The DOI matches its Crossref record; 67 of the 70 references it cites were found in a registry or an index.
Sustainable procurement in the public sector: an international comparative study
Abstract
Purpose Public bodies are being encouraged to procure sustainably, to reduce their social and environmental footprint and in order to stimulate sustainability in the private sector. However, little is known about how public sector organisations internationally are responding to this encouragement or of the conditions that are most conducive to sustainable procurement (SP). The purpose of this paper is to address these gaps in our knowledge so as to inform policy development at the government and organisational levels. Design/methodology/approach The authors report the findings of a survey of SP practices within a sample of over 280 public procurement practitioners from 20 countries and with collective responsibility for expenditure totalling $45bn p.a. Findings The authors' analysis shows that some SP practices are evident in public sector procurement practice and that the extent and nature of SP practices varies significantly across regions. In addition, the authors highlight the main facilitators of, and barriers to, engagement with SP and investigate their importance for engagement with particular dimensions of SP. Research limitations/implications Survey respondents are volunteers and may to some degree be more interested in, or engaged with, SP than other public sector organisations. The analysis is cross‐sectional and therefore provides only a snapshot of SP practice in the public sector organisations studied. Practical implications The paper identifies how policy and p…
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“In the academic literature, there is more research on indirect approaches than direct ones.”
From Green public procurement as an effective way for sustainable development: A systematic literature review and bibliometric analysis (2025) · cites this paper as Brammer & Walker, 2011
In the citing paper
“Individual commitment also plays a vital role in the discretionary aspects of GPPs, such as philanthropy and procurement from small and local businesses (Brammer & Walker, 2011), and generally for moral and ethical motivations.”
From Green public procurement as an effective way for sustainable development: A systematic literature review and bibliometric analysis (2025) · cites this paper as Brammer & Walker, 2011
In the citing paper
“Financial constraints also hinder the adoption of GPP practises (Brammer & Walker, 2011), especially when the economy is prioritised over non-economic dimensions (Treviño-Lozano, 2021) or when sustainability is not considered a priority in the early design of public procurement.”
From Green public procurement as an effective way for sustainable development: A systematic literature review and bibliometric analysis (2025) · cites this paper as Brammer & Walker, 2011
In the citing paper
“Financial constraints Brammer and Walker (2011); Treviño-Lozano (2021)”
From Green public procurement as an effective way for sustainable development: A systematic literature review and bibliometric analysis (2025) · cites this paper as Brammer and Walker (2011)
In the citing paper
“Individual commitment Brammer and Walker (2011)”
From Green public procurement as an effective way for sustainable development: A systematic literature review and bibliometric analysis (2025) · cites this paper as Brammer and Walker (2011)
In the citing paper
“Furthermore, top management needs to be committed to sustainability (Brammer and Walker, 2011;Vejaratnam et al., 2020), and bringing it into the procurement process redefines the options and adds a dimension other than price, quality and time (Meehan and Bryde, 2011).”
From Implementation and management of a circular public procurement contract for furniture (2023) · cites this paper as Brammer and Walker, 2011
In the citing paper
“Strong leadership and managerial commitment are therefore key determinants of CPP implementation (see, e.g., Brammer and Walker, 2011;Vejaratnam et al., 2020).”
From Implementation and management of a circular public procurement contract for furniture (2023) · cites this paper as Brammer and Walker, 2011
Citations
Cites
Qualitative Data Analysis: An Expanded Sourcebook
(1994) · Journal of Environmental Psychology · doi:10.1016/s0272-4944(05)80231-2 · Cited by 48,420
Basics of Qualitative Research: Grounded Theory Procedures and Techniques.
Ellis, C., Strauss, A., & Corbin, J. M. (1992) · Contemporary Sociology A Journal of Reviews · doi:10.2307/2074814 · Cited by 29,296
Handbook of Qualitative Research
Crozier, G., Denzin, N., & Lincoln, Y. (1994) · British Journal of Educational Studies · doi:10.2307/3121684 · Cited by 26,666
Basics of Qualitative Research
Ozanne, J. L., Strauss, A., & Corbin, J. (1992) · Journal of Marketing Research · doi:10.1177/002224379202900312 · Cited by 17,864
WHY COMPANIES GO GREEN: A MODEL OF ECOLOGICAL RESPONSIVENESS.
