Abstract
Purpose In the past decades, artificial intelligence (AI)-based hybrid methods have been increasingly applied in construction risk management practices. The purpose of this paper is to review and compile the current AI methods used for cost-risk assessment in the construction management domain in order to capture complexity and risk interdependencies under high uncertainty. Design/methodology/approach This paper makes a content analysis, based on a comprehensive literature review of articles published in high-quality journals from the years 2008 to 2018. Fuzzy hybrid methods, such as fuzzy-analytical network processing, fuzzy-artificial neural network and fuzzy-simulation, have been widely used and dominated in the literature due to their ability to measure the complexity and uncertainty of the system. Findings The findings of this review article suggest that due to the limitation of subjective risk data and complex computation, the applications of these AI methods are limited in order to address cost overrun issues under high uncertainty. It is suggested that a hybrid approach of fuzzy logic and extended form of Bayesian belief network (BBN) can be applied in cost-risk assessment to better capture complexity-risk interdependencies under uncertainty. Research limitations/implications This study only focuses on the subjective risk assessment methods applied in construction management to overcome cost overrun problem. Therefore, future research can be extended to interpret the input data required to deal with uncertainties, rather than relying solely on subjective judgments in risk assessment analysis. Practical implications These results may assist in the management of cost overrun while addressing complexity and uncertainty to avoid chaos in a project. In addition, project managers, experts and practitioners should address the interrelationship between key complexity and risk factors in order to plan risk impact on project cost. The proposed hybrid method of fuzzy logic and BBN can better support the management implications in recent construction risk management practice. Originality/value This study addresses the applications of AI-based methods in complex construction projects. A proposed hybrid approach could better address the complexity-risk interdependencies which increase cost uncertainty in project.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“One of the limitations of SEM is that it does not assume the uncertainty and stochastic behavior of events [34]; therefore, it has limited applications for complex projects under high uncertainty [1].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [1]
Citations
Cites
Application of the AHP in project management
Al‐Harbi, K. M. A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,141
Overview on Bayesian networks applications for dependability, risk analysis and maintenance areas
Weber, P., Medina-Oliva, G., Simon, C., & Iung, B. (2010) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2010.06.002 · Cited by 769
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Parn, E. A., & Edwards, D. J. (2018) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 732
What Causes Cost Overrun in Transport Infrastructure Projects?
Flyvbjerg, B., Holm, M. S., & Buhl, S. L. (2004) · Transport Reviews · doi:10.1080/0144164032000080494a · Cited by 649
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 579
Criteria in AHP: A Systematic Review of Literature
Russo, R. D. F. S. M., & Camanho, R. (2015) · Procedia Computer Science · doi:10.1016/j.procs.2015.07.081 · Cited by 536
A review of application of multi-criteria decision making methods in construction
Jato‐Espino, D., López, E. C., Rodríguez-Hernández, J., & Canteras-Jordana, J. C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.013 · Cited by 512
Quantitative risk analysis of offshore drilling operations: A Bayesian approach
Khakzad, N., Khan, F. I., & Amyotte, P. R. (2013) · Safety Science · doi:10.1016/j.ssci.2013.01.022 · Cited by 403
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Using fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, İ., Birgönül, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 376
Research works printed but not linked: 7
- 2013, Managing the Continuum: Certainty, Uncertainty, Unpredictability in Large Engineering Projects
- 2016, Managing Complex, High Risk Projects
