Optimization-Based Scheduling Method for Agile Earth-Observing Satellite Constellation
Open accessAbstract
This Paper proposes a two-step binary linear programming formulation for task scheduling of a constellation of low-Earth-orbit satellites and demonstrates its applicability and scalability to obtain high-quality solutions using a standard mixed-integer linear programming solver. In this instance, the goal of satellite constellation task scheduling is to allocate each task for the satellites and to determine the task starting times in order to maximize the overall mission performance metric. The scheduling problem is formulated to find the solution by first finding a set of candidate communication time intervals for each satellite/ground-station pair as one of the key constraints and time tabling the observation task to acquire the user-requested data, with the incorporation of key constraints for satellite constellation operation. Numerical experiments are designed for investigating the trends, sensitivity, and characteristics of scheduling outputs based on multiple representative instances. The performance of the scheduling solutions by the proposed two-step binary linear programming method exhibits significant improvement of up to 35% in the number of assignments and the sum of profits over the general greedy algorithm.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
0 of 8 cited sources checked · 0 supported · 0 flagged
- Findingown data
For a constellation of up to 50 satellites at 500 km altitude with a minimum elevation angle greater than 5 degrees, the ground-control center can see only one satellite at a time.
“For a constellation of up to 50 satellites, only a single satellite can be seen from the ground-control center with the orbit altitude set as 500 km and the minimum elevation angle at which the ground station can communicate with the satellite greater than 5 deg.”
Quote in the paperSubstantial claim - Findingown data
The number of observation tasks assigned to satellite scheduling increased as the numbers of given tasks and ground stations increased.
“Figure 9 reveals that the number of observation tasks assigned to satellite scheduling increased as the numbers of given tasks and ground stations increased.”
Quote in the paperNot a substantial claim - Findingown data
Most instances exhibited a similar pattern in how the upper bounds and solution values changed.
“We found that most instances had a similar tendency on a change of the upper bounds and solution values.”
Quote in the paperSubstantial claim - Findingown data
When the number of tasks exceeds 500, the calculation usually finishes without finding the optimal solution.
“When the number of tasks is more than 500, the calculation is completed without finding the optimal solution in most cases.”
Quote in the paperNot a substantial claim - Findingown data
Among the parameters in Table 1, the number of observation tasks has the strongest effect on computation time.
“Among the parameters in Table 1, the number of observation tasks has the greatest influence on computation time.”
Quote in the paperNot a substantial claim
- Findingreasoning
There was little difference between the cases with three and four ground stations in each instance.
“Little difference was found between the cases of three and four ground stations in each instance because the position of the fourth ground station was intentionally positioned near to the second station, and only a few observation tasks existed between them.”
Quote in the paperNot a substantial claim - Findingown data
The proposed two-step binary linear programming scheduling method improves the number of task assignments by up to 35% compared with a general greedy algorithm.
“The performance of the scheduling solutions by the proposed two-step binary linear programming method exhibits significant improvement of up to 35% in the number of assignments and the sum of profits over the general greedy algorithm.”
Quote in the paperSubstantial claim- The authors state this as an assumption: All parameters needed for task scheduling, including the satellite orbits, are assumed to be known beforehand.
- Findingown data
The proposed two-step binary linear programming scheduling method improves the sum of profits by up to 35% compared with a general greedy algorithm.
“The performance of the scheduling solutions by the proposed two-step binary linear programming method exhibits significant improvement of up to 35% in the number of assignments and the sum of profits over the general greedy algorithm.”
Quote in the paperSubstantial claim- The authors state this as an assumption: All parameters needed for task scheduling, including the satellite orbits, are assumed to be known beforehand.
- Findingown data
Initially, the objective values quickly approach the optimal value until the computation time reaches 10^2 seconds.
“In the beginning, the objective values rapidly approach the optimal value until t is 10 2 .”
Quote in the paperNot a substantial claim - Findingown data
The download interval scheduling problem was solved in only a few seconds even for the largest instance.
“Because the download interval scheduling problem took only a few seconds even on the largest instance, the computation time will be addressed only in the constellation mission scheduling problem.”
Quote in the paperSubstantial claim - Findingreasoning
Regardless of the weight values assigned, an appropriate scheduling solution was obtained even in the extreme case where one weight value was 0.
“No matter which values were assigned in the weights, we confirmed that an appropriate scheduling solution was obtained even for the extreme case in which one of the values was 0.”
Quote in the paperSubstantial claim - Findingown data
The paper's method scaled to 12 satellites and 700 observation tasks.
“This Paper's method scaled up to 12 satellites and 700 observation tasks.”
Quote in the paperSubstantial claim - Findingown data
When the weight values were biased toward particular tasks, the resulting performance was as poor as that of the greedy algorithm.
“It is confirmed that the performance of the result was as poor as the result of the greedy algorithm when the values were biased to specific tasks.”
Quote in the paperNot a substantial claim - Findingown data
When the data transmission rate was low because of a bottleneck, the results varied linearly with the number of ground stations.
“In addition, the results show a linearity depending on the number of ground stations when the data transmission rate was low due to a bottleneck.”
Quote in the paperNot a substantial claim - Findingown data
The numerical studies demonstrated an improvement of up to 35% over traditional greedy methods.
“showed an improvement up to 35% over traditional greedy methods.”
Quote in the paperSubstantial claim - Premisenone given
The authors found no prior work that addressed agile satellite constellation scheduling with both download and energy constraints in a continuous-time setting.
“Although many studies exist to solve different kinds of scheduling problems, we are unaware of any studies that considered the agile satellite constellation scheduling problem with download and energy constraints in a continuous domain.”
Quote in the paperNot a substantial claim - Premisecitation
Most studies on satellite scheduling have focused on finding suboptimal solutions using heuristic algorithms.
“Because of the difficulties described previously, most studies have concentrated on finding suboptimal solutions with heuristic algorithms [7,[10][11][12][13][14], although satellite applications require highly efficient schedule solutions to obtain more data.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites [7,[10][11][12][13][14]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationreasoning
The increase in assigned tasks with more ground stations occurred because additional ground stations provided more opportunities to free data storage space through transmission.
“The values increased as the number of ground stations increased because the opportunity to secure data storage space increased through data transmission.”
Quote in the paperSubstantial claim - Interpretationreasoning
The scheduling problem is divided into two subproblems to reduce complexity while maintaining output quality.
“To reduce the complexity while maintaining the quality of the output from the scheduling problem, the scheduling problem is divided into two subproblems:”
Quote in the paperSubstantial claim- The authors state this as an assumption: The separation of download scheduling and mission scheduling assumes that a suitable mechanism exists to choose the ground-control center for each satellite download task.