Bansal, P., & Roth, K. (2000) · Academy of Management Journal · doi:10.2307/1556363 · Cited by 4,020
Green supply-chain management: a state-of-the-art literature review
Srivastava, S. K. (2007) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2007.00202.x · Cited by 3,984
Zhu, Q., & Sarkis, J. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2004.01.005 · Cited by 2,681
Do green supply chains lead to competitiveness and economic performance?
Rao, P., & Holt, D. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510613956 · Cited by 2,453
5. Sampling and Estimation in Hidden Populations Using Respondent-Driven Sampling
Salganik, M., & Heckathorn, D. D. (2004) · Sociological Methodology · doi:10.1111/j.0081-1750.2004.00152.x · Cited by 1,981
Heckathorn, D. D. (2002) · Social Problems · doi:10.1525/sp.2002.49.1.11 · Cited by 1,882
Research works printed but not linked: 3
- Erridge, A. and Henningan, S. (2007), “Public procurement and social policy in Northern Ireland: the unemployment pilot project”, in Piga, G. and Thai, K.V. (Eds), Advancing Public Procurement: Practices, Innovation and Knowledge‐Sharing, PrAcademics Press, Boca Raton, FL, pp. 280‐303.
- Gershon, P. (2004), Releasing Resources to the Front Line: Independent Review of Public Sector Efficiency, HM Treasury, London.
- Tigner, B. (1991), “EC policy: opening the bidding”, International Management (Europe Edition), Vol. 46 No. 6, pp. 46‐9.
Cited by
Sorted by citations
Items 501–600 of 777
RONO, A. K., & Moronge, M. (2019) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v6i2.1105 · Cited by 3
Sourani, A., & Manewa, A. (2016) · doi:10.1007/978-1-137-34418-2_2 · Cited by 3
Emuze, F. A., & Awizie, B. (2016) · DOAJ (DOAJ: Directory of Open Access Journals) · doi:10.36615/jcpmi.v6isupplement.110 · Cited by 3
Regulating sustainable public procurement in Turkey in the context of the European Union membership
Kaya, M. B. (2014) · Nottingham ePrints (University of Nottingham) · Cited by 3
The relationship between sustainability and compliance in a procurement context
Mashele, F. (2016) · UpSpace Institutional Repository (University of Pretoria) · Cited by 3
E-procurement Implementation And Transaction Cost Among Non-governmental Organisations In Kenya
Owili, E. A. (2013) · University of Nairobi Research Archive (University of Nairobi) · Cited by 3
Nomir, M. (2021) · ERA: Education and Research Archive (University of Alberta) · doi:10.7939/r3-emmr-qx54 · Cited by 3
Procurement 4.0: A Systematic Review of Its Technological Evolution
Bueno, R. E., Almeida dos Santos, H., de Junior Freitas, M., Toloi, R. C., & Gonçalves, R. F. (2022) · IFIP Advances in Information and Communication Technology · doi:10.1007/978-3-031-16411-8_19 · Cited by 2
dos Santos, A. L. T., Scotelano, L. D. S., & Reis, A. D. C. (2024) · Revista Gestão & Sustentabilidade · doi:10.36661/2596-142x.2024v6n1.14361 · Cited by 3
Inglat, L. P. D. S., Cabral, V. N., de Castro, B. S., & Guerrieri, D. C. (2024) · Revista de Gestão Social e Ambiental · doi:10.24857/rgsa.v18n3-174 · Cited by 2
Radičić, D., & Jackson, I. (2025) · Business Strategy and the Environment · doi:10.1002/bse.70102 · Cited by 2
Scotelano, L. D. S., Gonçalves, A., & Boloy, R. A. M. (2025) · Journal of Public Procurement · doi:10.1108/jopp-03-2025-0020 · Cited by 2
Public Procurement Principles and Value for Money in Works
