Factors influencing labor productivity on construction sites: A state-of-the-art literature review and a survey
The DOI matches its Crossref record; 45 of the 45 references it cites were found in a registry or an index.
Abstract
Purpose: – Productivity is a worldwide problem and efforts have been made over the last three decades or so to explore ways to increase the rate of productivity on construction sites. The purpose of this paper is to investigate the state of the art in productivity research and to present the findings of a survey into the factors that can impair productivity on site. Design/methodology/approach: – A literature review is structured under five general headings: pre-construction activities; activities during construction; managerial and leadership issues; motivational factors; and organizational factors. In total, 46 determinants were extracted from the above headings and were assessed by 36 main contractors. Findings: – The literature review revealed that while there has been an advancement in developing techniques and tools to improving productivity on site, more need to be done to invest in technology and innovation. The interview survey indicated that factors associated with pre-construction activities, namely, the “experience of the selected site and project managers,” “design errors,” “buildability of the design,” “project planning,” “communication,” “ leadership style” and “procurement method” as the most critical factors influencing site productivity. Other highly ranked factors are “mismanagement of material” and “the work environment.” Research limitations/implications: – The survey is based on main contractors and thus not generalized to cover other sectors of the building team such as designers and engineers. Practical implications: – Outcome of this research can be used to provide professionals and contractors guidance for focussing, acting upon and controlling the most significant factors perceived to influence the construction labor productivity (CLP) on site. Originality/value: – First, reviewed the state of the art and trends in construction productivity research. Second, primary survey with industry experts to rank the relative importance of factors that can influence CLP on site.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Alkali-Activated Slag Concrete with Recycled Aggregate: Long-Term Performance
Bachus, R. C., Terzariol, M., Pastén, C., Chong, S. H., Dai, S., Cha, M. S., Kim, S., Jang, J., Papadopoulos, E., Roshankhah, S., et al. (2008) · TU/e Research Portal · doi:10.1061/%28asce%29 · Cited by 1,182
Causes of construction delay: traditional contracts
Odeh, A. M., & Battaineh, H. T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00037-5 · Cited by 810
Factors Affecting Construction Labor Productivity in Kuwait
Jarkas, A. M., & Bitar, C. G. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000501 · Cited by 433
Lee, M., Wu, Y., & Tsai, C. (2009) · International Journal of Science Education · doi:10.1080/09500690802314876 · Cited by 378
Critical Review of Labor Productivity Research in Construction Journals
Yi, W., & Chan, A. P. C. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000194 · Cited by 366
Factors Influencing Construction Labor Productivity in Egypt
El-Gohary, K. M., & Aziz, R. F. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000168 · Cited by 343
Research Trend of Public-Private Partnership in Construction Journals
Ke, Y., Wang, S., Chan, A. P., & Cheung, E. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:10(1076 · Cited by 309
Tsai, C., & Lydia Wen, M. (2005) · International Journal of Science Education · doi:10.1080/0950069042000243727 · Cited by 307
Testing Herzberg’s two‐factor theory in the Thai construction industry
Ruthankoon, R., & Ogunlana, S. O. (2003) · Engineering Construction & Architectural Management · doi:10.1108/09699980310502946 · Cited by 273
Construction industry productivity and the potential for collaborative practice
Fulford, R., & Standing, C. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.007 · Cited by 259
FACTORS AFFECTING THE PRODUCTIVITY OF BUILDING CRAFTSMEN ‐ STUDIES OF UGANDA
Alinaitwe, H. M., Mwakali, J. A., & Hansson, B. (2007) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2007.9636434 · Cited by 240
Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity
Dai, J., Goodrum, P. M., & Maloney, W. F. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:3(217 · Cited by 232
Trends in productivity improvement in the US construction industry
Arditi, D., & Mochtar, K. (2000) · Construction Management and Economics · doi:10.1080/014461900370915 · Cited by 221
Minimizing waste on construction project sites
FANIRAN, O. O., & CABAN, G. (1998) · Engineering, Construction and Architectural Management · doi:10.1108/eb021073 · Cited by 220
Durdyev, S., & Mbachu, J. (2011) · Construction Economics and Building · doi:10.5130/ajceb.v11i3.2120 · Cited by 211
The ranking of construction management journals
Wing, C. K. (1997) · Construction Management and Economics · doi:10.1080/014461997372953 · Cited by 198
Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities
Eastman, C. M., & Sacks, R. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:7(517 · Cited by 197
Quantitative Effects of Construction Changes on Labor Productivity
Thomas, H. R., & Napolitan, C. L. (1995) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1995)121:3(290 · Cited by 191
Improving construction productivity: a subcontractor's perspective
Loosemore, M. (2014) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2013-0043 · Cited by 177
Work Flow Variation and Labor Productivity: Case Study
Liu, M., Ballard, G., & Ibbs, W. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000056 · Cited by 171
Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle
Thomas, H. R., Horman, M. J., Minchin, R. E., & Chen, D. (2003) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2003)129:3(251 · Cited by 170