- Premisenone given
The literature has not yet handled the simultaneous consideration of precedence conditions and multiple release-time and deadline pairs for each task in the scheduling problem, even for a single agent.
“However, consideration of the precedence condition and multiple release times and deadlines pairs for each task simultaneously in the scheduling problem has not yet been handled in the literature even for a single agent.”
Quote in the paperNot a substantial claim - Premisecitation
Using constellations of small satellites can improve temporal and geographic coverage at a lower unit cost than typical Earth observation satellite systems.
“A new approach using constellations of small satellites can improve temporal and geographic coverage at a lower unit cost [1][2][3].”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites [1][2][3]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationreasoning
The proposed model shows a large improvement over the greedy algorithm when the problem instance is complicated.
“In general, the proposed model demonstrates a huge improvement compared to the greedy algorithm when the problem instance becomes complicated.”
Quote in the paperSubstantial claim - Interpretationnone given
In a Walker-Delta constellation with tens of satellites, multiple satellites are unlikely to be within one ground station's communication range.
“For a constellation of tens of satellites in the Walker-Delta pattern, it is not very likely that multiple satellites are in the communication range of a ground station.”
Quote in the paperNot a substantial claim - Interpretationreasoning
The growing difference between the two methods occurred because, as the number of given observation tasks increased, many tasks were close together and their time windows overlapped.
“This occurred because, from the moment when the number of given observation tasks increased, there were many tasks in which the positions were close to each other and the time window overlapped.”
Quote in the paperSubstantial claim - Interpretationown data
In the extreme instance, the per-satellite setup time was the primary reason for the difference in objective values between the greedy algorithm and the TSBLP method.
“The setup time of each satellite was the main cause of the difference in objective values.”
Quote in the paperNot a substantial claim- The authors state this as an assumption: In the extreme-instance analysis, the satellite's initial pitch and roll angles were assumed to be zero so that it pointed at the nadir.
- Premisecitation
The power-generation level of the solar panel is known to increase linearly over several tens of seconds.
“As for condition 3, it is known that the power-generation level of the solar panel increases linearly over several tens of seconds [60,61].”
Quote in the paperSubstantial claim0 of 2 sources checked- cites [60] 60. "Measuring Power Generation of Solar Panels on a Satellite," American Geological Inst., Pennsylvania, 2018, http://help.agi.com/stk/index.htm#training/ SeasonalPower.htm.
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [61] 61. Tsiotras, P., Shen, H., and Hall, C., "Satellite Attitude Control and Power Tracking with Energy/Momentum Wheels," Journal of Guidance, Control, and Dynamics, Vol. 24, No. 1, 2001, pp. 23-34. doi:10.2514/2.4705 source
- Interpretationreasoning
That appropriate solution in the extreme case with one zero weight was due to the satellites' data storage constraint.
“This is due to the data storage constraint for the satellites.”
Quote in the paperSubstantial claim - Interpretationreasoning
To carry out as many observation tasks as possible, the satellite must free data space by downloading.
“To perform as many observation tasks as possible, the data space must be secured through the download.”
Quote in the paperSubstantial claim - Interpretationreasoning
Similarly, a download task can be carried out when observation tasks have accumulated data.
“In the same manner, the download task can be performed if the data are accumulated by performing the observation tasks.”
Quote in the paperSubstantial claim - Study design and conductown data
The authors verified that the energy level remained nonnegative for all scheduling outputs.
“Although not shown in Sec.V, we verified for all the scheduling outputs that the energy level remained nonnegative.”
Quote in the paperNot a substantial claim - Interpretationown data
To raise the number of assigned tasks or the objective function within a fixed planning horizon, the task weights used in Eq. (9) should be assigned uniformly across tasks.
“To increase the number of tasks to be assigned or the objective function in the same length of the planning horizon, assigning the weight value used in Eq. ( 9) uniformly for each task is needed.”
Quote in the paperSubstantial claim
- Classified as probably not a substantial claim. 14
- May combine two claims. 13
Probably not a substantial claim: may not pass S3 (load-bearing).
Findingown dataA clear trend depending on the number of tasks and satellites is visible in the upper plot of Fig. 8.
“A clear trend depending on the number of tasks and satellites is shown in the upper plot of Fig. 8.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingown dataThe proposed two-step binary linear programming formulation for scheduling a low-Earth-orbit satellite constellation can be solved with a standard mixed-integer linear programming solver to obtain high-quality solutions and is applicable and scalable to representative instances.
“This Paper proposes a two-step binary linear programming formulation for task scheduling of a constellation of low-Earth-orbit satellites and demonstrates its applicability and scalability to obtain high-quality solutions using a standard mixed-integer linear programming solver.”
Quote in the paperSubstantial claim- The authors state this as an assumption: All parameters needed for task scheduling, including the satellite orbits, are assumed to be known beforehand.
May combine two claims.
Findingown dataAfter 10^2 seconds, only the upper bounds from LP relaxation are tightened as time increases, while the best-known solution values change little.
“After that, only the upper bounds from LP relaxation are tightened as the time increases and the best-known solution values have little change.”
Quote in the paperSubstantial claimMay combine two claims.
Findingown dataThe optimal solution is found within a reasonable time for up to approximately 400 tasks, and for up to 500 tasks the optimal solution is found within the time limit when there are up to three satellites.
“Through both plots, it can be seen that the optimal solution is found within a reasonable time until the number of tasks is approximately 400, and up to 500 tasks, the optimal solution is found within the time limit up to three satellites.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Findingown dataThe FIFO algorithm solved the largest instance in less than one second.
“We also excluded the computation time of the FIFO algorithm because the largest instance was solved in under 1 s.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Findingnone givenIn the simulation, most time intervals used for the data and energy constraints were set to be similar to or shorter than the processing time.
“In the simulation, most time intervals used to set the data and energy constraints are set to be similar to or shorter than the processing time, which can be an answer for condition 4.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingown dataIn that extreme instance, the greedy algorithm first included task 1, then scheduled task 4 rather than task 3 because task 3 could not be executed due to a large roll-angle difference, and afterward scheduled task 7 rather than task 6.
“In the case of the greedy algorithm, task 1, which was the first to be encountered by a satellite, was included in the schedule at first, and the satellite controlled its attitude to the left side.After task 1, task 4 with a small setup time was scheduled instead of task 3, which was inexecutable because of the huge roll angle difference.Likewise, after task 4, task 7 was scheduled instead of task”
Quote in the paperNot a substantial claim- The authors state this as an assumption: In the extreme-instance analysis, the satellite's initial pitch and roll angles were assumed to be zero so that it pointed at the nadir.
May combine two claims.
Findingown dataIn the same extreme instance, the TSBLP method rotated the satellite to the right and scheduled more tasks than the greedy algorithm.
