Relationship between TQM and TPM implementation factors and business performance of manufacturing industry in Indian context
The DOI matches its Crossref record; 33 of the 33 references it cites were found in a registry or an index.
Abstract
Abstract Purpose – To study the strategic implications of TQM and TPM in an Indian manufacturing set‐up and to detail literature reviews to highlight gap areas. To examine the relationship between factors influencing the implementation of TQM and TPM and business performance for the following three approaches in an Indian context: TQM alone; TPM alone; both TQM and TPM together. This is done to extract significant factors for the above three approaches. Design/methodology/approach – Empirical survey‐based research on a sample size of 108 manufacturing companies. Uses bivariate correlation and multiple regression analysis techniques to extract significant factors using SPSS. Findings – The research identifies two sets of factors which are critical for the effectiveness of TQM and TPM: universally significant factors for all the three approaches like leadership, process management and strategic planning; and approach‐specific factors like equipment management and focus on customer satisfaction. The study also highlights the complexities involved in implementing TQM and TPM together. Practical implications – The emphasis on extracted factors will help companies in realizing greater benefits through TQM and TPM. This study is equally important in a global context also, as companies across the globe are striving to achieve synergy of TQM and TPM. Originality/value – The preparedness/status of Indian manufacturing industry for TQM and TPM implementation, as India is becoming a major sourcing base for the world and there is a paucity of such studies. The study of TQM and TPM in all the three modes simultaneously has not been investigated in the context of developing countries. Such studies are equally important in a global context.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Multivariate Data Analysis with Readings.
Rutherford, G. S. W., Hair, J. F., Anderson, R. E., & Tatham, R. L. (1988) · The Statistician · doi:10.2307/2348783 · Cited by 5,830
Multivariate Data Analysis with Readings.
Jolliffe, I. T., Hair, J. F., Anderson, R. E., & Tatham, R. L. (1988) · Journal of the Royal Statistical Society. Series A (Statistics in Society) · doi:10.2307/2983017 · Cited by 5,077 · cited 1×
“In order to reduce this effect one or more factors with high correlation values have been omitted from regression analysis ( Hair et al. , 1992”
An Instrument for Measuring the Critical Factors of Quality Management
Saraph, J. V., Benson, P. G., & Schroeder, R. G. (1989) · Decision Sciences · doi:10.1111/j.1540-5915.1989.tb01421.x · Cited by 2,030 · cited 1×
“These include development of research frameworks to study the effects of TQM on business performance ( Saraph et al. , 1989”
A framework for quality management research and an associated measurement instrument
Flynn, B. B., Schroeder, R. G., & Sakakibara, S. (1994) · Journal of Operations Management · doi:10.1016/s0272-6963(97)90004-8 · Cited by 1,966
Feigenbaum, A. V. (1961) · Cited by 1,551
Identification of the Critical Factors of TQM*
Black, S. A., & Porter, L. J. (1996) · Decision Sciences · doi:10.1111/j.1540-5915.1996.tb00841.x · Cited by 1,021
A THEORY OF QUALITY MANAGEMENT UNDERLYING THE DEMING MANAGEMENT METHOD
Anderson, J. C., Rungtusanatham, M. J., & Schroeder, R. G. (1994) · Academy of Management Review · doi:10.5465/amr.1994.9412271808 · Cited by 971
Firm characteristics, total quality management, and financial performance
Hendricks, K. B., & Singhal, V. R. (2001) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00049-8 · Cited by 678
The TQM Paradox: Relations among TQM practices, plant performance, and customer satisfaction
Choi, T. Y., & Eboch, K. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00031-x · Cited by 543 · cited 1×
“Though such studies have been carried out in other countries for TQM ( Choi and Eboch, 1998”
BackgroundStrategic dimensions of maintenance management
Tsang, A. H. C. (2002) · Journal of Quality in Maintenance Engineering · doi:10.1108/13552510210420577 · Cited by 467 · cited 1×
“), identification of critical factors ( Tsang, 2002”
BackgroundSila, I., & Ebrahimpour, M. (2002) · International Journal of Quality & Reliability Management · doi:10.1108/02656710210434801 · Cited by 441 · cited 1×
“A large number of studies are available on relationship between TQM practices and business performance ( Ismail and Ebrahimpour, 2002”
BackgroundAn instrument for measuring TQM implementation for Chinese manufacturing companies
Zhang, Z., Waszink, A., & Wijngaard, J. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010315247 · Cited by 396 · cited 1×
“Internal consistency reliability is the most commonly used psychometric measures in assessing survey instrument and scales ( Zhang et al. , 2000”
MethodHow the Baldrige Award really works.
