Design of Performance Measures for Time‐based Companies
The DOI matches its Crossref record.
Abstract
An increasing number of firms are planning to become “time‐based companies”, that is to consider time as the main issue of their manufacturing strategy. However, such change in attitude, in order to be effective, must be supported by a performance measurement system focused on time. This article suggests a framework useful for designing a performance measurement system which is consistent with time‐based principles and can support managers both in strategic and in operating decisions. The framework takes into account the different ways through which a company can use time to create a competitive advantage and considers the main activities that are critical for achieving such results. Hence, a “minimum set of measures”, consistent with the information requirements of each company, is determined.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Performance measurement system design: A literature review and research agenda
Neely, A., Gregory, M., & Platts, K. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510083622 · Cited by 3,259
“On an alternative tack, an interesting approach to the design of time-based performance measures is proposed by Azzone et al. (1991)”
MethodDesigning, Implementing and Updating Performance Measurement Systems
Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010330739 · Cited by 1,143
“Mintzberg, 1982; Globerson, 1985; Sink, 1986; Fortuin, 1988; Keegan et al., 1989; Dixon et al., 1990; Bitton, 1990; Lynch and Cross, 1991; Maskell, 1989; Azzone et al., 1991; Wisner and Fawcett, 1991; Goold, 1991; Kaplan and Norton, 1992) and the literature is dominated by processes which answer the question ‘‘what sh…”
BackgroundPerformance measurement system design: developing and testing a process‐based approach
Neely, A., Mills, J., Platts, K., Richards, H., Gregory, M., Bourne, M., & Kennerley, M. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010343708 · Cited by 922
The changing basis of performance measurement
Ghalayini, A. M., & Noble, J. S. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610125787 · Cited by 676
Droge, C., Jayaram, J., & Vickery, S. K. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2004.08.001 · Cited by 660
Designing performance measures: a structured approach
Neely, A., Richards, H., Mills, J., Platts, K., & Bourne, M. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710177888 · Cited by 599
A review of performance measurement: Towards performance management
Folan, P., & Browne, J. (2005) · Computers in Industry · doi:10.1016/j.compind.2005.03.001 · Cited by 496
Implementing performance measurement systems: a literature review
Bourne, M., Neely, A., Mills, J., & Platts, K. (2003) · International Journal of Business Performance Management · doi:10.1504/ijbpm.2003.002097 · Cited by 480
Manufacturing strategy: Literature review and some issues
Dangayach, G. S., & Deshmukh, S. G. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110393414 · Cited by 469
Performance Measurement in Construction
Bassioni, H. A., Price, A. D. F., & Hassan, T. M. (2004) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2004)20:2(42 · Cited by 383
Evaluation and improvement of manufacturing performance measurement systems ‐ the role of OEE
Jonsson, P., & Lesshammar, M. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910244223 · Cited by 308
A survey and taxonomy of strategy‐related performance measures for manufacturing
White, G. P. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610110486 · Cited by 265
Interplay between performance measurement and management, employee engagement and performance
Smith, M., & Bititci, U. S. (2017) · International Journal of Operations & Production Management · doi:10.1108/ijopm-06-2015-0313 · Cited by 201
“This highlights a new area for investigation not previously addressed in existing performance measurement system design guidelines (Azzone et al., 1991; Neely et al., 2000).”
BackgroundIs production and operations management a discipline? A citation/co‐citation study
Pilkington, A., & Liston‐Heyes, C. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910244188 · Cited by 188
Developing environmental supply chain performance measures
Shaw, S., Grant, D. B., & Mangan, J. (2010) · Benchmarking: An International Journal · doi:10.1108/14635771011049326 · Cited by 174
Local strategic networks in the software industry: an empirical analysis of the value continuum
Hock, M., & Ringle, C. M. (2010) · International Journal of Knowledge Management Studies · doi:10.1504/ijkms.2010.030789 · Cited by 164
“In summary, an ‘acceleration of research and development processes’, ‘more timely consideration of customers’ requirements’ and/or ‘faster and more flexible reaction to changed terms of competition’ are considered key manifestations of the time advantages in local strategic alliances (Azzone et al., 1991).”
BackgroundA methodology for assessing time‐based competitive advantage of manufacturing firms
Kumar, A., & Motwani, J. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510080409 · Cited by 162
“[7] Theory building 3 Discussion Suggests a model for selecting effective set of measures for time-based companies”
BackgroundInfluentialMorioka, S. N., & Carvalho, M. M. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.01.103 · Cited by 138
Metadata
- Authors
- Azzone, G., Masella, C., & Bertelè, U.
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 1991-03-01
- Volume
- 11
- Issue
- 3
- Pages
- 77-85
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W2042710320
- Cited by
- 134
- References
- 0
- FWCI
- 0.00
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.