“On the contrary, in the case of the TSBLP method, the satellite turned to the right to schedule more tasks than the greedy algorithm.”
Quote in the paperNot a substantial claim- The authors state this as an assumption: In the extreme-instance analysis, the satellite's initial pitch and roll angles were assumed to be zero so that it pointed at the nadir.
May combine two claims.
FindingreasoningThe two methods showed little difference until 200 given tasks, but the difference then grew gradually, reaching up to 30% for the number of assigned tasks and 35% for the objective value.
“There was little difference between the results of the two methods until the number of the given tasks was 200, but the difference increased gradually up to 30% for the number of assigned tasks and 35% for the objective value.”
Quote in the paperSubstantial claimMay combine two claims.
Findingown dataAs the number of overlaps grew, the problem instance became more complex and the greedy algorithm's performance worsened, in contrast to the case where only the number of tasks increased.
“we confirmed that the complexity of the problem instance increased and the performance of the greedy algorithm is degraded as the overlaps increased as opposed to when only the number of tasks increased.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingown dataFor given numbers of observation tasks, the mean order of overlap and the standard deviation of overlap were approximately: 100 tasks: mean 1.53, std 0.23; 200 tasks: mean 1.93, std 0.44; 300 tasks: mean 2.26, std 0.58; 500 tasks: mean 2.94, std 0.91; 700 tasks: mean 3.44, std 1.18.
“According to the given number of observation tasks, the mean order of overlap and the standard of overlap are approximately as follows (number-mean, std): (100-1.53,0.23), (200-1.93,0.44), (300-2.26,0.58), (500-2.94,0.91), (700-3.44,1.18).”
Quote in the paperNot a substantial claimMay combine two claims.
Findingown dataWith 700 observation tasks and a 2-day planning horizon, rewards did not increase substantially once the data transfer rate exceeded 0.6, and the gap to the unrestricted model stayed around 30-35%.
“Because of the data and energy constraints, the rewards did not substantially increase when the data transfer rate exceeded 0.6, and the gap with the unrestricted model was maintained around 30-35%.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingown dataWith 700 observation tasks, 4 ground stations, and a 1-day planning horizon, the result values rose as the number of satellites increased, and the average gap between methods was about 30%.
“The result values were increased as the number of satellites increased, and the average gap between each method was around 30%.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Premisenone givenThe authors are unaware of any studies that explicitly study the satellite constellation scheduling problem as formulated in this paper.
“Although much work has focused on the scheduling problem, we are unaware of any studies explicitly studying the problem as formulated in this Paper.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Premisenone givenMany formulations and approaches in the reviewed satellite operation scheduling literature ignored important constraints such as energy and data.
“Generally, many of the formulations and approaches in the reviewed papers dealing with satellite operation scheduling problems ignored important constraints, such as energy and data.”
Quote in the paperNot a substantial claimMay combine two claims.
PremisecitationThe simplest version of either satellite communication scheduling or observation scheduling is NP-hard, and finding optimal solutions becomes extremely difficult as problem size grows.
“The simplest version of either problem belongs to the NP-hard (non-deterministic polynomial-time hard) class [8,9], and it is extremely difficult to obtain the optimal solution as the size of the problem increases.”
Quote in the paperSubstantial claim0 of 2 sources checked- cites [8] 8. Garey, M. R., and Johnson, D. S., Computers and Intractability: A Guide to the Theory of NP-Completeness, Macmillan Higher Education, 1979. Algorithm 1 FIFO Greedy Algorithm Input: Download candidate intervals, information about satellites, and observation tasks Output: Constellation mission schedulings for each satellite 1: procedure SCHEDULEFIFO 2: for each satellite s, do 3: Initialize data and energy value 4: Plan s ←fg ⊳Plan s : schedule of satellite s 5: end for 6: TW O ← ∪ j∈J;s∈S TW O j;s ⊳TW O : universal set of observation time windows 7: Sort TW O in time ascending order 8: t←0 9
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [9] 9. Barbulescu, L., Watson, J.-P., Whitley, L. D., and Howe, A. E., "Scheduling Space-Ground Communications for the Air Force Satellite Control Network," Journal of Scheduling, Vol. 7, No. 1, 2004, pp. 7-34. doi:10.1023/B:JOSH.0000013053.32600.3c source
Probably not a substantial claim: may not pass S2 (checkable).
PremisereasoningTo construct the satellite scheduling problem realistically, more constraints and practical inputs, including parameters for operating the satellite constellation system, are needed.
“To construct the problem realistically, more constraints and practical inputs are needed, including parameters for operating the system of the satellite constellation.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationThe most common approach in previous satellite scheduling studies is a greedy algorithm with task priorities.
“The most common approach is a greedy algorithm with task priorities [7,[10][11][12][13][14].”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites [7,[10][11][12][13][14]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
Interpretationown dataThe small difference between three and four ground stations arose because the fourth station was intentionally placed near the second station, and few observation tasks existed between them.
“Little difference was found between the cases of three and four ground stations in each instance because the position of the fourth ground station was intentionally positioned near to the second station, and only a few observation tasks existed between them.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationMore recent work has broadened the scheduling problem to include data routing or energy constraints.
“In a different way, recent studies have tended to expand the existing scheduling problem considering data routing or energy constraints.[2,9,[53][54][55][56][57][58].”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites [2,9,[53][54][55][56][57][58]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Premisenone givenMost studies on scheduling Earth observation satellites concentrated on the single-satellite problem.
“Numerous studies have been developed on scheduling EOSs, and most of them concentrated on the single-satellite problem.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Interpretationnone givenFor the negative energy phenomenon to occur, the battery energy level must be close to zero.
“1) The energy level of the battery should be close to zero.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Interpretationnone givenFor the negative energy phenomenon to occur, the processing time must be shorter than the given time interval.
“4) The processing time must be shorter than the given time interval.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
InterpretationreasoningFor the negative energy phenomenon to occur, the energy generated must change rapidly.
“3) The energy generated must change rapidly.”
Quote in the paperNot a substantial claimMay combine two claims.
Interpretationown dataThese values are not representative because tasks are heavily concentrated in a specific part of the Earth, so no time window exists for most of the planning horizon.
“In general, however, the given values are not representative because the tasks are heavily crowded on a specific part of the Earth, so a time window does not exist on most of the planning horizon (the upper plot of Fig. 10).”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Interpretationnone givenFor the negative energy phenomenon to occur, the energy consumption per unit time must exceed the amount generated by the solar panel.
“2) The energy consumption per unit time should be higher than the amount generated by the solar panel.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
InterpretationreasoningA feasible solution from the previous model can have a negative energy level if a download or observation task and solar energy generation together cause a sharply nonlinear change in energy within a time interval.
