assessment framework
Dong, Q., & Cooper, O. (2016) · International Journal of Production Economics · doi:10.1016/j.ijpe.2016.08.021 · Cited by 189 · cited 4×
“In order to eliminate this drawback, Dong and Cooper (2016) propose a new method called ordersof-magnitude AHP.”
BackgroundMethodInfluentialEvaluating the risk of failure modes with extended MULTIMOORA method under fuzzy environment
Liu, H.-C., Fan, X.-J., Li, P., & Chen, Y.-Z. (2014) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2014.04.011 · Cited by 185
Ebrahimnejad, S., Mousavi, S. M., & Seyrafianpour, H. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.05.037 · Cited by 178 · cited 1×
“Ebrahimnejad et al. (2010) made a risk assessment for build–operate–transfer projects by FLINMAP and FTOPSIS.”
BackgroundFailure Mode and Effect Analysis Using Cloud Model Theory and PROMETHEE Method
Liu, H.-C., Li, Z., Song, W., & Su, Q. (2017) · IEEE Transactions on Reliability · doi:10.1109/tr.2017.2754642 · Cited by 175
Gul, M., & Guneri, A. F. (2016) · Journal of Loss Prevention in the Process Industries · doi:10.1016/j.jlp.2015.11.023 · Cited by 175
Self-citationFuzzy Analytic Hierarchy Process
Emrouznejad, A., & Ho, W. (2017) · Chapman & Hall/CRC eBooks · doi:10.1201/9781315369884 · Cited by 174
Ji, Y., Huang, G. H., & Sun, W. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2014.12.026 · Cited by 162 · cited 1×
“Apart from the abovementioned TOPSIS based risk assessment approaches, Ji et al. (2015) aimed to model to risk assessment of 10 national hydropower stations along the Xiangxi River in China.”
BackgroundMulti Criteria Decision Making
Majumder, M., & Saha, A. K. (2016) · SpringerBriefs in energy · doi:10.1007/978-981-287-308-8_3 · Cited by 160
Raviv, G., Shapira, A., & Fishbain, B. (2016) · Safety Science · doi:10.1016/j.ssci.2016.08.027 · Cited by 160 · cited 2×
“2014), and determine safety/risk scores/weights in a hierarchical risk assessment process (Ardeshir et al. 2014; Wang et al. 2016; Topuz and van Gestel 2016; Debnath et al. 2016; Othman et al. 2016; Gul et al. 2017b; Gul et al. 2017c; Raviv et al. 2017).”
BackgroundAn, M., Chen, Y., & Baker, C. (2011) · Information Sciences · doi:10.1016/j.ins.2011.04.051 · Cited by 155 · cited 14×
“Final priority of hazards based on severity of level of risk associated with them is obtained considering the outcome of FRA approach in terms of risk score for the hazards, combined with the priority weights obtained from AHP technique.”
BackgroundMethodInfluentialGül, M., Ak, M. F., & Güneri, A. F. (2016) · Human and Ecological Risk Assessment An International Journal · doi:10.1080/10807039.2016.1234363 · Cited by 143 · cited 6×
“Many authors (Kokang€ul et al. 2017; Akyildiz and Mentes 2017; An et al. 2016; Othman et al. 2016; Gul et al. 2017a; Gul and Guneri 2016; Mandal et al. 2015; Meknatjoo and Omidvari 2015; €Ozfırat 2014; Liu et al. 2014; Abdelgawad and Fayek 2010; Grassi et al. 2009; Hu et al. 2009) have highlighted…”
BackgroundMethodInfluentialAn integrated fuzzy risk assessment for seaport operations
John, A., Paraskevadakis, D., Bury, A., Yang, Z., Riahi, R., & Wang, J. (2014) · Safety Science · doi:10.1016/j.ssci.2014.04.001 · Cited by 140 · cited 4×
“…FAHP is integrated with other tools such as FIS (Topuz et al. 2011; Acuner and Cebi 2016), FRA (An et al. 2011; Verma and Chaudhri 2014), ER (Lavasani et al. 2011; John et al. 2014), FMEA/ FFMEA (Hu et al. 2009; Abdelgawad and Fayek 2010; €Ozfırat 2014) and FTA (Yazdi 2017; Yazdi and Kabir 2017).”
