Factors influencing labor productivity on construction sites: A state-of-the-art literature review and a survey
The DOI matches its Crossref record; 45 of the 45 references it cites were found in a registry or an index.
Abstract
Purpose: – Productivity is a worldwide problem and efforts have been made over the last three decades or so to explore ways to increase the rate of productivity on construction sites. The purpose of this paper is to investigate the state of the art in productivity research and to present the findings of a survey into the factors that can impair productivity on site. Design/methodology/approach: – A literature review is structured under five general headings: pre-construction activities; activities during construction; managerial and leadership issues; motivational factors; and organizational factors. In total, 46 determinants were extracted from the above headings and were assessed by 36 main contractors. Findings: – The literature review revealed that while there has been an advancement in developing techniques and tools to improving productivity on site, more need to be done to invest in technology and innovation. The interview survey indicated that factors associated with pre-construction activities, namely, the “experience of the selected site and project managers,” “design errors,” “buildability of the design,” “project planning,” “communication,” “ leadership style” and “procurement method” as the most critical factors influencing site productivity. Other highly ranked factors are “mismanagement of material” and “the work environment.” Research limitations/implications: – The survey is based on main contractors and thus not generalized to cover other sectors of the building team such as designers and engineers. Practical implications: – Outcome of this research can be used to provide professionals and contractors guidance for focussing, acting upon and controlling the most significant factors perceived to influence the construction labor productivity (CLP) on site. Originality/value: – First, reviewed the state of the art and trends in construction productivity research. Second, primary survey with industry experts to rank the relative importance of factors that can influence CLP on site.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Alkali-Activated Slag Concrete with Recycled Aggregate: Long-Term Performance
Bachus, R. C., Terzariol, M., Pastén, C., Chong, S. H., Dai, S., Cha, M. S., Kim, S., Jang, J., Papadopoulos, E., Roshankhah, S., et al. (2008) · TU/e Research Portal · doi:10.1061/%28asce%29 · Cited by 1,182
Causes of construction delay: traditional contracts
Odeh, A. M., & Battaineh, H. T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00037-5 · Cited by 810
Factors Affecting Construction Labor Productivity in Kuwait
Jarkas, A. M., & Bitar, C. G. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000501 · Cited by 433
Lee, M., Wu, Y., & Tsai, C. (2009) · International Journal of Science Education · doi:10.1080/09500690802314876 · Cited by 378
Critical Review of Labor Productivity Research in Construction Journals
Yi, W., & Chan, A. P. C. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000194 · Cited by 366
Factors Influencing Construction Labor Productivity in Egypt
El-Gohary, K. M., & Aziz, R. F. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000168 · Cited by 343
Research Trend of Public-Private Partnership in Construction Journals
Ke, Y., Wang, S., Chan, A. P., & Cheung, E. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:10(1076 · Cited by 309
Tsai, C., & Lydia Wen, M. (2005) · International Journal of Science Education · doi:10.1080/0950069042000243727 · Cited by 307
Testing Herzberg’s two‐factor theory in the Thai construction industry
Ruthankoon, R., & Ogunlana, S. O. (2003) · Engineering Construction & Architectural Management · doi:10.1108/09699980310502946 · Cited by 273
Construction industry productivity and the potential for collaborative practice
Fulford, R., & Standing, C. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.007 · Cited by 259
Cited by
Vision of 3D printing with concrete — Technical, economic and environmental potentials
De Schutter, G., Lesage, K., Mechtcherine, V., Nerella, V. N., Habert, G., & Agusti-Juan, I. (2018) · Cement and Concrete Research · doi:10.1016/j.cemconres.2018.06.001 · Cited by 1,072
Mirzaei, K., Arashpour, M., Asadi, E., Masoumi, H., Bai, Y., & Behnood, A. (2022) · Advanced Engineering Informatics · doi:10.1016/j.aei.2021.101501 · Cited by 231
Chu, M., Matthews, J., & Love, P. E. D. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.10.032 · Cited by 201
Exploring the Factors Affecting Sustainable Human Resource Productivity in Railway Lines
Azizi, N., Akhavan, P., Philsoophian, M., Davison, C., Haass, O., & Saremi, S. (2021) · Sustainability · doi:10.3390/su14010225 · Cited by 19
“In essence, it needs to be acknowledged that the activities of every organization are influenced by a set of factors, the identification and study of which may effectively help to improve activities and to realize organizational objectives [15,16].”
Background
Metadata
- Authors
- Naoum, S. G.
- Venue
- International Journal of Productivity and Performance Management
- Publisher
- Emerald
- Published
- 2016-03-07
- Volume
- 65
- Issue
- 3
- Pages
- 401-421
- ISSN
- 0043-8022 (ISSN-L)
- 1741-0401
- OpenAlex
- W2337693797
- Cited by
- 167
- References
- 45
- FWCI
- 13.50
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.