“The energy level of a feasible solution from the previous model can be thought to be negative if a download or observation task and energy generation via a solar panel together lead to a sharply nonlinear change of energy value in a certain time interval.”
Quote in the paperNot a substantial claim
The authors state this as an assumption.
For wide-area coverage requests, the mission center is assumed to divide the region of interest into several strips.
“For the wide-area coverage mode, it is assumed that the mission center appropriately divides the region of interest into several strips.”
The authors state this as an assumption.
For requests with multiple image strips, each strip is assumed to be weighted in proportion to its expected image acquisition time.
“for the request consisting of multiple image strips, it is assumed that each strip is weighted proportionally to the expected image acquisition time, also known as the processing time.”
The authors state this as an assumption.
For each ground station, data are assumed to be downloaded from only one satellite during a pass.
“For each ground station, we assume that data are downloaded from a single satellite as it passes over the station.”
The authors state this as an assumption.
Tasks are nonpreemptive: once a satellite starts a task, it cannot be interrupted before the task finishes.
“In this Paper, tasks are nonpreemptive; in other words, once a satellite begins to execute a certain task, it cannot be interrupted by another task until completion of the first task.”
The authors state this as an assumption.
The setup time between two observation tasks is assumed to be determined by the difference in their roll angles.
“While the detailed quantification of the setup time involves knowledge of full attitude dynamics of the satellite and the associated controllers, this Paper assumes that the setup time between two observation tasks is represented in terms of the differences in the roll angles.”
The authors state this as an assumption.
The setup time between two download tasks is assumed to depend mainly on the difference in the antenna roll angles at the ground station.
“It is primarily dependent on the differences in the roll angles of the antenna on the ground station.”
The authors state this as an assumption.
The minimum allowable onboard data storage is assumed to be zero.
“The storage has a certain positive minimum and maximum allowable data limit denoted as d min and d max , where d min is assumed to be 0.”
The authors state this as an assumption.
The separation of download scheduling and mission scheduling assumes that a suitable mechanism exists to choose the ground-control center for each satellite download task.
“This separation of the download scheduling and mission scheduling assumes that there exists an appropriate mechanism to determine the ground-control center for each download task of a satellite.”
The authors state this as an assumption.
All parameters needed for task scheduling, including the satellite orbits, are assumed to be known beforehand.
“To solve the TSBLP problem, all related parameters for task scheduling including the satellite orbits are assumed to be known in advance.”
The paper relies on this without support.
If several ground stations are within a satellite's communication range, using a simple heuristic to select the ground station is assumed not to cause significant performance loss.
“In case there are multiple ground stations within the communication range of a satellite, a simple heuristic to choose the ground station would not incur significant performance degradation.”
The paper relies on this without support.
Satellite applications need highly efficient schedules to collect more data.
“although satellite applications require highly efficient schedule solutions to obtain more data.”
The paper relies on this without support.
Satellite communication scheduling and observation scheduling are strongly linked through resource use, and their solutions depend on each other.
“These problems are strongly connected to each other in terms of the resource usage (e.g., time and energy), and their solutions are interdependent.”
The authors state this as an assumption.
In the extreme-instance analysis, the satellite's initial pitch and roll angles were assumed to be zero so that it pointed at the nadir.
“the initial pitch and roll angle were assumed to be 0 for the satellite to point to the nadir.”
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
Each contradiction between two passages listed here was confirmed by an independent check.
Data-transfer-rate results point to two different figures
MinorThe results paragraph identifies Fig. 13 as showing the data-transfer-rate comparison, but then directs readers to the upper plot of Fig. 12 for a comparison in that discussion. The figure captions identify Fig. 12 as the satellite-count comparison and Fig. 13 as the data-transfer-rate comparison.
“The value of the unrestricted model is drawn as red bars on the upper plot of Fig. 12 for comparison.”
“Fig. 13 Comparison of the results with different data transfer rates.”
Unrestricted-model plot is attributed to the wrong figure
MinorThe data-transfer-rate plot is identified as Fig. 13 and shows the unrestricted series, but the accompanying description directs readers to Fig. 12 for that series.
“The value of the unrestricted model is drawn as red bars on the upper plot of Fig. 12 for comparison.”
“Unrestricted TSBLP-GS1 TSBLP-GS2 TSBLP-GS3 TSBLP-GS4 FIFO-GS1 FIFO-GS2 FIFO-GS3 FIFO-GS4 0 2000 4000 6000 8000 10000 Objective function value 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0.1 Data transfer rate (data/s) 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 TSBLP-GS1 TSBLP-GS2 TSBLP-GS3 TSBLP-GS4 FIFO-GS1 FIFO-GS2 FIFO-GS3 FIFO-GS4 Fig. 13 Comparison of the results with different data transfer rates.”
Data and energy levels are assigned opposite interval endpoints
MinorThe nomenclature defines both levels at the end of an interval, but the constraint descriptions place them at its beginning.
“d i s , e i s = amount of data and energy at end of i s”
“Constraints (19) show that the amount of data stored at the beginning of each interval is inside the lower and upper limits.Constraints (20) represent the amount of data stored at the beginning of each interval equal to the amount stored at the start of the preceding interval plus the amount acquired by scheduled observation tasks minus the amount downloaded to the ground stations.”
