The DOI matches its Crossref record.
Systems Analysis and Project Management.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
A theory of the temporary organization
Lundin, R. A., & Söderholm, A. (1995) · Scandinavian Journal of Management · doi:10.1016/0956-5221(95)00036-u · Cited by 1,558
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
No project is an island: linking projects to history and context
Engwall, M. (2003) · Research Policy · doi:10.1016/s0048-7333(02)00088-4 · Cited by 1,142
On the nature of the project as a temporary organization
Turner, J. R., & Müller, R. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00020-0 · Cited by 1,038
Somers, T. M., & Nelson, K. (2005) · Proceedings of the 34th Annual Hawaii International Conference on System Sciences · doi:10.1109/hicss.2001.927129 · Cited by 873
One Size Does Not Fit All Projects: Exploring Classical Contingency Domains
Shenhar, A. J. (2001) · Management Science · doi:10.1287/mnsc.47.3.394.9772 · Cited by 821
Inquiring into the temporary organization: New directions for project management research
Packendorff, J. (1995) · Scandinavian Journal of Management · doi:10.1016/0956-5221(95)00018-q · Cited by 753
Akkermans, H., & van Helden, K. (2002) · European Journal of Information Systems · doi:10.1057/palgrave.ejis.3000418 · Cited by 743
Current practice in project management — an empirical study
White, D., & Fortune, J. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00029-6 · Cited by 705
Framing of project critical success factors by a systems model
Fortune, J., & White, D. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.07.004 · Cited by 616
Toward a typological theory of project management
Shenhar, A. J., & Dvir, D. (1996) · Research Policy · doi:10.1016/0048-7333(95)00877-2 · Cited by 614
Variations in Critical Success Factors Over the Stages in the Project Life Cycle
Pinto, J. K., & Prescott, J. E. (1988) · Journal of Management · doi:10.1177/014920638801400102 · Cited by 581
Factors affecting cost performance: evidence from Indian construction projects
Iyer, K. C., & Jha, K. N. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.10.003 · Cited by 504
Williams, T. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.856572 · Cited by 456
Risk management in ERP project introduction: Review of the literature
Aloini, D., Dulmin, R., & Mininno, V. (2007) · Information & Management · doi:10.1016/j.im.2007.05.004 · Cited by 423
In search of project classification: a non-universal approach to project success factors
Dvir, D., Lipovetsky, S., Shenhar, A., & Tishler, A. (1998) · Research Policy · doi:10.1016/s0048-7333(98)00085-7 · Cited by 423
Success Criteria and Factors for International Development Projects: A Life-Cycle-Based Framework
Khang, D. B., & Moe, T. L. (2008) · Project Management Journal · doi:10.1002/pmj.20034 · Cited by 394
Evaluation of ecological engineering of “armoured” shorelines to improve their value as habitat
Chapman, M. G., & Underwood, A. J. (2011) · Journal of Experimental Marine Biology and Ecology · doi:10.1016/j.jembe.2011.02.025 · Cited by 378
Project Work: The Legacy of Bureaucratic Control in the Post-Bureaucratic Organization
Hodgson, D. E. (2004) · Organization · doi:10.1177/1350508404039659 · Cited by 355
The changing paradigms of project management
Pollack, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.08.002 · Cited by 347
XIA, W., & LEE, G. (2005) · Journal of Management Information Systems · doi:10.1080/07421222.2003.11045831 · Cited by 339
The maturity of project management in different industries
Cooke-Davies, T. J., & Arzymanow, A. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00084-4 · Cited by 336
The construction firm and the construction project: a transaction cost approach
Winch, G. (1989) · Construction Management and Economics · doi:10.1080/01446198900000032 · Cited by 290
Managing global megaprojects: Complexity and risk management
Kardes, I., Ozturk, A., Cavusgil, S. T., & Cavusgil, E. (2013) · International Business Review · doi:10.1016/j.ibusrev.2013.01.003 · Cited by 278
Raymond, L., & Bergeron, F. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.06.002 · Cited by 273
Success of Projects in Different Organizational Conditions
Hyväri, I. (2006) · Project Management Journal · doi:10.1177/875697280603700404 · Cited by 261
PROJECT PERFORMANCE AND THE LOCUS OF INFLUENCE IN THE R&D MATRIX.
Katz, R., & Allen, T. J. (1985) · Academy of Management Journal · doi:10.2307/256062 · Cited by 257
What Project Strategy Really Is: The Fundamental Building Block in Strategic Project Management
Patanakul, P., & Shenhar, A. J. (2012) · Project Management Journal · doi:10.1002/pmj.20282 · Cited by 147
Competency mapping in project management: An action research study in an engineering company
Takey, S. M., & Carvalho, M. M. D. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.10.013 · Cited by 141
Metadata
- Authors
- Schmidt, R. N., Cleland, D. I., & King, W. R.
- Venue
- Administrative Science Quarterly
- Publisher
- JSTOR
- Published
- 1969-12
- Volume
- 14
- Issue
- 4
- Pages
- 612
- ISSN
- 0001-8392 (ISSN-L)
- OpenAlex
- W2084961059
- Cited by
- 411
- References
- 0
- FWCI
- 8.11
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.