- 2013, Decision Making with the Analytic Network Process
- 2015, Risk analysis at the edge of chaos, Cost Engineering, 57, 28
- 2016, Risk and stakeholder management tools, Project Management ToolBox, 182, 351
- 2014, Risk Management for Engineering Projects
- 2003, The Analytic Hierarchy Process (AHP) for Decision Making and the Analytic Network Process (ANP) for Decision Making with Dependence and Feedback, Creative Decisions Foundation
Cited by
Sorted by citations
Items 101–172 of 172
A Hybrid Decision Support System for Holistic Evaluation of Material Alternatives
Abdelkader, E. M. (2021) · International Journal of Strategic Decision Sciences · doi:10.4018/ijsds.2021010102 · Cited by 2
Risk Management for Housing and Construction Projects
Yang, J., & Yin, S. (2023) · Journal of Engineering Project and Production Management · doi:10.32738/jeppm-2024-0011 · Cited by 2
Wu, Q., Xue, M., & Lu, B. (2025) · Journal of Current Social Issues Studies · doi:10.71113/jcsis.v2i5.263 · Cited by 3
Regona, M. (2022) · Queensland University of Technology · doi:10.5204/thesis.eprints.232514 · Cited by 2
Study on the Factors Affecting Construction Project Cost Overrun
Wu, Q., Khatibi, A., & Tham, J. (2025) · International Journal of Global Economics and Management · doi:10.62051/ijgem.v6n1.07 · Cited by 1
Kussumardianadewi, B. D., Latief, Y., Rarasati, A. D., Akhyari, M. A., & Faizurrahman, M. (2025) · Mechanical Engineering, Science and Technology International Conference (MEST) · doi:10.3390/engproc2025084074 · Cited by 1
Köksal, A., & Maraş, S. E. (2025) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2025.2474822 · Cited by 1
Dong, S., & Li, A. (2025) · Intelligent Decision Technologies · doi:10.1177/18724981251325923 · Cited by 1
Aldmour, R. (2025) · Journal of Lifestyle and SDGs Review · doi:10.47172/2965-730x.sdgsreview.v5.n05.pe06197 · Cited by 1
Turkyilmaz, A. H., & Polat, G. (2025) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2025-0161 · Cited by 1
AI-Enabled Multi-Project Governance: A Proposed Framework
Aliaga, E. H. A., Mariani, C., & Mancini, M. (2025) · Lecture notes in civil engineering · doi:10.1007/978-3-031-92797-3_3 · Cited by 1
Designing Support for Systematic Sociotechnical Risk Literacy
Walker, A. M., Shelby, R. M., Schlesinger, A., Tseng, E., Díaz, M., Ricci, A. E., & Smith, A. D. R. (2025) · Decennial Aarhus Conference · doi:10.1145/3737609.3747101 · Cited by 1
The impact of artificial intelligence on the quantity surveying profession in Sarawak, Malaysia
Toh, S. C. L., Wong, S. Y., & Ding, C. S. (2025) · Journal of Engineering Design and Technology · doi:10.1108/jedt-06-2025-0272 · Cited by 5
Lu, Q., Qin, W., & Yu-dong, Y. (2026) · Journal of Business and Industrial Marketing · doi:10.1108/jbim-04-2025-0318 · Cited by 2
Adaptive Estimation and Management of Cost Contingencies in EPC Projects
Alhashedi, E., Zhang, H., & Lin, Y. (2026) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-17879 · Cited by 1
Quantitative risk prioritization. A new risk-based approach to prioritize project risks
Acebes, F., González-Varona, J. M., López‐Paredes, A., & Pajares, J. (2026) · Annals of Operations Research · doi:10.1007/s10479-026-07252-4 · Cited by 1
Hazır, Ö., Avcioglu, K., Narbaev, T., Köse, T., & Kozhakhmetova, A. (2026) · Business Process Management Journal · doi:10.1108/bpmj-10-2025-1592 · Cited by 1
Ma, T. (2025) · Decision Making Applications in Management and Engineering · doi:10.31181/dmame8120251489 · Cited by 1
Adebayo, B. O., & Olatunde, N. A. (2022) · FUOYE Journal of Engineering and Technology · doi:10.46792/fuoyejet.v7i4.953 · Cited by 1
Richardson, T. M., Marion, J. W., Jr., & Vigness, R. M. (2022) · International Journal of Aviation Aeronautics and Aerospace · doi:10.58940/2374-6793.1743 · Cited by 1
Yusuf, M., & Latief, Y. (2024) · AIP conference proceedings · doi:10.1063/5.0235617 · Cited by 1
Shokrizadeh, J., & shokrizadeh, Z. (2023) · SSRN Electronic Journal · doi:10.2139/ssrn.4671256 · Cited by 1
Fuzzy-Based Factor Evaluation System for Momentum Overweight Trading Strategy
Chao, C.-F., Wu, M., & Hsieh, M. (2023) · Lecture notes in computer science · doi:10.1007/978-981-99-5834-4_14
Perbandingan Rencana Anggaran Biaya Kontraktor Lokal Terhadap Metode AHSP dan BOW
Wismantara, I. G. N. N., & Riana, I. N. (2023) · Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri · doi:10.24014/jti.v9i2.24772