Cites
(1979) · Cited by 43,841 · see citing works
Journal of the British interplanetary society
Sagan, C. (1975) · Icarus · doi:10.1016/0019-1035(75)90171-2 · Cited by 1,289 · see citing works
Handbook of Scheduling: Algorithms, Models, and Performance Analysis
(2004) · Cited by 1,218 · see citing works
Selecting and scheduling observations of agile satellites
Lemaı̂tre, M., Verfaillie, G., Jouhaud, F., Lachiver, J.-M., & Bataille, N. (2002) · Aerospace Science and Technology · doi:10.1016/s1270-9638(02)01173-2 · Cited by 472 · see citing works
Three Scheduling Algorithms Applied to the Earth Observing Systems Domain
Wolfe, W. J., & Sorensen, S. E. (2000) · Management Science · doi:10.1287/mnsc.46.1.148.15134 · Cited by 318 · see citing works
Bianchessi, N., Cordeau, J., Desrosiers, J., Gilbert Laporte, A., & Raymond, V. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2005.12.026 · Cited by 255 · see citing works
Vasquez, M., & Hao, J.-K. (2001) · Computational Optimization and Applications · doi:10.1023/a:1011203002719 · Cited by 239 · see citing works
Scheduling Space–Ground Communications for the Air Force Satellite Control Network
Barbulescu, L., Watson, J.-P., Whitley, L. D., & Howe, A. E. (2004) · Journal of Scheduling · doi:10.1023/b:josh.0000013053.32600.3c · Cited by 232 · see citing works
Naval Research Logistics (NRL)
Banks, D., Ceyhan, E., Johnson, L., & Zhou, L. (2006) · Naval Research Logistics (NRL) · doi:10.1002/(issn)1520-6750 · Cited by 215 · see citing works
Wang, P., Reinelt, G., Gao, P., & Tan, Y. (2011) · Computers & Industrial Engineering · doi:10.1016/j.cie.2011.02.015 · Cited by 198 · see citing works
A Lagrangian heuristic for satellite range scheduling with resource constraints
Marinelli, F., Nocella, S., Rossi, F., & Smriglio, S. (2011) · Computers & Operations Research · doi:10.1016/j.cor.2011.01.016 · Cited by 178 · see citing works
Satellite Attitude Control and Power Tracking with Energy/Momentum Wheels
Tsiotras, P., Shen, H., & Hall, C. (2001) · Journal of Guidance, Control, and Dynamics · doi:10.2514/2.4705 · Cited by 173 · see citing works
Daily imaging scheduling of an earth observation satellite
Lin, W.-C., Liao, D.-Y., Liu, C.-Y., & Lee, Y.-Y. (2005) · IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans · doi:10.1109/tsmca.2005.843380 · Cited by 173 · see citing works
Earth Observation Satellite Management
Bensana, E., Lemaı̂tre, M., & Verfaillie, G. (1999) · Constraints · doi:10.1023/a:1026488509554 · Cited by 170 · see citing works
Maximizing the value of an Earth observation satellite orbit
Cordeau, J.-F., & Laporte, G. (2005) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601926 · Cited by 150 · see citing works
Optimization-Based Scheduling for the Single-Satellite, Multi-Ground Station Communication Problem
Spangelo, S., Cutler, J., Gilson, K., & Cohn, A. (2015) · Computers & Operations Research · doi:10.1016/j.cor.2014.11.004 · Cited by 120 · see citing works
Genetic Algorithms for Satellite Scheduling Problems
Xhafa, F., Sun, J., Barolli, A., Biberaj, A., & Barolli, L. (2012) · Mobile Information Systems · doi:10.1155/2012/717658 · Cited by 108 · see citing works
Distributed Earth Satellite Systems: What Is Needed to Move Forward?
Selva, D., Golkar, A., Korobova, O., Cruz, I. L. I., Collopy, P., & de Weck, O. L. (2017) · Journal of Aerospace Information Systems · doi:10.2514/1.i010497 · Cited by 97 · see citing works
Wang, J., Demeulemeester, E. L., & Qiu, D. (2016) · Computers & Operations Research · doi:10.1016/j.cor.2016.04.014 · Cited by 95 · see citing works
Wu, G., Ma, M., Zhu, J., & Qiu, D. (2012) · Journal of Systems Engineering and Electronics · doi:10.1109/jsee.2012.00089 · Cited by 68 · see citing works
A constraint-based approach to satellite scheduling
Pemberton, J. C., & Galiber (2001) · DIMACS series in discrete mathematics and theoretical computer science · doi:10.1090/dimacs/057/06 · Cited by 65 · see citing works
A new dominance rule to minimize total weighted tardiness with unequal release dates
Akturk, M. S., & Ozdemir, D. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(00)00319-2 · Cited by 54 · see citing works
A Dynamic Scheduling Method of Earth‐Observing Satellites by Employing Rolling Horizon Strategy
Dishan, Q., He, C., Jin, L., & Ma, M. (2013) · The Scientific World JOURNAL · doi:10.1155/2013/304047 · Cited by 53 · see citing works
The Large Benefits of Small‐Satellite Missions
Baker, D. N., & Worden, S. P. (2008) · Eos, Transactions American Geophysical Union · doi:10.1029/2008eo330001 · Cited by 52 · see citing works
Tanaka, S., & Fujikuma, S. (2012) · Journal of Scheduling · doi:10.1007/s10951-011-0242-0 · Cited by 52 · see citing works
Augenstein, S., Estanislao, A., Guere, E., & Blaes, S. (2016) · Proceedings of the International Conference on Automated Planning and Scheduling · doi:10.1609/icaps.v26i1.13784 · Cited by 51 · see citing works
An exact approach to minimizing total weighted tardiness with release dates
SELIM AKTURK, M., & OZDEMIR, D. (2000) · IIE Transactions · doi:10.1080/07408170008967464 · Cited by 46 · see citing works
A Genetic Algorithm Approach to Automating Satellite Range Scheduling
Parish, D. A. (1994) · Defense Technical Information Center (DTIC) · Cited by 43 · see citing works
Guohua, Wu, Manhao, Ma, ±., Jianghan, Жу, Dishan, & Qiu, G. (2012) · Journal of Systems Engineering and Electronics · Cited by 38 · see citing works
Multi-Satellite Scheduling Using Genetic Algorithms
Soma, P., Venkateswarlu, S., Santhalakshmi, S., Bagchi, T. P., & Kumar, S. (2004) · SpaceOps Conference (SpaceOps) · doi:10.2514/6.2004-743-515 · Cited by 30 · see citing works
Minimizing Total Weighted Tardiness on a Single Machine with Release Dates and Equal-Length Jobs
van den Akker, J. M., Diepen, G., & Hoogeveen, J. A. (2010) · Journal of Scheduling · doi:10.1007/s10951-010-0181-1 · Cited by 30 · see citing works
Hybrid Algorithms for Satellite Imaging Scheduling