Agyekum, E., William, M. A., Appah, K. A., & Pokuaa-Duah, G. (2025) · African Journal of Management and Business Research · doi:10.62154/ajmbr.2025.020.01035 · Cited by 2
Susanty, A., Puspitasari, N. B., Pujotomo, D., Purwanggono, B., & Akbar, M. S. (2025) · Journal of Transport and Supply Chain Management · doi:10.4102/jtscm.v20i0.1218 · Cited by 2
Baloyi, S., & Ambe, I. M. (2026) · African Journal of Economic and Management Studies · doi:10.1108/ajems-04-2025-0278 · Cited by 2
Governing AI in sustainable public procurement: towards an ESG-oriented conceptual architecture
Sciarrone, A., & Calabrese, M. (2026) · VINE Journal of Information and Knowledge Management Systems · doi:10.1108/vjikms-07-2025-0309 · Cited by 2
External Ecosystem Resources and SME Sustainable Environmental Performance: Evidence from Ghana
Kankam-Kwarteng, C., Dzansi, D. Y., & Atiase, V. Y. (2026) · Businesses · doi:10.3390/businesses6020016 · Cited by 2
Green Public Procurement: A Critical Review of Fragmented Insights and an Integrated Research Agenda
Xi, C., Zhang, D., & Fang, T. (2026) · Journal of Economic Surveys · doi:10.1111/joes.70112 · Cited by 2
Navarra, D. D. (2026) · Sustainability · doi:10.3390/su18157882 · Cited by 2
Kaumbuthu, P., & Wanyoike, D. M. (2015) · Cited by 2
Salazar-Rojas, T., & Gamboa-Castro, J. J. (2021) · Revista Tecnología en Marcha · doi:10.18845/tm.v34i2.4897 · Cited by 2
A Reflection of Local Supplier Development towards Sustainable Social Supply Chain
Halili, M., & Fernando, Y. (2019) · KnE Social Sciences · doi:10.18502/kss.v3i22.5084 · Cited by 2
Rezende, E. C. M. D., & Moreira, M. F. (2021) · Gestão & Regionalidade · doi:10.13037/gr.vol37n112.6036 · Cited by 2
Government Procurement Policy: Comparative Study between Indonesia and The United States
Romadiyanti, B. (2022) · Jurnal Transformative · doi:10.21776/ub.transformative.2022.008.02.2 · Cited by 2
Work Integration Social Enterprises (WISEs) in Public Sector
Chronopoulos, V. I., Sepetis, A. K., & Pierrakos, G. (2024) · Springer proceedings in business and economics · doi:10.1007/978-3-031-51038-0_51 · Cited by 2
Euflausino, M. A., & de Mello, G. R. (2018) · Ciências sociais em perspectiva · doi:10.48075/revistacsp.v17i33.15047 · Cited by 2
MAALIM, I. K., & Moronge, M. (2018) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v5i4.887 · Cited by 2
Aderência aos critérios de sustentabilidade pelos órgãos federais no Estado de São Paulo
do Nascimento, J. O., Brandeburski, E. H., Zittei, M. V. M., & Lugoboni, L. F. (2018) · Revista de Ciências da Administração · doi:10.5007/2175-8077.2018v20nespp24 · Cited by 2
O ACESSO DOS PEQUENOS EMPREENDEDORES LOCAIS ÀS COMPRAS PÚBLICAS: UM ESTUDO NO IFRO
Chapuis, G. A. L., & Gomes, A. D. C. C. (2021) · Revista de Administração de Roraima - RARR · doi:10.18227/2237-8057rarr.v10i0.5643 · Cited by 2
Oyedokun, G. E., & Garba, M. A. (2022) · International Journal of Finance Research · doi:10.47747/ijfr.v3i4.876 · Cited by 2
Sambuichi, R. H. R., Paula, S. D. R., Perin, G., de Almeida, A. F. C. S., Gualdani, C., & Marques, F. J. (2022) · doi:10.38116/td2820 · Cited by 2
Silva, I. P. D., & da Conceição, R. D. P. (2024) · Revista de Gestão Social e Ambiental · doi:10.24857/rgsa.v18n2-051 · Cited by 3
UMUTONI, M., & Akumuntu, J. (2024) · Journal of Procurement & Supply Chain · doi:10.53819/81018102t7001 · Cited by 2
Jasni, N. S., & Kamarudin, S. N. (2024) · International Journal of Economics and Financial Issues · doi:10.32479/ijefi.16547 · Cited by 2