BackgroundMethodInfluentialA new Fine-Kinney-based risk assessment framework using FAHP-FVIKOR incorporation
Gül, M., Guven, B., & Güneri, A. F. (2017) · Journal of Loss Prevention in the Process Industries · doi:10.1016/j.jlp.2017.08.014 · Cited by 138 · cited 6×
“Many authors (Kokang€ul et al. 2017; Akyildiz and Mentes 2017; An et al. 2016; Othman et al. 2016; Gul et al. 2017a; Gul and Guneri 2016; Mandal et al. 2015; Meknatjoo and Omidvari 2015; €Ozfırat 2014; Liu et al. 2014; Abdelgawad and Fayek 2010; Grassi et al. 2009; Hu et al. 2009) have highlighted…”
BackgroundMethodInfluentialA fuzzy multi-attribute model for risk evaluation in workplaces
Grassi, A., Gamberini, R., Mora, C., & Rimini, B. (2008) · Safety Science · doi:10.1016/j.ssci.2008.10.002 · Cited by 134 · cited 4×
“Grassi et al. (2009) contributed to the risk assessment knowledge by proposing a new fuzzy based method taking into account effects of human behaviour and environment on risk value.”
BackgroundMethodInfluentialAn application of nonlinear fuzzy analytic hierarchy process in safety evaluation of coal mine
Wang, Q., Wang, H., & Qi, Z. (2016) · Safety Science · doi:10.1016/j.ssci.2016.02.012 · Cited by 128 · cited 4×
“This situation was not taken into consideration (as in Qiaoxiu et al. 2016).”
BackgroundMethodInfluentialA fuzzy risk assessment model for hospital information system implementation
Yücel, G., Çebi, S., Höge, B., & Özok, A. F. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.07.129 · Cited by 124 · cited 2×
“Yucel et al. (2012) developed a new predictive risk assessment model for a hospital information system (HIS).”
BackgroundFuzzy risk assessment of oil and gas offshore wells
Lavasani, S. M. M., Yang, Z., Finlay, J., & Wang, J. (2011) · Process Safety and Environmental Protection · doi:10.1016/j.psep.2011.06.006 · Cited by 118 · cited 4×
“…FAHP is integrated with other tools such as FIS (Topuz et al. 2011; Acuner and Cebi 2016), FRA (An et al. 2011; Verma and Chaudhri 2014), ER (Lavasani et al. 2011; John et al. 2014), FMEA/ FFMEA (Hu et al. 2009; Abdelgawad and Fayek 2010; €Ozfırat 2014) and FTA (Yazdi 2017; Yazdi and Kabir…”
BackgroundMethodInfluentialAkyüz, E., & Çelik, M. (2015) · Safety Science · doi:10.1016/j.ssci.2015.02.008 · Cited by 115 · cited 6×
“Among these approaches, the most widely applied method is DEMATEL and its fuzzy version FDEMATEL (Zhou et al. 2014; Meknatjoo and Omidvari 2015; Akyuz and Celik 2015; Mentes et al. 2015).”
BackgroundMethodInfluentialAkyüz, E. (2015) · Safety Science · doi:10.1016/j.ssci.2015.06.019 · Cited by 114 · cited 10×
“Regarding marine risk assessment and management, three studies were reviewed (Akyuz and Celik 2015; Akyuz and Celik 2016; Akyuz et al. 2016). In these studies, AHP was hybridized with HEART methodology. Akyuz and Celik (2016) proposed a hybrid human error probability determination approach for cargo loading operation…”
BackgroundMethodInfluentialSousa, V., Almeida, N. M., & Dias, L. A. (2015) · Safety Science · doi:10.1016/j.ssci.2015.01.003 · Cited by 111 · cited 1×
“As one of the most crucial processes of OHS management, risk assessment and management has gained great importance due to some regulatory and legal measures recently (Sousa et al. 2015).”
BackgroundHybrid Probabilistic Risk Assessment Using Fuzzy FTA and Fuzzy AHP in a Process Industry
Yazdi, M. (2017) · Journal of Failure Analysis and Prevention · doi:10.1007/s11668-017-0305-4 · Cited by 104 · cited 11×
“FTA was used to identify the main causes of events and incidents.”
BackgroundMethodInfluentialMandal, S., Singh, K., Behera, R. K., Sahu, S. K., Raj, N., & Maiti, J. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.05.033 · Cited by 101
Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2
Zou, P. X. W., & Li, J. (2010) · Construction Management and Economics · doi:10.1080/01446193.2010.519781 · Cited by 95
Ozdemir, Y., Gül, M., & Çelik, E. (2017) · Human and Ecological Risk Assessment An International Journal · doi:10.1080/10807039.2017.1292844 · Cited by 95 · cited 2×
“In the risk assessment literature, both methods are used by researchers in order to determine priorities of the risk groups/failure modes (Liu et al. 2012; Mandal et al. 2015; Gul et al. 2017a; Gul et al. 2017b; Gul et al. 2017c; Mohsen and Fereshteh 2017; Ozdemir et al. 2017).”