Lin, W.-C., & Chang, S.-C. (2006) · 2005 IEEE International Conference on Systems, Man and Cybernetics · doi:10.1109/icsmc.2005.1571527 · Cited by 27 · see citing works
(2014) · Digital Commons - USU (Utah State University) · Cited by 24 · see citing works
A Tabu Search Algorithm for Satellite Imaging Scheduling
Lin, W.-C., & Liao, D.-Y. (2005) · 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583) · doi:10.1109/icsmc.2004.1399860 · Cited by 24 · see citing works
Satellite image collection optimization
Martin, W. (2002) · Optical Engineering · doi:10.1117/1.1495856 · Cited by 20 · see citing works
Performance Analysis of Algorithms for Coordination of Earth Observation by CubeSat Constellations
Kennedy, A. K., & Cahoy, K. L. (2017) · Journal of Aerospace Information Systems · doi:10.2514/1.i010426 · Cited by 12 · see citing works
Constraint Programming and Large Scale Discrete Optimization
Freuder, E. C., & Wallace, R. J. (2001) · DIMACS series in discrete mathematics and theoretical computer science · doi:10.1090/dimacs/057 · Cited by 12 · see citing works
An exact approach to minimizing total weighted tardiness with release dates
Aktürk, M. S., & Özdemir, D. (2000) · IIE Transactions · doi:10.1023/a:1013741325877 · Cited by 11 · see citing works
DMTRH: A Real-Time Scheduling Algorithm for Multiple Earth Observation Satellites
Wang, J., Zhu, X., Zhu, J., Ma, M., & Yang, L. T. (2012) · IEEE International Conference on High Performance Computing and Communications; IEEE International Conference on Smart City; IEEE International Conference on Data Science and Systems (HPCC/SmartCity/DSS) · doi:10.1109/hpcc.2012.96 · Cited by 10 · see citing works
Optimal Continuous-Time Job Scheduling for Multiple Low Earth Orbit Satellites
Cho, D.-H., Kim, H.-Y., & Choi, H.-L. (2016) · AIAA Guidance, Navigation, and Control Conference · doi:10.2514/6.2016-2107 · Cited by 9 · see citing works
Self-citationBaek, S., Cho, K.-R., Lee, D.-W., & Kim, H. (2010) · Journal of the Korean Society for Aeronautical & Space Sciences · doi:10.5139/jksas.2010.38.1.048 · Cited by 9 · see citing works
On the Normed Space of Equivalence Classes of Fuzzy Numbers
Qiu, D., Lu, C., & Zhang, W. (2013) · TheScientificWorldJournal · doi:10.1155/2013/792484 · Cited by 6 · see citing works
Satellite mission scheduling algorithm based on GA
Sun, B., Mao, L., Wang, W., et al. (2007) · Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE · doi:10.1117/12.772982 · Cited by 3 · see citing works
Satellite mission scheduling using genetic algorithm
Han, S.-M., Beak, S.-W., Cho, K.-R., et al. (2008) · 2008 SICE Annual Conference · doi:10.1109/sice.2008.4654845
Multi-satellite control system architecture and mission scheduling optimization
Jung-Hyun, L., Myung, W. S., Chung, D., et al. (2012) · 2012 IEEE Aerospace Conference · doi:10.1109/aero.2012.6187437
Study on Heuristic Algorithm for Dynamic Scheduling Problem of Earth Observing Satellites
Wang, J.-M., Li, J.-F., & Tan, Y.-J. (2007) · Eighth ACIS International Conference on Software Engineering, Artificial Intelligence, Networking, and Parallel/Distributed Computing (SNPD 2007) · doi:10.1109/snpd.2007.128
RADARSAT constellation, project objectives and status
Seguin, G., & Ahmed, S. (2009) · 2009 IEEE International Geoscience and Remote Sensing Symposium · doi:10.1109/igarss.2009.5418242
Qin, J., Liu, Y., Mao, X., et al. (2013) · MILCOM 2013 - 2013 IEEE Military Communications Conference · doi:10.1109/milcom.2013.308
Genetic Algorithm for TDRS Communication Scheduling with Resource Constraints
Wei, Z., Xin, M., & Huan, H. (2008) · 2008 International Conference on Computer Science and Software Engineering · doi:10.1109/csse.2008.1119
Flagged first, then by citations
Cited by
Sorted by citations
Wang, X., Wu, G., Xing, L., & Pedrycz, W. (2021) · IEEE Systems Journal · doi:10.1109/jsyst.2020.2997050 · Cited by 260 · see citing works
Song, Y., Wei, L., Yang, Q. S., Wu, J. D., Xing, L., & Chen, Y. (2023) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2023.101236 · Cited by 187 · see citing works
Han, C. S., Gu, Y., Wu, G., & Wang, X. (2022) · IEEE Transactions on Systems Man and Cybernetics Systems · doi:10.1109/tsmc.2022.3220534 · Cited by 86 · see citing works
Reinforcement Learning for the Agile Earth-Observing Satellite Scheduling Problem
Herrmann, A., & Schaub, H. (2023) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2023.3251307 · Cited by 61 · see citing works
Robust scheduling for multiple agile Earth observation satellites under cloud coverage uncertainty
Wang, X., Gu, Y., Wu, G., & Woodward, J. R. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2021.107292 · Cited by 55 · see citing works
Zhao, X., Wang, Z., & Zheng, G. (2020) · Journal of Aerospace Information Systems · doi:10.2514/1.i010754 · Cited by 56 · see citing works
Chen, M., Du, Y., Tang, K., Xing, L., Chen, Y., & Chen, Y. (2024) · IEEE Transactions on Systems Man and Cybernetics Systems · doi:10.1109/tsmc.2024.3411640 · Cited by 54 · see citing works
Flexible Task Scheduling in Data Relay Satellite Networks
Wu, G., Luo, Q., Zhu, Y., Chen, X., Feng, Y., & Pedrycz, W. (2021) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2021.3115587 · Cited by 51 · see citing works
Markov Decision Processes For Multi-Objective Satellite Task Planning
Eddy, D., & Kochenderfer, M. J. (2020) · IEEE Aerospace Conference (AERO) · doi:10.1109/aero47225.2020.9172258 · Cited by 50 · see citing works
Wu, G., Xiang, Z., Wang, Y., Gu, Y., & Pedrycz, W. (2024) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2024.3416427 · Cited by 42 · see citing works
Satellite Scheduling Problems: A survey of applications in Earth and outer space observation
Ferrari, B., Cordeau, J., Delorme, M., Iori, M., & Orosei, R. (2024) · Computers & Operations Research · doi:10.1016/j.cor.2024.106875 · Cited by 47 · see citing works
A Novel Multi-Satellite and Multi-Task Scheduling Method Based on Task Network Graph Aggregation
Fan, H., Yang, Z., Zhang, X., Wu, S., Long, J., & Liu, L. (2022) · Expert Systems with Applications · doi:10.1016/j.eswa.2022.117565 · Cited by 37 · see citing works