Karan, S., & Prabakaran, P. A. (2024) · International Journal of Research Publication and Reviews · doi:10.55248/gengpi.5.0224.0569
Artificial Intelligence in the Effective Execution Process of Construction Projects in the Future
Shakibaei, R. (2024) · Journal of Economics Management and Trade · doi:10.9734/jemt/2024/v30i61215
Kelemu, M. T., Rotimi, J. O. B., & Samarasinghe, D. A. S. (2024) · Lecture notes in mechanical engineering · doi:10.1007/978-3-031-56878-7_17
Role of Artificial Intelligence in Construction Project Management
-, S. M., -, A. D. R., -, A. S. R., -, J. Y., & -, A. L. (2024) · International Journal For Multidisciplinary Research · doi:10.36948/ijfmr.2024.v06i06.32064
AI for Construction Risk Management
Cecconi, F. R., Khodabakhshian, A., & Rampini, L. (2025) · SpringerBriefs in applied sciences and technology · doi:10.1007/978-3-031-77197-2_4
Razia, B. S. (2024) · Contributions to finance and accounting · doi:10.1007/978-3-031-75960-4_12
Unpacking the Influence of Risk Management Culture within the Built Environment Projects
Sithole, B., & Ngwenya, C. T. S. (2025) · International Journal of Applied Research in Business and Management · doi:10.51137/wrp.ijarbm.2025.msut.45698
Tsopa, V. A., Shavarskyi, I., Koriashkina, L., Cheberiachko, L., Vakal, Y. S., & Літвінова, Я. В. (2025) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1457/1/012009
Gan, J. (2025) · International Conference on Integrated Circuits and Communication Systems (ICICACS) · doi:10.1109/icicacs65178.2025.10968215
Student Experience with AI-Assisted Situational Analysis in Construction Management
Daggubati, S. C. (2025) · Springer eBooks · doi:10.1007/978-981-96-6001-8_5
Review of Applied Science and TechnologyPreprint
RAHMAN, M. A. (2025) · SSRN Electronic Journal · doi:10.2139/ssrn.5360313
Review of Applied Science and TechnologyPreprint
Nuruzzaman, M. (2025) · SSRN Electronic Journal · doi:10.2139/ssrn.5371694 · Cited by 1
Disturbance Propagation in Smart Construction Sites: A Framework and Simulation-Based Approach
Attajer, A., & Mecheri, B. (2025) · Communications in computer and information science · doi:10.1007/978-3-032-06075-4_5
Gyadu-Asiedu, N. A. A., Aigbavboa, C. O., & David, M. M. (2025) · Lecture notes in networks and systems · doi:10.1007/978-3-032-07992-3_16
Resilient Smart Construction Sites: A Simulation-Based Analysis of Material Flow Disruptions
Attajer, A., & Mecheri, B. (2025) · Communications in computer and information science · doi:10.1007/978-3-032-08614-3_7
Stakeholder engagement in crisis communication: Toward a conceptual ecosystem framework
al ajmi, B., & Al‐Suqri, M. N. (2026) · Social Sciences & Humanities Open · doi:10.1016/j.ssaho.2026.103005
Movahedi, A., Noori, S., & Bagherpour, M. (2025) · International Journal of Construction Education and Research · doi:10.1080/15578771.2025.2598560
Transnational Construction Project Risk Factors and Their Impact Pathways
Yao, Q., & Lan, L. (2025) · Buildings · doi:10.3390/buildings15244526
Risk Reduction In Construction Projects Through Datadriven Technology: A Literature Review
Chandramohan, A. (2025) · i-manager’s Journal on Civil Engineering · doi:10.26634/jce.15.3.22259
Survey and Benchmarking of Carbon Tracking Tools for AI WorkloadsPreprint
Riam, S. Z., Arnold, I., Mooney, K., Haq, S., Uppaluru, H., Gong, N., & Wang, J. (2026) · SSRN Electronic Journal · doi:10.2139/ssrn.6104448
Narkhede, M. M., & Chaudhari, D. R. S. (2026) · Asian Journal of Civil Engineering · doi:10.1007/s42107-026-01641-7
Aligning Talent Management with Projects: Oriented Behavior Approach
Cihan, E. E. (2025) · Emerald Group Publishing Limited eBooks · doi:10.1108/978-1-83662-906-120251007
A Methodological Approach for Risk Assessment of Municipal Water Supply Projects
Gracia, M. D., Mar-Ortiz, J., Luna‐Domínguez, C. R., & Pérez, J. P. (2026) · Mathematics · doi:10.3390/math14050890
Risk-and-resilience-informed framework for schedule contingency estimation in EPC projects
Alhashedi, E., Zhang, W., & Zhang, H. (2026) · Engineering Construction & Architectural Management · doi:10.1108/ecam-11-2025-1819
AI-driven project management: Identifying use cases
Hewing, M., Feldmann, C., & Schierbaum, J. (2026) · Procedia Computer Science · doi:10.1016/j.procs.2026.03.135
A Systematic Review of Current Risk Assessment Practices in Construction Projects
