A retrospective look at our evolving understanding of project success
The DOI matches its Crossref record; 32 of the 32 references it cites were found in a registry or an index.
Abstract
This publication contains reprint articles for which IEEE does not hold copyright. Full text is not available on IEEE Xplore for these articles.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Is the Resource-Based “View” a Useful Perspective for Strategic Management Research?
Priem, R. L., & Butler, J. E. (2001) · Academy of Management Review · doi:10.5465/amr.2001.4011928 · Cited by 4,461
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
The Logical Framework Method for Defining Project Success
Baccarini, D. (1999) · Project Management Journal · doi:10.1177/875697289903000405 · Cited by 1,136
On the nature of the project as a temporary organization
Turner, J. R., & Müller, R. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00020-0 · Cited by 1,038
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977
Critical factors in successful project implementation
Pinto, J. K., & Slevin, D. P. (1987) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1987.6498856 · Cited by 966
From initial idea to unique advantage: The entrepreneurial challenge of constructing a resource base
Brush, C. G., Greene, P. G., & Hart, M. M. (2001) · Academy of Management Perspectives · doi:10.5465/ame.2001.4251394 · Cited by 917
The role of project management in achieving project success
Munns, A., & Bjeirmi, B. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00057-7 · Cited by 910
Project Management: Strategic Design and Implementation
Cleland, D. I. (1990) · Cited by 744
Criteria of project success: an exploratory re-examination
Lim, C. S., & Mohamed, M. Z. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00040-4 · Cited by 731
Middle Management’s Strategic Influence and Organizational Performance
Floyd, S. W., & Wooldridge, B. (1997) · Journal of Management Studies · doi:10.1111/1467-6486.00059 · Cited by 727
The Anatomy of Major Projects: A Study of the Reality of Project Management
Morris, P. W. G., & Hough, G. H. (1988) · Medical Entomology and Zoology · Cited by 696
Pinto, J. K., & Mantel, S. J. (1990) · IEEE Transactions on Engineering Management · doi:10.1109/17.62322 · Cited by 594
How can IS/IT projects be measured for success?
Wateridge, J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00022-7 · Cited by 474
Handbook of Project-Based Management : Improving the Process for Achieving Strategic Objectives
Turner, J. R. (1998) · Cited by 321
A practical use of key success factors to improve the effectiveness of project management
Clarke, A. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00031-3 · Cited by 313
Critical Success Factors in R&D Projects
Pinto, J. K., & Slevin, D. P. (1989) · Research-Technology Management · doi:10.1080/08956308.1989.11670572 · Cited by 294
In search of excellence in project management
Kerzner, H. (1987) · Journal of systems management · doi:10.5555/25198.25371 · Cited by 266
The Current State of Project Management Research: Trends, Interpretations, and Predictions
Kloppenborg, T. J., & Opfer, W. A. (2002) · Project Management Journal · doi:10.1177/875697280203300203 · Cited by 248
Turner, J. R., & Müller, R. (2004) · European Management Journal · doi:10.1016/j.emj.2004.04.010 · Cited by 245
Critical factors in project implementation: a comparison of construction and R&D projects
Pinto, J. K., & Covin, J. G. (1989) · Technovation · doi:10.1016/0166-4972(89)90040-0 · Cited by 233
Belout, A. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00011-2 · Cited by 231
Critical Success Factors for New Product Development
Lester, D. H. (1998) · Research-Technology Management · doi:10.1080/08956308.1998.11671182 · Cited by 197
The role of structural factors in determining project management success
Might, R. J., & Fischer, W. A. (1985) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1985.6447584 · Cited by 178
An empirical investigation of project evaluation criteria
Tukel, O. I., & Rom, W. O. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110364704 · Cited by 171
Project management maturity models: The silver bullets of competitive advantage.
Jugdev, K., & Thomas, J. L. (2002) · Libraries and Cultural Resources (University of Calgary) · doi:10.11575/prism/30195 · Cited by 157
Self-citationProject Management in North America, Stability of the Concepts
Urli, B., & Urli, D. (2000) · Project Management Journal · doi:10.1177/875697280003100305 · Cited by 89
Frame, J. D. (1994) · Jossey-Bass Publishers eBooks · Cited by 88
Jonker, J. B. (2000) · Total Quality Management · doi:10.1080/09544120050008156 · Cited by 50
Jugdev, K. (2003) · Libraries and Cultural Resources (University of Calgary) · doi:10.11575/prism/23246 · Cited by 27
Self-citationCriteria for project performance in business context
Kujala, J., & Artto, K. A. (2000) · Cited by 27
Cited by
Linking trust and collaboration in project teams to project management success
Bond-Barnard, T. J., Fletcher, L., & Steyn, H. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-06-2017-0068 · Cited by 208
Metadata
- Authors
- Jugdev, K., & Moller, R.
- Venue
- IEEE Engineering Management Review
- Published
- 2006
- Volume
- 34
- Issue
- 3
- Pages
- 110-110
- ISSN
- 0360-8581 (ISSN-L)
- 1937-4178
- OpenAlex
- W2128905319
- Cited by
- 170
- References
- 32
- FWCI
- 3.84
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.