An experimental investigation of lean management in aviation: Avoiding unforced errors for better supply chain
The DOI matches its Crossref record; 93 of the 95 references it cites were found in a registry or an index.
Abstract
Purpose: – The purpose of this paper is to identify important factors those which constrain implementation and sustenance of lean strategies in aviation sector and ways to avoid slow attrition within annals of lean. Design/methodology/approach: – This research is exploratory in nature and survey methodology is used for assessing the post lean management implementation environment. The focus of study is cross-sectional, within aircraft industry based on the information collected through survey and a case study. Findings: – The reasons for the weak sustenance of lean initiative have been identified. The measures as undertaken in the case study implied a successful turnaround of specific department. Comparison with automobile industry indicates suggestions and pitfalls to be avoided with suitable illustration. Research limitations/implications: – The target of the study is the aircraft manufacturer and hence it has the limitation in terms of the scope. However, overall results are encouraging with the survey generating expected inputs and underline the need for similar research in the aerospace sector. The study has implications for managers in all types of industrial environment, especially in aviation, in the era of globalized lean supply chain establishment. Practical implications: – Inputs obtained are from both industrial research in a live environment and a case study which impacts lean management in industries. Originality/value: – This paper presents novel inputs regarding post lean implementation scenario in aviation sector, which has complicated internal processes. It also tries to establish factors relevant for any organization in assessing lean initiatives.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“AuthorssuchasJastiandKodali(2019),Kehrand Proctor(2017),Kumar etal. (2015)andPozo etal. (2018)usedtheToyotaProductionSystem house;however,thetoolsusedinbuildingtheirToyotaProductionSystemhousestructures aredifferent.”
From A systematic literature review of lean manufacturing implementation in manufacturing-based sectors of the developing and developed countries (2022) · cites this paper as Kumar et al. (2015)
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Competitive Advantage: Creating and Sustaining Superior Performance
Porter, M. E. (1985) · Cited by 27,493
The Art of Case Study Research
Johnson, K. E., & Stake, R. E. (1996) · The Modern Language Journal · doi:10.2307/329758 · Cited by 15,826
Hartley, J. (2004) · Essential Guide to Qualitative Methods in Organizational Research · doi:10.4135/9781446280119.n26 · Cited by 15,461
Research Methodology: Methods and Techniques
Kothari, C. R. (2004) · The Open University of Tanzania Repository (The Open University of Tanzania) · Cited by 10,197
Business models, business strategy and innovation
Teece, D. J. (2010) · Long Range Planning · doi:10.1016/j.lrp.2009.07.003 · Cited by 8,335
Why do Some Countries Produce So Much More Output Per Worker than Others?
Hall, R. E., & Jones, C. I. (1999) · The Quarterly Journal of Economics · doi:10.1162/003355399555954 · Cited by 7,879
Competitive advantage: creating and sustaining superior performance
Ponter, M. E. (1998) · Cited by 5,835
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
Business Research: A Practical Guide for Undergraduate and Postgraduate Students
Collis, J., & Hussey, R. (2009) · Cited by 3,850
Issues in Supply Chain Management
Lambert, D. M., & Cooper, M. C. (2000) · Industrial Marketing Management · doi:10.1016/s0019-8501(99)00113-3 · Cited by 3,099
Supply Chain Management: More Than a New Name for Logistics
Cooper, M. C., Lambert, D. M., & Pagh, J. D. (1997) · The International Journal of Logistics Management · doi:10.1108/09574099710805556 · Cited by 2,861
Supply Chain Management: Implementation Issues and Research Opportunities
Lambert, D. M., Cooper, M. C., & Pagh, J. D. (1998) · The International Journal of Logistics Management · doi:10.1108/09574099810805807 · Cited by 2,435
Lean Thinking—Banish Waste and Create Wealth in your Corporation