A review of enabling factors in construction industry productivity in an Australian environment
Hughes, R., & Thorpe, D. (2014) · Construction Innovation · doi:10.1108/ci-03-2013-0016 · Cited by 152
Measuring productivity in the construction industry
Crawford, P., & Vogl, B. (2006) · Building Research & Information · doi:10.1080/09613210600590041 · Cited by 151
Loss of Labor Productivity due to Delivery Methods and Weather
Thomas, H. R., Riley, D. R., & Sanvido, V. E. (1999) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1999)125:1(39 · Cited by 148
Quantifying Levels of Wasted Time in Construction with Meta-Analysis
Horman, M. J., & Kenley, R. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:1(52 · Cited by 143
Drivers of productivity among construction workers: A study in a developing country
Kazaz, A., & Ulubeyli, S. (2006) · Building and Environment · doi:10.1016/j.buildenv.2006.04.020 · Cited by 140
Managing and minimizing construction waste: a practical guide
Ferguson, J. (1995) · doi:10.1680/mamcwapg.20238 · Cited by 136
An e‐business model to support supply chain activities in construction
Cheng, E. W. L., Li, H., Love, P. E. D., & Irani, Z. (2001) · Logistics Information Management · doi:10.1108/09576050110363239 · Cited by 129
Impact of Shift Work on Labor Productivity for Labor Intensive Contractor
Hanna, A. S., Chang, C.-K., Sullivan, K. T., & Lackney, J. A. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:3(197 · Cited by 129
Watkins, M., Mukherjee, A., Onder, N., & Mattila, K. G. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000022 · Cited by 127
Exploring change in construction: supply chain management
Fernie, S., & Thorpe, A. (2007) · Engineering Construction & Architectural Management · doi:10.1108/09699980710760649 · Cited by 125
Contractors perspective toward factors affecting labor productivity in building construction
Mahamid, I. (2013) · Engineering Construction & Architectural Management · doi:10.1108/ecam-08-2011-0074 · Cited by 120
Role of Leadership in Fostering an Innovation Climate in Construction Firms
Chan, I. Y. S., Liu, A. M. M., & Fellows, R. F. (2013) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000271 · Cited by 113
Investigating the relationship between planning reliability and project performance
González, V. A., Alarcón, L. F., & Mundaca, F. (2008) · Production Planning & Control · doi:10.1080/09537280802059023 · Cited by 105
Learning to see work flow: an application of lean concepts to precast concrete fabrication
Ballard, G., Harper, N., & Zabelle, T. R. (2003) · Engineering Construction & Architectural Management · doi:10.1108/09699980310466505 · Cited by 101
Developing a Benchmarking Model for Construction Projects in Hong Kong
Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., Chiang, Y. H., & Yang, H. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000622 · Cited by 91
Model to Predict the Impact of a Technology on Construction Productivity
Goodrum, P. M., Haas, C. T., Caldas, C. H., Zhai, D., Yeiser, J., & Homm, D. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000328 · Cited by 77
Statistical-Fuzzy Approach to Quantify Cumulative Impact of Change Orders
Hanna, A. S., Lotfallah, W. B., & Lee, M.-J. (2002) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2002)16:4(252 · Cited by 51
How ‘just-in-time’ wastages can be quantified: case study of a private condominium project
Pheng, L. S., & Tan, S. K. L. (1998) · Construction Management and Economics · doi:10.1080/014461998371926 · Cited by 47
Improved Baseline Productivity Analysis Technique
Lin, C., & Huang, H.-M. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000129 · Cited by 34
Construction resource/method factors influencing productivity for high rise concrete construction
PROVERBS, D. G., Holt, G. D., & Olomolaiye, P. O. (1999) · Construction Management and Economics · doi:10.1080/014461999371196 · Cited by 34
Site‐Level Construction Information System
Sanvido, V. E., & Paulson, B. C. (1992) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1992)118:4(701 · Cited by 24
Improved Baseline Method to Calculate Lost Construction Productivity
Zhao, T., & Dungan, J. M. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000800 · Cited by 20
Maloney, W. F. (1986) · Journal of Management in Engineering · doi:10.1061/(asce)9742-597x(1986)2:4(231 · Cited by 19
Pradhan, A. R., & Akinci, B. (2011) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000155 · Cited by 16
Cited by
Vision of 3D printing with concrete — Technical, economic and environmental potentials
De Schutter, G., Lesage, K., Mechtcherine, V., Nerella, V. N., Habert, G., & Agusti-Juan, I. (2018) · Cement and Concrete Research · doi:10.1016/j.cemconres.2018.06.001 · Cited by 1,072
Mirzaei, K., Arashpour, M., Asadi, E., Masoumi, H., Bai, Y., & Behnood, A. (2022) · Advanced Engineering Informatics · doi:10.1016/j.aei.2021.101501 · Cited by 231
Chu, M., Matthews, J., & Love, P. E. D. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.10.032 · Cited by 201
Exploring the Factors Affecting Sustainable Human Resource Productivity in Railway Lines
Azizi, N., Akhavan, P., Philsoophian, M., Davison, C., Haass, O., & Saremi, S. (2021) · Sustainability · doi:10.3390/su14010225 · Cited by 19
“In essence, it needs to be acknowledged that the activities of every organization are influenced by a set of factors, the identification and study of which may effectively help to improve activities and to realize organizational objectives [15,16].”
Background
Metadata
- Authors
- Naoum, S. G.
- Venue
- International Journal of Productivity and Performance Management
- Publisher
- Emerald
- Published
- 2016-03-07
- Volume
- 65
- Issue
- 3
- Pages
- 401-421
- ISSN
- 0043-8022 (ISSN-L)
- 1741-0401
- OpenAlex
- W2337693797
- Cited by
- 167
- References
- 45
- FWCI
- 13.50
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.