Garvin, D. A. (1992) · PubMed · Cited by 386
Quality Planning and Analysis: From Product Development Through Usage
Juran, J. M., & Gryna, F. M. (1982) · Medical Entomology and Zoology · Cited by 318
Ziegel, E. R., & Fergenbaum, A. (1992) · Technometrics · doi:10.2307/1270069 · Cited by 296
Leonard, F. (1982) · Harvard business review · Cited by 291
Total productive maintenance: a contextual view
McKone, K. E., Schroeder, R. G., & Cua, K. O. (1999) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00039-4 · Cited by 267 · cited 1×
“However, this aspect is not researched in detail except for few studies ( McKone et al. , 1999”
BackgroundTOTAL QUALITY MANAGEMENT: A LITERATURE REVIEW AND AN AGENDA FOR FUTURE RESEARCH
Ahire, S. L., Landeros, R., & Golhar, D. Y. (1995) · Production and Operations Management · doi:10.1111/j.1937-5956.1995.tb00057.x · Cited by 248
The contribution of quality to business performance
Forker, L. B., Vickery, S. K., & Droge, C. L. M. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610125778 · Cited by 219 · cited 1×
“Similar studies were also carried out in different national frameworks ( Forker, 1996”
Result(2011) · SpringerReference · doi:10.1007/springerreference_27175 · Cited by 197
Bamber, C. J., Sharp, J. M., & Hides, M. T. (1999) · Journal of Quality in Maintenance Engineering · doi:10.1108/13552519910282601 · Cited by 195
Quality performance and organizational culture: A New Zealand study
Corbett, L. M., & Rastrick, K. N. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010300126 · Cited by 190
A study of total productive maintenance implementation
Ireland, F., & Dale, B. G. (2001) · Journal of Quality in Maintenance Engineering · doi:10.1108/13552510110404495 · Cited by 179 · cited 1×
“These studies are related to the benchmarking of implementation practices to explore key areas ( Ireland and Dale, 2001”
BackgroundImplementing TPM in plant maintenance: some organisational barriers
Lee Cooke, F. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010378789 · Cited by 171
Challenge to world‐class manufacturing
YAMASHINA, H. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010304546 · Cited by 162
Implementing TPM: The North American Experience
Robinson, C. J., & Ginder, A. P. (1995) · Medical Entomology and Zoology · Cited by 131
Suzuki, T. (2017) · Routledge eBooks · doi:10.1201/9780203735312 · Cited by 129
TPM implementation in China: a case study
Tsang, A., & Chan, P. K. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010304555 · Cited by 114
TPM Implementation: A Japanese Approach
Tajiri, M. (1992) · Cited by 88
Competitiveness of Indian Manufacturing: Findings of the 1997 Manufacturing Futures Survey
Chandra, P., & Sastry, T. (1998) · Vikalpa: The Journal for Decision Makers · doi:10.1177/0256090919980304 · Cited by 78
You may need RCM to enhance TPM implementation
Ben‐Daya, M. (2000) · Journal of Quality in Maintenance Engineering · doi:10.1108/13552510010328086 · Cited by 66
A regional study of quality management infrastructure practices in USA and Mexico
Solís, L. E., Raghunathan, T. S., & Rao, S. S. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010336749 · Cited by 52
Prabhu, V. B., & Robson, A. J. (2000) · Total Quality Management · doi:10.1080/09544120050007706 · Cited by 24
Cited by
Total productive maintenance: literature review and directions
Ahuja, I. P. S., & Khamba, J. S. (2008) · International Journal of Quality & Reliability Management · doi:10.1108/02656710810890890 · Cited by 574
Kaplan, H. C., Provost, L. P., Froehle, C. M., & Margolis, P. A. (2012) · BMJ Quality & Safety · doi:10.1136/bmjqs-2011-000010 · Cited by 572
Critical success factors for TQM implementation and their impact on performance of SMEs
Ismail Salaheldin, S. (2009) · International Journal of Productivity and Performance Management · doi:10.1108/17410400910938832 · Cited by 386
Total productive maintenance (TPM) implementation practice: A literature review and directions
Jain, A., Bhatti, R., & Singh, H. (2014) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-06-2013-0032 · Cited by 148
Metadata
- Authors
- Seth, D., & Tripathi, D.
- Venue
- International Journal of Quality & Reliability Management
- Publisher
- Emerald
- Published
- 2005-04
- Volume
- 22
- Issue
- 3
- Pages
- 256-277
- ISSN
- 0265-671X (ISSN-L)
- OpenAlex
- W2068809181
- Cited by
- 162
- References
- 33
- FWCI
- 11.17
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.