Womack, J. P., & Jones, D. T. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600967 · Cited by 2,122
Performance measures and metrics in a supply chain environment
Gunasekaran, A., Patel, C., & Tirtiroglu, E. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110358468 · Cited by 2,025
Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain
Ben Naylor, J., Naim, M. M., & Berry, D. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00223-0 · Cited by 1,573
The genealogy of lean production
Holweg, M. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2006.04.001 · Cited by 1,480
Getting to the Bottom of “Triple Bottom Line”
Norman, W., & MacDonald, C. (2004) · Business Ethics Quarterly · doi:10.5840/beq200414211 · Cited by 1,138
An empirical investigation into supply chain management: a perspective on partnerships
Spekman, R. E., Kamauff, J. W., & Myhr, N. (1998) · Supply Chain Management: An International Journal · doi:10.1108/13598549810215379 · Cited by 1,079
Supply Chain Management: Relationships, Chains and Networks
Harland, C. M. (1996) · British Journal of Management · doi:10.1111/j.1467-8551.1996.tb00148.x · Cited by 1,065
Neely, A. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510633648 · Cited by 866
Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach
Agarwal, A., Shankar, R., & Tiwari, M. K. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.12.005 · Cited by 750
Self-citationSupply-Chain Management: Logistics Catches up with Strategy
Oliver, R. K., & Webber, M. D. (2012) · Springer eBooks · doi:10.1007/978-3-642-27922-5_15 · Cited by 699
Lean production, six sigma quality, TQM and company culture
Dahlgaard, J. J., & Mi Dahlgaard‐Park, S. (2006) · The TQM Magazine · doi:10.1108/09544780610659998 · Cited by 692
Lambert, D. M., & Pohlen, T. L. (2001) · The International Journal of Logistics Management · doi:10.1108/09574090110806190 · Cited by 655
Modeling agility of supply chain
Agarwal, A., Shankar, R., & Tiwari, M. K. (2007) · Industrial Marketing Management · doi:10.1016/j.indmarman.2005.12.004 · Cited by 649
Self-citationProduct Substitutability and Productivity Dispersion
Syverson, C. (2004) · Review of Economics and Statistics · doi:10.1162/003465304323031094 · Cited by 646
Business Process Reengineering: Breakpoint Strategies for Market Dominance
Johansson, H. J. E. A. (1993) · Cited by 622
Assessing changes towards lean production
Karlsson, C., & Åhlström, P. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610109820 · Cited by 621
To Pull or Not to Pull: What Is the Question?
Hopp, W. J., & Spearman, M. L. (2004) · Manufacturing & Service Operations Management · doi:10.1287/msom.1030.0028 · Cited by 592
The Toyota Product Development System: Integrating People, Process, and Technology
Morgan, J. M., & Liker, J. Κ. (2006) · Cited by 587
Similarities and differences between TQM, six sigma and lean
Andersson, R., Eriksson, H., & Torstensson, H. (2006) · The TQM Magazine · doi:10.1108/09544780610660004 · Cited by 550
The evolution of lean Six Sigma
Pepper, M. P. J., & Spedding, T. A. (2010) · International Journal of Quality & Reliability Management · doi:10.1108/02656711011014276 · Cited by 544
The New Kaldor Facts: Ideas, Institutions, Population, and Human Capital
Jones, C. I., & Romer, P. M. (2010) · American Economic Journal: Macroeconomics · doi:10.1257/mac.2.1.224 · Cited by 533
An innovative performance measurement method for supply chain management
Chan, F. T. S., & Qi, H. J. (2003) · Supply Chain Management: An International Journal · doi:10.1108/13598540310484618 · Cited by 482
Lean Solutions: How Companies and Customers Can Create Value and Wealth Together
Womack, J. P., & Jones, D. T. (2005) · Cited by 442
Spear, S. J. (2004) · PubMed · Cited by 341
Measuring and Selling the Value of Logistics
Lambert, D. M., & Burduroglu, R. (2000) · The International Journal of Logistics Management · doi:10.1108/09574090010806038 · Cited by 333
Knowledge management, response ability, and the agile enterprise
Dove, R. (1999) · Journal of Knowledge Management · doi:10.1108/13673279910259367 · Cited by 311
Lean manufacturing in developing countries: evidence from Indian SMEs
Panizzolo, R., Garengo, P., Sharma, M. K., & Gore, A. (2012) · Production Planning & Control · doi:10.1080/09537287.2011.642155 · Cited by 290
Self-citationDennis, P. (2017) · Productivity Press eBooks · doi:10.1201/b18961 · Cited by 287