BackgroundMethodMulti-criteria risk analysis to improve safety in manufacturing systems
Silvestri, A., Felice, F. D., & Petrillo, A. (2012) · International Journal of Production Research · doi:10.1080/00207543.2012.657968 · Cited by 90 · cited 7×
“Carpitella et al. (2018) used three evaluation parameters that differ from those traditionally involved in RPN computation in classical FMECA (i.e., severity, occurrence, and detection).”
MethodInfluentialFuzzy inference model for assessing occupational risks in construction sites
Debnath, J., Biswas, A., Sivan, P. P., Sen, K. N., & Sahu, S. (2016) · International Journal of Industrial Ergonomics · doi:10.1016/j.ergon.2016.08.004 · Cited by 78 · cited 3×
“2014), and determine safety/risk scores/weights in a hierarchical risk assessment process (Ardeshir et al. 2014; Wang et al. 2016; Topuz and van Gestel 2016; Debnath et al. 2016; Othman et al. 2016; Gul et al. 2017b; Gul et al. 2017c; Raviv et al. 2017).”
BackgroundMethodRisk analysis and warning rate of hot environment for foundry industry using hybrid MCDM technique
Ilangkumaran, M., Karthikeyan, M., Ramachandran, T., Boopathiraja, M., & Kirubakaran, B. (2014) · Safety Science · doi:10.1016/j.ssci.2014.08.011 · Cited by 73 · cited 2×
“The class of Others includes (1) work, environment, and worker factors (Ilangkumaran et al. 2015; Zheng et al. 2012), (2) organizational, personal, job related and environmental factors (Tian and Yan 2013; Da gdeviren and Y€uksel 2008), economic and financial risk, planning risk, contractual and…”
BackgroundA hybrid risk-based approach for maritime applications: The case of ballast tank maintenance
Gül, M., Çelik, E., & Akyüz, E. (2017) · Human and Ecological Risk Assessment An International Journal · doi:10.1080/10807039.2017.1317204 · Cited by 73 · cited 6×
“Many authors (Kokang€ul et al. 2017; Akyildiz and Mentes 2017; An et al. 2016; Othman et al. 2016; Gul et al. 2017a; Gul and Guneri 2016; Mandal et al. 2015; Meknatjoo and Omidvari 2015; €Ozfırat 2014; Liu et al. 2014; Abdelgawad and Fayek 2010; Grassi et al. 2009; Hu et al. 2009) have highlighted…”
BackgroundMethodInfluentialA fuzzy AHP methodology for selection of risk assessment methods in occupational safety
Güneri, A. F., Gül, M., & Özgürler, Ş. (2015) · International Journal of Risk Assessment and Management · doi:10.1504/ijram.2015.071222 · Cited by 71 · cited 1×
“The selection among these methods has become of vital importance as different outputs, steps, and applications arise there from (Reniers et al. 2005; Guneri et al. 2015).”
BackgroundAkyüz, E., & Çelik, M. (2016) · Journal of Loss Prevention in the Process Industries · doi:10.1016/j.jlp.2016.06.020 · Cited by 67 · cited 3×
“Akyuz and Celik (2016) proposed a hybrid human error probability determination approach for cargo loading operation in oil/chemical tanker ship.”
BackgroundMethodAn integrated risk assessment based on uncertainty analysis for cargo vessel safety
Akyildız, H., & Menteş, A. (2016) · Safety Science · doi:10.1016/j.ssci.2016.09.009 · Cited by 65 · cited 10×
“Many authors (Kokang€ul et al. 2017; Akyildiz and Mentes 2017; An et al. 2016; Othman et al. 2016; Gul et al. 2017a; Gul and Guneri 2016; Mandal et al. 2015; Meknatjoo and Omidvari 2015; €Ozfırat 2014; Liu et al. 2014; Abdelgawad and Fayek 2010; Grassi et al. 2009; Hu et al. 2009) have highlighted…”
BackgroundMethodInfluentialSHARE technique: A novel approach to root cause analysis of ship accidents
Keçeci, T., & Arslan, Ö. (2017) · Safety Science · doi:10.1016/j.ssci.2017.03.002 · Cited by 65
Failure Mode and Effect Analysis using Soft Set Theory and COPRAS Method
Wang, Z.-L., You, J., Liu, H., & Wu, S. (2017) · International Journal of Computational Intelligence Systems · doi:10.2991/ijcis.2017.10.1.67 · Cited by 63
Identifying and managing failures in stone processing industry using cost-based FMEA
Rezaee, M. J., Salimi, A., & Yousefı, S. (2016) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-016-9019-0 · Cited by 61 · cited 2×
“Rezaee et al. (2017) and Efe et al. (2016) used DEA and FPROMETHEE in their risk assessment studies.”