Sustainable ICT Procurement: Data-Driven Decision-Making in B2B Green ICT Adoption
Islam, M. A., Oyedeji, S., & Porras, J. (2025) · Lecture notes in business information processing · doi:10.1007/978-3-031-85849-9_19 · Cited by 2
Guerzoni, M., & Raiteri, E. (2013) · Cited by 2
Public Procurement in the Czech Republic
Novosák, J., Hájek, O., & Machů, J. (2012) · IGI Global eBooks · doi:10.4018/978-1-4666-2665-2.ch010 · Cited by 2
Thuo, C. W., & Njeru, A. W. (2014) · Cited by 2
Kivistö, T., & Virolainen, V.-M. (2016) · Public administration, governance and globalization · doi:10.1007/978-3-319-49280-3_5 · Cited by 2
Brun, L. C. (2018) · NCSU Libraries Repository (North Carolina State University Libraries) · Cited by 2
Applications of Blockchain Technology for a Circular Economy with Focus on Singapore
Rotabi, S., & Ali, O. (2021) · Environmental footprints and eco-design of products and processes · doi:10.1007/978-981-16-6301-7_8 · Cited by 2
CURRENT SUSTAINABLE PROCUREMENT PRACTICES IN PUBLIC FUNDED PROJECTS IN NORTHERN GHANA
(2022) · International Research Journal of Modernization in Engineering Technology and Science · doi:10.56726/irjmets29559 · Cited by 2
Adebayo, V. O. (2015) · World Congress on Sustainable Technologies · doi:10.1109/wcst.2015.7415121 · Cited by 2
Burchard‐Dziubińska, M. (2017) · Scientific Papers of Silesian University of Technology Organization and Management Series · doi:10.29119/1641-3466.2017.104.1 · Cited by 2
Njoroge, M. K., Kiarie, D., & Nyaboke, P. (2018) · Cited by 2
Social sustainability implementation in global supply chains
Huq, F. A. (2014) · Lancaster EPrints (Lancaster University) · Cited by 2
Healthcare Public-Private Partnerships and Infrastructural Supply Chain SustainabilityPreprint
Visconti, R. M. (2015) · SSRN Electronic Journal · doi:10.2139/ssrn.2684038 · Cited by 2
Public Procurement in 21st Century: Balancing Liberalisation, Social Values and ProtectionismPreprint
Górski, J. (2016) · SSRN Electronic Journal · doi:10.2139/ssrn.2818555 · Cited by 2
Optimal Discounts in Green Public ProcurementPreprint
Chiappinelli, O., & Seres, G. (2021) · SSRN Electronic Journal · doi:10.2139/ssrn.3964790 · Cited by 2
Optimal Discounts in Green Public ProcurementPreprint
Chiappinelli, O., & Seres, G. (2021) · SSRN Electronic Journal · doi:10.2139/ssrn.3984982 · Cited by 2
Sustainable Public Procurement: Concept and Principles
Freitas, J., & Villac, T. (2020) · Encyclopedia of the UN sustainable development goals · doi:10.1007/978-3-319-95726-5_106 · Cited by 2
European Funds and Green Public ProcurementPreprint
Nicolas, R., Titl, V., & Schotanus, F. (2023) · SSRN Electronic Journal · doi:10.2139/ssrn.4435468 · Cited by 2
da Costa, B. B. F., Diminic, A. L., Thompson, S. J. G. S., & HADDAD, A. N. (2022) · Informes de la Construcción · doi:10.3989/ic.89959 · Cited by 1
Петленко, Ю. В., Kharlamova, G., Giedraitis, V., Stavytskyy, A. V., & Ulvidienė, E. (2025) · Public and Municipal Finance · doi:10.21511/pmf.14(1).2025.06 · Cited by 1
Ndukwe, C. V., Chan, T., & Gao, S. (2025) · Journal of Public Procurement · doi:10.1108/jopp-07-2024-0076 · Cited by 1
Ferri, L., Iuorio, M., Maffei, M., & Meucci, F. (2025) · Corporate Social Responsibility and Environmental Management · doi:10.1002/csr.70244 · Cited by 1
Impact article: how do we reduce domestic servitude risk in the developed world?