The New Kaldor Facts: Ideas, Institutions, Population, and Human Capital
Jones, C., & Romer, P. (2009) · National Bureau of Economic Research · doi:10.3386/w15094 · Cited by 269
Emiliani, M. L. (1998) · Management Decision · doi:10.1108/00251749810239504 · Cited by 251
Implementing lean production systems: barriers to change
Sim, K. L., & Rogers, J. W. (2008) · Management Research News · doi:10.1108/01409170910922014 · Cited by 235
A model for the assessment of waste in job shop environments
Rawabdeh, I. A. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510608619 · Cited by 194
A survey on lean practices in Indian machine tool industries
Eswaramoorthi, M., Kathiresan, G. R., Prasad, P. S. S., & Mohanram, P. V. (2011) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-010-2788-y · Cited by 186
Development of a Lean Enterprise Transformation Maturity Model
Nightingale, D. J., & Mize, J. H. (2002) · Information Knowledge Systems Management · doi:10.3233/iks-2002-00047 · Cited by 183
Godinho Filho, M., Ganga, G. M. D., & Gunasekaran, A. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1201606 · Cited by 182
Supply chain management: theory and practice – the emergence of an academic discipline?
Cousins, P. D., Lawson, B., & Squire, B. C. (2006) · International Journal of Operations & Production Management · doi:10.1108/01443570610672194 · Cited by 176
Application of benchmarking for assessing the lean manufacturing implementation
Gurumurthy, A., & Kodali, R. (2009) · Benchmarking An International Journal · doi:10.1108/14635770910948268 · Cited by 173
Leaders lost in transformation
Emiliani, M. L., & Stec, D. J. (2005) · Leadership & Organization Development Journal · doi:10.1108/01437730510607862 · Cited by 172
Murman, E., Allen, T., Bozdogan, K., Cutcher-Gershenfeld, J., McManus, H., Nightingale, D., Rebentisch, E., Shields, T., Stahl, F., Walton, M., et al. (2002) · Palgrave Macmillan UK eBooks · doi:10.1057/9781403907509 · Cited by 161
Achieving Lean Design Process: Improvement Methodology
Freire, J., & Alarcón, L. F. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:3(248 · Cited by 154
LEAN MANUFACTURING: THEORY AND PRACTICE
Čiarnienė, R., & Vienažindienė, M. (2012) · ECONOMICS AND MANAGEMENT · doi:10.5755/j01.em.17.2.2205 · Cited by 153
Lean performance evaluation of manufacturing systems: A dynamic and innovative approach
Behrouzi, F., & Wong, K. Y. (2011) · Procedia Computer Science · doi:10.1016/j.procs.2010.12.065 · Cited by 146
(2020) · doi:10.31483/a-166 · Cited by 120
A methodological comparison of three strategies for quality improvement
de Mast, J. (2004) · International Journal of Quality & Reliability Management · doi:10.1108/02656710410516989 · Cited by 103
Practice of manufacturing strategy: Evidence from select Indian automobile companies
Dangayach, G. S., & Deshmukh, S. G. (2001) · International Journal of Production Research · doi:10.1080/00207540110040448 · Cited by 102
Relationships between lean product development enablers and problems
Tortorella, G. L., Marodin, G. A., Fettermann, D. D. C., & Fogliatto, F. S. (2016) · International Journal of Production Research · doi:10.1080/00207543.2015.1106020 · Cited by 96
Lean manufacturing in biscuit manufacturing plant: a case
Upadhye, N. N., Deshmukh, S. G., & Garg, S. K. (2010) · International Journal of Advanced Operations Management · doi:10.1504/ijaom.2010.034589 · Cited by 82
Research Methodology and Business Decisions
Buckley, J. W., Buckley, M. H., & Chiang, H.-F. (1976) · Cited by 80
Lean manufacturing in continuous process industry : An empirical study
Mahapatra, S. S., & Mohanty, S. (2007) · Journal of Scientific & Industrial Research · Cited by 79
Duggan, K. J. (2007) · Productivity Press eBooks · doi:10.1201/b17932 · Cited by 76
A research agenda for supply chain and business management thinking
Cox, A. M. (1999) · Supply Chain Management An International Journal · doi:10.1108/13598549910284534 · Cited by 74
The Lean Index: Operational "Lean" Metrics for the Wood Products Industry
Ray, C. D., Zuo, X., Michael, J. H., & Wiedenbeck, J. K. (2007) · Wood and Fiber Science (Society of Wood Science and Technology) · Cited by 73
Performance-Based Assessments: Will Gender Differences in Science Achievement be Eliminated?