Ambrose, M., Darmansah, N. F., & Baddiri, A. (2026) · International Journal of Latest Technology in Engineering Management & Applied Science · doi:10.51583/ijltemas.2026.150300017
Ahmed, R., & Naveed, R. (2026) · SSRN Electronic Journal · doi:10.2139/ssrn.6604904
Ragin-Skorecka, K., Banach, M., Motała, D., & Krugiełka, A. (2026) · Lecture notes in mechanical engineering · doi:10.1007/978-3-032-21701-1_3
Fan, L., Zou, T., Ye, J., Du, B., Tan, X., & Chen, W. (2026) · Structural Health Monitoring · doi:10.1177/14759217261444576
Next-Gen Marketing Insights: Human-AI Collaboration in Analytics
Coda, R., & Limongi, R. (2026) · Developments in marketing science: proceedings of the Academy of Marketing Science · doi:10.1007/978-3-032-19947-8_8
Rethinking Construction Schedule Risks of Infrastructure Projects from a Dynamic Perspective
Ma, G., & Qi, R. (2026) · Engineering Management Journal · doi:10.1080/10429247.2026.2669080
Shehhi, M. A., & Tariq, M. U. (2026) · SSRN Electronic Journal · doi:10.2139/ssrn.6955549
Modeling the Adoption of Smart Technologies in the Construction Industry
Zohourian, M., Pamidimukkala, A., Kermanshachi, S., & Almaskati, D. N. (2026) · ASCE International Conference on Transportation and Development (ICTD) · doi:10.1061/9780784487013.013
Ali, Y. A., & Burhan, A. M. (2026) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1644/1/012085
AI Orientation in Project-Based Organizations: An Organizational- and Individual-Level Perspective
Hettrich, B., & Kock, A. (2026) · Project Management Journal · doi:10.1177/87569728261474500
Banger, N. K. A. D. N. (2026) · International Journal of Advanced Research in Science Communication and Technology · doi:10.48175/ijarsct-38047
Zohourian, M., Pamidimukkala, A., & Kermanshachi, S. (2026) · Architecture Structures and Construction · doi:10.1007/s44150-026-00211-4
AI driven construction: unlocking efficiencies, improving safety and optimising outcomes
(24423008), N. J., Sohail, M., & Aljaber, K. (2026) · Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction · doi:10.1680/jsmic.24.00041
Mohamed, M. A. H., & Al-Mhdawi, M. K. S. (2026) · Frontiers in Built Environment · doi:10.3389/fbuil.2026.1833980
Paetzold, F., Guggenberger, T. M., Jungk, T., Protschky, D., Ströher, T., & Strüker, J. (2026) · Electronic Markets · doi:10.1007/s12525-026-00928-6
Ullah, F., Qayyum, S., Olatunji, O. A., Leviäkangas, P., Banihashemi, S., Maqsoom, A., Prasittisopin, L., & Thaheem, M. J. (2026) · Risk sciences. · doi:10.1016/j.risk.2026.100065
Bachari, M. S., Khademvatani, A., & Iranfar, M. (2026) · PLoS ONE · doi:10.1371/journal.pone.0357560
Dutot, V., & Doargajudhur, M. S. (2026) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-04-2026-0198
Agyekum, K., Pittri, H., Sackey, K. N. Y. S., Gasu, J. S., & Oduro, J. A. (2026) · Journal of Engineering Design and Technology · doi:10.1108/jedt-05-2026-0350 · Cited by 1
Evaluation of Prompt Engineering for LLM-Based Construction Contract Risk Analysis
Rasool, S., Chen, Y., Udeaja, C. E., & Fong, D. (2026) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/jladah.ladr-1659
Shi, M., Liang, M., & Hwang, B. (2026) · Journal of Management in Engineering · doi:10.1061/jmenea.meeng-7659
Tarique, M., Munir, N., Haris, R. M., & Hussain, S. A. (2026) · The regional tribune. · doi:10.55737/trt/v-viii.351
Metadata
- Authors
- Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M.
- Affiliations
- University of Electronic Science and Technology of China (CN)
- University of the Punjab (PK)
- University of Engineering and Technology Lahore (PK)
- Corresponding author
- Afzal, Farman
- Venue
- International Journal of Managing Projects in Business
- Publisher
- Emerald
- Published
- 2019-09-24
- Volume
- 14
- Issue
- 2
- Pages
- 300-328
- ISSN
- 1753-8378 (ISSN-L)
- OpenAlex
- W2980412932
- Cited by
- 172
- References
- 154
- Citations by year
- 2026: 40 · 2025: 47 · 2024: 32 · 2023: 21 · 2022: 22 · 2021: 6 · 2020: 4
- FWCI
- 5.73
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Managing Projects in Business (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Keywords
- construction risk management, cost risk assessment, cost overruns, artificial intelligence, fuzzy logic, fuzzy neural network, fuzzy simulation, Bayesian networks, uncertainty, hybrid algorithm, subjective risk assessment
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review