Task Scheduling of Agile Satellites with Transition Time and Stereoscopic Imaging Constraints
Kim, J., Ahn, J., Choi, H., & Cho, D.-H. (2020) · Journal of Aerospace Information Systems · doi:10.2514/1.i010775 · Cited by 36 · see citing works
Self-citationJoint Observation and Transmission Scheduling in Agile Satellite Networks
He, L., Liang, B., Li, J., & Sheng, M. (2021) · IEEE Transactions on Mobile Computing · doi:10.1109/tmc.2021.3076088 · Cited by 31 · see citing works
Scheduling of a Constellation of Satellites: Creating a Mixed-Integer Linear Model
Monmousseau, P. (2021) · Journal of Optimization Theory and Applications · doi:10.1007/s10957-021-01875-2 · Cited by 28 · see citing works
Monte Carlo Tree Search Methods for the Earth-Observing Satellite Scheduling Problem
Herrmann, A., & Schaub, H. (2021) · Journal of Aerospace Information Systems · doi:10.2514/1.i010992 · Cited by 28 · see citing works
Lu, W., Gao, W., Liu, B., Niu, W., Peng, X., Yang, Z., & Song, Y. (2024) · Advances in Space Research · doi:10.1016/j.asr.2024.07.044 · Cited by 25 · see citing works
Long, Y., Shan, C., Shang, W., Li, J., & Wang, Y. (2024) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2024.3379169 · Cited by 25 · see citing works
A hybrid binary artificial bee colony algorithm for the satellite photograph scheduling problem
Luo, K. (2019) · Engineering Optimization · doi:10.1080/0305215x.2019.1657113 · Cited by 23 · see citing works
Song, Y., Xing, L., & Chen, Y. (2022) · Computers & Industrial Engineering · doi:10.1016/j.cie.2022.108795 · Cited by 20 · see citing works
Hierarchical Reinforcement-Learning for Real-Time Scheduling of Agile Satellites
Ren, L., Ning, X., & Jiayin Li, A. (2020) · IEEE Access · doi:10.1109/access.2020.3040748 · Cited by 19 · see citing works
Single-Agent Reinforcement Learning for Scalable Earth-Observing Satellite Constellation Operations
Herrmann, A., Stephenson, M. A., & Schaub, H. (2023) · Journal of Spacecraft and Rockets · doi:10.2514/1.a35736 · Cited by 18 · see citing works
Chen, H., Luo, Z., Peng, S., Wu, J., & Li, J. (2022) · Advances in Space Research · doi:10.1016/j.asr.2022.01.037 · Cited by 17 · see citing works
Scheduling of Earth observing satellites using distributed constraint optimization
Krigman, S., Grinshpoun, T., & Dery, L. (2024) · Journal of Scheduling · doi:10.1007/s10951-024-00816-x · Cited by 15 · see citing works
Wu, Q., Pan, J. H., & Wang, M. (2024) · Remote Sensing · doi:10.3390/rs16040657 · Cited by 13 · see citing works
A Traveling Salesman Problem-Based Approach to Observation Scheduling for Satellite Constellation
Cho, D.-H., & Choi, H. (2019) · International Journal of Aeronautical and Space Sciences · doi:10.1007/s42405-019-00151-y · Cited by 14 · see citing works
Self-citationAn Energy-Aware Task Scheduling for Quality-of-Service Assurance in Constellations of Nanosatellites
Seman, L. O., Ribeiro, B. F., Rigo, C. A., et al. (2022) · Sensors · doi:10.3390/s22103715 · Cited by 12 · see citing works
Optimal Target Assignment with Seamless Handovers for Networked Radars
(2019) · doi:10.3390/s19204555 · Cited by 11 · see citing works
Self-citationIntegrated Framework for Task Scheduling and Attitude Control of Multiple Agile Satellites
Kim, J., & Ahn, J. (2021) · Journal of Aerospace Information Systems · doi:10.2514/1.i010910 · Cited by 12 · see citing works
Self-citationQi, J., Hu, M., Xing, L., & Su, Z. (2025) · Expert Systems with Applications · doi:10.1016/j.eswa.2025.128502 · Cited by 11 · see citing works
Optimal Agile Satellite Target Scheduling with Learned Dynamics
Stephenson, M. A., & Schaub, H. (2024) · Journal of Spacecraft and Rockets · doi:10.2514/1.a36097 · Cited by 9 · see citing works
Distributed Task Scheduling for Multiple EOSs via a Game Theory Approach
Feng, R., Lin, Z., Wu, P., Han, Z., & Wang, B. (2022) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2022.3203664 · Cited by 9 · see citing works
Optimal Planetary Surface Exploration with Heterogeneous Agents
Choi, E., & Ahn, J. (2023) · Journal of Spacecraft and Rockets · doi:10.2514/1.a35632 · Cited by 9 · see citing works
Self-citationThe integrated agile Earth observation satellite scheduling problem
Rocha, Y., Chagas, G. O., Coelho, L. C., & Subramanian, A. (2025) · Computers & Operations Research · doi:10.1016/j.cor.2025.107212 · Cited by 9 · see citing works
Yao, W., Shen, X., Guo Zhang, A., Lu, Z., Wang, J., Song, Y., & Li, Z. (2025) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2025.101867 · Cited by 6 · see citing works
Multi-Satellite Observation-Relay Transmission-Downloading Coupling Scheduling Method
He, C., & Dong, Y. (2023) · Remote Sensing · doi:10.3390/rs15245639 · Cited by 7 · see citing works
Chen, M., Wei, L., Chun, J., et al. (2025) · Applied Soft Computing · doi:10.1016/j.asoc.2025.112984 · Cited by 6 · see citing works
Li, P., Cui, P., & Wang, H. (2025) · Sensors · doi:10.3390/s25061707 · Cited by 6 · see citing works
A Double Auction Mechanism for Task Scheduling of An EOS Constellation
Feng, R., Lin, Z., Wu, P., Han, Z., & Wang, B. (2023) · IEEE Transactions on Circuits & Systems II Express Briefs · doi:10.1109/tcsii.2023.3238052 · Cited by 5 · see citing works
Closed-Form Solutions for Single-Axis Slew Maneuvers Under a Fixed Final Time Constraint
Lee, D., & Song, Y.-J. (2023) · International Journal of Aeronautical and Space Sciences · doi:10.1007/s42405-023-00682-5 · Cited by 5 · see citing works
Feng, Y., Zhang, R., Ren, S., Zhu, S., & Yang, Y. (2023) · Remote Sensing · doi:10.3390/rs15071761 · Cited by 6 · see citing works
Stephenson, M. A., Mantovani, L. Q., & Schaub, H. (2025) · Journal of Aerospace Information Systems · doi:10.2514/1.i011649 · Cited by 6 · see citing works
Potential Game Based Distributed Task Scheduling for Multi-Earth Observation Satellites
Feng, R., Lin, Z., Wu, P., Han, Z., & Wang, B. (2020) · International Conference on Information, Cybernetics, and Computational Social Systems (ICCSS) · doi:10.1109/iccss52145.2020.9336856 · Cited by 5 · see citing works