Jovanović, J., Solano‐Flores, G., & Shavelson, R. J. (1994) · Education and Urban Society · doi:10.1177/0013124594026004004 · Cited by 64
Streamlined: 14 Principles for Building & Managing the Lean Supply Chain
Srinivasan, M. M., Gilbert, K., & Srikanth, M. L. (2004) · Cited by 64
Purohit, J. K., Mittal, M. L., Mittal, S., & Sharma, M. K. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1166275 · Cited by 58
Self-citationScope for lean implementation: a survey of 127 Indian industries
Singh, B., Garg, S. K., & Sharma, S. K. (2010) · International Journal of Rapid Manufacturing · doi:10.1504/ijrapidm.2010.034253 · Cited by 53 · cited 1×
“(2010), Singh et al. (2010) HUL, Britannia Industries, Godrej Medium to low”
BackgroundLean Leadership in Construction
Orr, C. J. B. (2005) · Cited by 50
An investigation and identification of lean supply chain performance measures in the automotive SMES
Behrouzi, F., & Wong, K. Y. (2011) · Scientific Research and Essays · doi:10.5897/sre11.1125 · Cited by 43
Achieving a Lean Design Process
Freire, J., & Alarcón, L. F. (2000) · Cited by 38
The future of lean construction: a brave new world
Green, S. D. (2000) · Cited by 32
Wilson, P. F., & Pearson, R. D. (1995) · Cited by 32
A study on lean supply chain performance measures of SMEs in the automotive industry
Behrouzi, F., Wong, K. Y., & Behrouzi, F. (2011) · IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) · doi:10.1109/ieem.2011.6117914 · Cited by 31
Measuring Leanness of Manufacturing Systems and Identifying Leanness Target by Considering Agility
Wan, H.-D. (2006) · VTechWorks (Virginia Tech) · Cited by 29
Lean Solutions: How Companies and Customers Can Create Value and Wealth Together
Womack (2007) · Cited by 28
Indian Auto-Component Supply Chain at the Crossroads
Balakrishnan, K., Seshadri, S., Sheopuri, A., & Iyer, A. V. (2007) · INFORMS Journal on Applied Analytics · doi:10.1287/inte.1070.0282 · Cited by 27
Application of lean principles to design processes in construction consultancy firms
Marzouk, M. M., Bakry, I., & El-Said, M. (2011) · International Journal of Construction Supply Chain Management · doi:10.14424/ijcscm101011-43-55 · Cited by 22
A Fallen Idol? Japanese Management in the 1990s
Haslam, C., Williams, K., Johal, S., & Williams, J. (1996) · Asia Pacific Business Review · doi:10.1080/13602389600000018 · Cited by 17
Sharma, A. (2014) · International Journal of Sciences · doi:10.5281/zenodo.3348790 · Cited by 17
Sustaining process improvement: the Red Queen effect
Chakravorty, S. S., & Hales, D. N. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1165308 · Cited by 15
Lean Systems Engineering: Research Initiatives in Support of a New Paradigm
Rebentisch, E., Rhodes, D. H., & Murman, E. M. (2004) · Cited by 15
Implementation of manufacturing strategy: a multisector study of the Indian manufacturing industry
Dangayach, G. S., & Deshmukh, S. G. (2007) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2008.015938 · Cited by 13
The LAI Lean Academy Experience: Introductory Lean Curriculum
Murman, E. M., McManus, H., & Weigel, A. (2014) · Journal of Enterprise Transformation · doi:10.1080/19488289.2014.930543 · Cited by 12
Interdependence within and among 'Supply Chains'