Emberson, C. (2026) · Supply Chain Management An International Journal · doi:10.1108/scm-06-2025-0575 · Cited by 1
From Contract Management to Societal Value Creation: A Public Procurement Portfolio Model
Patrucco, P. P., Wu, Z., Handfield, R., Finkenstadt, D. J., & Hatton, L. (2026) · Journal of Supply Chain Management · doi:10.1111/jscm.70025 · Cited by 1
Chmet, F., Calandra, D., & Biancone, P. (2026) · CSR, sustainability, ethics & governance · doi:10.1007/978-3-032-16077-5_27 · Cited by 1
Wahab, A. B., & Taiwo, A. (2021) · Journal of Environmental Science and Sustainable Development · doi:10.7454/jessd.v4i2.1058 · Cited by 1
Silva, A. M. M., & Gomes, J. M. A. (2022) · Emancipacao · doi:10.5212/emancipacao.v.22.2214866.014 · Cited by 1
Khuan, H. (2024) · Economics Studies and Banking Journal (DEMAND) · doi:10.62207/838ea303 · Cited by 1
From brown to green: repurposing public procurement
Dimand, A., & Neshkova, M. I. (2024) · Edward Elgar Publishing eBooks · doi:10.4337/9781803929170.00035 · Cited by 1
Hamiza, O., & Rulangaranga, D. M. (2025) · World Journal of Advanced Research and Reviews · doi:10.30574/wjarr.2025.26.1.0852 · Cited by 1
IMPACT OF PRACTICAL CONSTRAINTS ON PROMOTING THE SUSTAINABILITY OF MOROCCAN PUBLIC PROCUREMENT
Said (2022) · Public Policy And Administration · doi:10.13165/vpa-25-24-2-11 · Cited by 1
Fitriyanto, A. D., & Mulyono, M. (2025) · IGI Global eBooks · doi:10.4018/979-8-3373-1300-9.ch014 · Cited by 1
Ograh, T., Ayarkwa, J., & Acheampong, A. (2025) · The International Journal of Logistics Management · doi:10.1108/ijlm-01-2025-0013 · Cited by 1
Opoku-Mensah, F. A., Ahenkan, A., Temesgen, B., & Maloreh‐Nyamekye, T. (2025) · Cost Effectiveness and Resource Allocation · doi:10.1186/s12962-025-00686-w · Cited by 1
Formal Harmonisation, Informal Divergence: Administrative Culture in European Public Procurement
Hatamian, E. (2025) · Business & Management Compass · doi:10.56065/kq2wma16 · Cited by 1
Kuruneri, J., Obadire, A. M., Dube, M., & Zvivanai, W. M. (2026) · Modern Supply Chain Research and Applications · doi:10.1108/mscra-06-2024-0022 · Cited by 1
Bunescu, L., & Șerban, A. (2025) · Studies in Business and Economics · doi:10.2478/sbe-2025-0045 · Cited by 1
Creating a green culture in procurement: the influence of social norms
Ograh, T., Ograh, F., Boakye, H. M., Obeng, F., & Brako, S. (2026) · Strategy and Leadership · doi:10.1108/sl-10-2025-0349 · Cited by 1
Markedseffekt av miljøkrav i offentlige anskaffelser
Arve, M., & Greaker, M. (2026) · doi:10.23865/cdf.264.ch3 · Cited by 1
Aspects of Public Procurement Law Reforms: The Cases of the United Arab Emirates and Saudi Arabia
Aboelazm, K. S., AlFil, N. Z., & Ramadhan, F. (2026) · Journal of Law and Legal Reform · doi:10.15294/jllr.v7i2.17132 · Cited by 1
FinTech and green public procurement (GPP) in Europe: driving sustainability forward
Özcan, B., & Taş, B. K. O. (2026) · Financial Innovation · doi:10.1186/s40854-026-00937-6 · Cited by 1
Ali, S. S., Alqalayta, D., Baajajah, S., Qutub, S., & Alzahrani, A. (2026) · Journal of Modelling in Management · doi:10.1108/jm2-09-2025-0524 · Cited by 1
Zheng, R., Xu, Q., & Yang, F. (2026) · International Journal of Operations & Production Management · doi:10.1108/ijopm-09-2025-0925 · Cited by 1
Nemec, P., Jurčišinová, V., & Mráz, A. (2026) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2026.148765 · Cited by 1
Inglat, L. P. D. S., Cabral, V. N., & Guerrieri, D. C. (2026) · Gestão & Produção · doi:10.1590/1806-9649-2026v33e10725 · Cited by 1
Political gatekeeping and digital innovation in sustainable public procurement
Darnall, N., Singh, A., Stritch, J. M., & Behravesh, S.-A. (2026) · Frontiers in Sustainability · doi:10.3389/frsus.2026.1861452 · Cited by 1
Rethinking public procurement: toward a mission-oriented framework
Mazzucato, M., & Spanó, E. (2026) · Policy Design and Practice · doi:10.1080/25741292.2026.2727725 · Cited by 1
Incorporación de valor social a la contratación pública en España: Situación y perspectivas
García, M. S., Navío-Marco, J., & Comeche, R. C. (2016) · Revista de Estudios de la Administración Local y Autonómica · doi:10.24965/reala.v0i4.10306 · Cited by 1
Public procurement: A public policy tool for resources management