MethodVerma, S., & Chaudhari, S. (2016) · International Journal of Mining Science and Technology · doi:10.1016/j.ijmst.2016.05.023 · Cited by 55
Fuzzy Analytic Hierarchy Process for Risk Assessment to General-assembling of Satellite
Tian, J., & Yan, Z. (2013) · Journal of Applied Research and Technology · doi:10.1016/s1665-6423(13)71564-5 · Cited by 52
Topuz, E., & van Gestel, C. A. M. (2016) · Environment International · doi:10.1016/j.envint.2016.04.022 · Cited by 52
A new risk evaluation method for oil storage tank zones based on the theory of two types of hazards
Kang, J., Liang, W., Zhang, L., Lu, Z., Liu, D., Yin, W., & Zhang, G. (2014) · Journal of Loss Prevention in the Process Industries · doi:10.1016/j.jlp.2014.03.007 · Cited by 41 · cited 3×
“2012), rank safety risks or failures caused by controllable hazards (Aminbakhsh et al. 2013; Dong and Cooper 2016; Kokang€ ul et al. 2017; Kang et al. 2014), and determine safety/risk scores/weights in a hierarchical risk assessment process (Ardeshir et al.”
BackgroundMethodVerma, S., & Chaudhri, S. (2014) · Journal of Industrial Engineering and Management · doi:10.3926/jiem.948 · Cited by 33 · cited 8×
“Final priority of hazards based on severity of level of risk associated with them is obtained considering the outcome of FRA approach in terms of risk score for the hazards, combined with the priority weights obtained from AHP technique.”
BackgroundMethodInfluentialA Multi-Criteria Approach for Risk Assessment of Dry Port-Seaport System
Bentaleb, F., Mabrouki, C., & Semma, A. (2015) · Supply Chain Forum an International Journal · doi:10.1080/16258312.2015.11728692 · Cited by 26 · cited 1×
“Bentaleb et al. (2015) analysed and assessed risk factors within the dry port-seaport system using MACBETH.”
MethodYerlikaya, M. A., Efe, B., & Efe, Ö. F. (2016) · Gümüşhane Üniversitesi Fen Bilimleri Enstitüsü Dergisi · doi:10.17714/gufbed.2016.06.012 · Cited by 22
MEDIA MIX DECISION SUPPORT FOR SCHOOLS BASED ON ANALYTIC NETWORK PROCESS
Chang, S.-H., Wu, T.-C., Tseng, H.-E., et al. (2012) · International journal of industrial engineering · Cited by 7
Cited by
A comparative outline for quantifying risk ratings in occupational health and safety risk assessment
Gul, M., & Ak, M. F. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.06.106 · Cited by 210
Self-citationThe applications of MCDM methods in COVID-19 pandemic: A state of the art review
Sotoudeh-Anvari, A. (2022) · Applied Soft Computing · doi:10.1016/j.asoc.2022.109238 · Cited by 194
“Gul [33] conducted a state-of-the-art review of occupational health and safety risk assessment using MCDM methods.”
Exploring the barriers to renewable energy adoption utilising MULTIMOORA- EDAS method
Asante, D., He, Z., Adjei, N. O., & Asante, B. (2020) · Energy Policy · doi:10.1016/j.enpol.2020.111479 · Cited by 182
Pythagorean fuzzy VIKOR-based approach for safety risk assessment in mine industry
Gul, M., Ak, M. F., & Guneri, A. F. (2019) · Journal of Safety Research · doi:10.1016/j.jsr.2019.03.005 · Cited by 180
AHP–TOPSIS integration extended with Pythagorean fuzzy sets for information security risk analysis
Ak, M. F., & Gul, M. (2019) · Complex & Intelligent Systems · doi:10.1007/s40747-018-0087-7 · Cited by 165
Self-citation
Metadata
- Authors
- Gul, M.
- Venue
- Human and Ecological Risk Assessment: An International Journal
- Publisher
- Informa UK Limited
- Published
- 2018-02-02
- Volume
- 24
- Issue
- 7
- Pages
- 1723-1760
- ISSN
- 1080-7039 (ISSN-L)
- 1549-7860
- OpenAlex
- W2791656366
- Cited by
- 188
- References
- 79
- FWCI
- 14.59
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.