Dubois, A., Hulthén, K., & Pedersen, A. (2003) · Chalmers Publication Library (Chalmers University of Technology) · Cited by 9
Determinants of Inventory Trends in the Indian Automotive Industry: An Empirical StudyPreprint
Saranga, H., Mukherji, A., & Shah, J. (2012) · SSRN Electronic Journal · doi:10.2139/ssrn.2138131 · Cited by 5
Applying the Lessons of “Lean Now” To Transform the US Aerospace Enterprise
Jobo, M. R. S. (2003) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 5
Implementing Lean Thinking: An Interview with William C. Kessler
(1999) · Information Knowledge Systems Management · doi:10.3233/iks-1999-00014 · Cited by 4
Land, S. K., Smith, D. B., & Walz, J. W. (2008) · Wiley eBooks · doi:10.1002/9780470289969.ch8 · Cited by 3
Lean process analysis in administration and production
Schloske, A., & Thieme, P. (2010) · Publikationsdatenbank der Fraunhofer-Gesellschaft (Fraunhofer-Gesellschaft) · Cited by 2
The LAI Lean Academy Experience: Introductory Lean Six Sigma Curriculum
Murman, E. M., McManus, H., Design, M., & Weigel, A. (2013) · Cited by 2
Production Streamlining through Design, Implementation, and Analysis of Lean Manufacturing Methods
Pattison, T. (2010) · OpenCommons - UConn (University of Connecticut) · Cited by 1
C-5 Journey into Lean Workforce Aspects
Fraile, L. (2004) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 1
Cited by
Abu, F., Gholami, H., Mat Saman, M. Z., Zakuan, N., & Streimikiene, D. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.06.279 · Cited by 197
“…(2018) Poka Yoke Abolhassani et al. (2016); Bhamu and Singh Sangwan (2014); Bhat et al. (2016); Chaurasia et al. (2016); de Kogel and Becker (2016); Kumar Br et al. (2015); Melton (2005); S. Sharma and Shah (2016); Tayyab and Sarkar (2016), Jidoka/Poka-yoke Marodin et al. (2016), Jidoka de Kogel…”
BackgroundInfluentialGodinho Filho, M., Ganga, G. M. D., & Gunasekaran, A. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1201606 · Cited by 182
“…et al. 2008), process industries (Abdulmalek and Rajgopal 2006), clothing (Sukwadi, Wee, and Yang 2013), hi-tech companies (Wang 2008), aviation/aerospace (Ehret and Cooke 2010; Kumar, Sharma, and Agarwal 2015), healthcare (Costa and Godinho Filho 2016; Henrique et al. 2016), among many others.”
BackgroundAdeodu, A. O., Maladzhi, R. W., Katumba, M. G. K.-K., & Daniyan, I. A. (2022) · Heliyon · doi:10.1016/j.heliyon.2023.e14915 · Cited by 140
Lean product development and lean manufacturing: Testing moderation effects
Marodin, G., Frank, A. G., Tortorella, G. L., & Netland, T. (2018) · International Journal of Production Economics · doi:10.1016/j.ijpe.2018.07.009 · Cited by 139
Hill, J., Thomas, A. J., Mason-Jones, R. K., & Elkateb, S. N. (2017) · Production & Manufacturing Research · doi:10.1080/21693277.2017.1417179 · Cited by 113
Metadata
- Authors
- Kumar BR, R., Sharma, M. K., & Agarwal, A.
- Venue
- Journal of Manufacturing Technology Management
- Publisher
- Emerald
- Published
- 2015-03-02
- Volume
- 26
- Issue
- 2
- Pages
- 231-260
- ISSN
- 1741-038X (ISSN-L)
- OpenAlex
- W1771174538
- Cited by
- 41
- References
- 95
- FWCI
- 10.24
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.