Lee, H. (2016) · Scholedge International Journal of Business Policy & Governance · doi:10.19085/journal.sijbpg030202 · Cited by 1
Bismarchi, L. F., Villac, T., & dos Santos, M. C. L. (2017) · World Environmental and Water Resources Congress (EWRI) · doi:10.1061/9780784480618.022 · Cited by 1
BIYOGO, F. K., & MIROGA, D. J. (2018) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v5i4.1000 · Cited by 1
Blank, F., Broens, M. G., Fischer, J., & Bogaschewsky, R. (2019) · Springer eBooks · doi:10.1007/978-3-658-25188-8_7 · Cited by 1
BUHERE, I. O., & MUKANZI, D. C. (2019) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v6i1.1089 · Cited by 1
INFLUENCE OF PROCUREMENT PRACTICES ON PROCUREMENT FUNCTIONS IN STATE CORPORATIONS IN KENYA
OLICK, B. B. O., & Moronge, M. (2019) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v6i2.1237 · Cited by 1
SHILUNGU, M. M., & MIROGA, D. J. (2019) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v6i4.1413 · Cited by 1
Gupta, V., & Jayant, A. (2020) · Lecture notes in mechanical engineering · doi:10.1007/978-981-15-8704-7_4 · Cited by 1
Marita, L., Safrizal, H. B. A., Andriani, N. L. A. D., & Masrurotin, M. (2022) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1105/1/012017 · Cited by 1
Brief Overview of Sustainable Public Procurement
Kumar, S. (2022) · Public administration, governance and globalization · doi:10.1007/978-3-031-08258-0_1 · Cited by 1
Oliveira, A. D. A., Borba, E. R. B., Martins, J. A. D. L., da Costa, W. J. F., de Paulo, F. L. L., Xavier, M. G. P., & Albuquerque, J. D. L. (2024) · Revista de Gestão e Secretariado (Management and Administrative Professional Review) · doi:10.7769/gesec.v15i1.3373 · Cited by 1
Innovation and Tariff-adjustment Options in Public-private Partnerships
excedencia), U. C. D. M. (., Contreras, C., Angulo, J., & Independiente (2022) · Revista Hacienda Pública Española · doi:10.7866/hpe-rpe.22.4.3 · Cited by 1
Assessment Approaches and Methods for a Circular Economy
Raggi, A., Droege, H., Opferkuch, K., Lindgreen, E. R., Walker, A. M., Caeiro, S., Ramos, T. B., & Salomone, R. (2024) · Routledge eBooks · doi:10.4324/9781003295631-5 · Cited by 1
Ditahardiyani, P., Indrianingsih, A. W., Darsih, C., & Lestari, D. W. (2025) · Sustainable textiles · doi:10.1007/978-3-031-80240-9_6 · Cited by 2
Hamiza, O., Rulangaranga, D. M., Musa, M., & Isoh, A. V. N. (2025) · Archives of Business Research · doi:10.14738/abr.133.18459 · Cited by 1
La transformación de la contratación administrativa a partir de 2024 a raíz de la sostenibilidad
Quezada, F. (2025) · Revista de Derecho Administrativo Económico · doi:10.7764/redad.41.6 · Cited by 1
Kyeremeh, E. (2025) · Strategy and Leadership · doi:10.1108/sl-09-2025-0307 · Cited by 1
The Contribution of Green Public Procurement to Energy Efficiency Governance in Buildings
Annunziata, E., Testa, F., Frey, M., & Iraldo, F. (2014) · Dialnet (Universidad de la Rioja) · doi:10.1057/9781137430649_2 · Cited by 1
Metadata
- Authors
- Brammer, S., & Walker, H.
- Affiliations
- University of Warwick (GB)
- Cardiff University (GB)
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2011-03-22
- Volume
- 31
- Issue
- 4
- Pages
- 452-476
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W2041478216
- Cited by
- 731
- References
- 70
- Citations by year
- 2026: 50 · 2025: 53 · 2024: 52 · 2023: 60 · 2022: 68 · 2021: 78 · 2020: 65 · 2019: 52 · 2018: 58 · 2017: 49 · 2016: 39 · 2015: 47 · 2014: 30 · 2013: 17 · 2012: 7
- FWCI
- 62.20
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Operations & Production Management (publishedVersion)
- University of Birmingham Research Portal (University of Birmingham) (submittedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public Procurement and Policy
- Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
- Social Sciences › Business, Management and Accounting › Marketing › Environmental Sustainability in Business
- Keywords
- sustainable procurement, public procurement, barriers and facilitators, sustainability policy implementation, cross-national comparison, environmental footprint, social sustainability, procurement policy
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.