Reconfigurable Earth Observation Satellite Scheduling Problem
(2025) · doi:10.2514/1.i011659 · Cited by 4 · see citing works
Li, H. H., Yuanhao, L. I. U., Deng, B., Li, X., Li, X., Yu, L. I., ZHANG, T., & Zhao, S. (2025) · Chinese Journal of Aeronautics · doi:10.1016/j.cja.2025.103567 · Cited by 6 · see citing works
Holder, J., Kraisler, S., & Mesbahi, M. (2025) · Journal of Guidance Control and Dynamics · doi:10.2514/1.g008363 · Cited by 4 · see citing works
Integrated earth observation satellite scheduling with relay-assisted downlink
Kim, S. J., Kim, M., Kim, C., & Han-lim Choi, A. (2025) · Aerospace Science and Technology · doi:10.1016/j.ast.2025.110864 · Cited by 4 · see citing works
Self-citationKim, C.-H., Kim, S. J., & Han-lim Choi, A. (2024) · IEEE International Conference on Automation Science and Engineering (CASE) · doi:10.1109/case59546.2024.10711478 · Cited by 4 · see citing works
Self-citationWang, B., Feng, Y., Zhang, G., Zhang, L., & Yang, Y. (2024) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2024.3429302 · Cited by 3 · see citing works
Planning the Coverage of Solar System Bodies Under Geometric Constraints
Maillard, A., Chien, S., & Wells, C. (2021) · Journal of Aerospace Information Systems · doi:10.2514/1.i010896 · Cited by 5 · see citing works
Abstract Argumentation for Explainable Satellite Scheduling
Powell, C., & Riccardi, A. (2022) · IEEE International Conference on Data Science and Advanced Analytics (DSAA) · doi:10.1109/dsaa54385.2022.10032348 · Cited by 4 · see citing works
Stephenson, M. A., Mantovani, L. Q., Phillips, S. A., & Schaub, H. (2024) · AIAA SciTech Forum · doi:10.2514/6.2024-0990 · Cited by 3 · see citing works
Observation Task Scheduling of Satellite Constellation with Consensus-based Task Pruning
Kim, S. J., Kim, C.-H., & Choi, H. (2024) · AIAA SciTech Forum · doi:10.2514/6.2024-0746 · Cited by 2 · see citing works
Self-citationZheng, P., Guo, C., Ji, Q., & Guo, S. (2021) · International Conference on Systems and Informatics (ICSAI) · doi:10.1109/icsai53574.2021.9664098 · Cited by 2 · see citing works
Lee, J., & Lee, D. (2025) · International Journal of Aeronautical and Space Sciences · doi:10.1007/s42405-025-00942-6 · Cited by 2 · see citing works
Lee, K., Kim, D., Chung, D., & Lee, S. (2024) · doi:10.20944/preprints202403.0331.v1 · Cited by 6 · see citing works
Kim, S. J., Kim, M., Kim, C.-H., & Han-lim Choi, A. (2025) · AIAA SciTech Forum · doi:10.2514/6.2025-2273 · Cited by 2 · see citing works
Self-citationTask Scheduling of Multiple Agile Satellites with Transition Time and Stereo Imaging Constraints
(2019) · doi:10.48550/arxiv.1912.00374 · Cited by 2 · see citing works
Self-citationHeterogeneous Satellite Task Scheduling with Revisit Time Minimization using MILP Formulation
(2024) · doi:10.2514/6.2024-0747 · Cited by 2 · see citing works
Self-citationAutonomous Small Body Science Operations Using Reinforcement Learning
Herrmann, A., & Schaub, H. (2024) · Journal of Aerospace Information Systems · doi:10.2514/1.i011376 · Cited by 2 · see citing works
A Large-Scale Scheduling Method for Multiple Agile Optical Satellites
Liu, Z., Xiong, W. H., & Xiong, M. (2022) · Computer Modeling in Engineering & Sciences · doi:10.32604/cmes.2023.025452 · Cited by 1 · see citing works
Peng, H., & Bai, X. (2022) · Journal of Spacecraft and Rockets · doi:10.2514/1.a35249 · Cited by 1 · see citing works
Kim, J., & Ahn, J. (2020) · AIAA SciTech Forum · doi:10.2514/6.2020-2133 · Cited by 1 · see citing works
Self-citationPicard, G. (2023) · Revue Ouverte d Intelligence Artificielle · doi:10.5802/roia.60
Minimizing temporal gaps for multi-shot Earth observation: gap-aware satellite scheduling
(2026) · doi:10.1016/j.asr.2026.08.038
Self-citationSun, H., Wang, Z., Hu, X., & Xia, W. (2025) · Journal of Systems Engineering and Electronics · doi:10.23919/jsee.2025.000177
From Commands to Cognition: An LLM-Driven Satellite Agent for Autonomous Spectrum Sensing
Hu, Z., Zhang, Z., Gao, X., Zhu, C., Li, R., Bu, X., & An, J. (2026) · IEEE Internet of Things Journal · doi:10.1109/jiot.2026.3709954
Attitude profile design for TDI imaging under constant line-rate constraint
Lee, Y., & Lee, D. (2026) · Advances in Space Research · doi:10.1016/j.asr.2026.08.006
Zuo, Y., Chen, M., Liu, X., Du, Y., Qamar, A., & Shang, Y. (2025) · Tsinghua Science & Technology · doi:10.26599/tst.2024.9010164
ChatGPT-based Mission Scheduling for Earth Observation Satellites
Kim, S. J., Kim, M., & Choi, H. (2025) · Journal of Institute of Control Robotics and Systems · doi:10.5302/j.icros.2025.25.0007
Self-citation
- Authors
- Cho, D.-H., Kim, J.-H., Choi, H.-L., & Ahn, J.
- Affiliations
- Korea Advanced Institute of Science and Technology (KR)
- Korea Advanced Institute of Science and Technology, Daejeon 34141, Republic of Korea
- Venue
- Journal of Aerospace Information Systems
- Published
- 2018-11
- Volume
- 15
- Issue
- 11
- Pages
- 611-626
- ISSN
- 2327-3097 (ISSN-L)
- OpenAlex
- W2895574744
- Cited by
- 98
- References
- 46
- Citations by year
- 2026: 9 · 2025: 20 · 2024: 18 · 2023: 12 · 2022: 15 · 2021: 8 · 2020: 11 · 2019: 5
- FWCI
- 4.88
- Type
- journal article
- Language
- en
- Open access
- bronze
- doi.org
- Locations
- Journal of Aerospace Information Systems (publishedVersion)
- Funders
- National Research Foundation of Korea (NRF-2016M1A3A3A02017919)
- Topics
- Physical Sciences › Engineering › Aerospace Engineering › Satellite Communication Systems
- Physical Sciences › Engineering › Aerospace Engineering › Spacecraft Dynamics and Control
- Physical Sciences › Engineering › Aerospace Engineering › Spacecraft Design and Technology
- Keywords
- low Earth orbit satellites, binary linear programming, mixed-integer linear programming, ground station communication, greedy algorithm comparison
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Claims read by deepseek-v4.1-flash under definition version 3 (extract-v3) on 2026-09-28.
Classified by jev-1.13-20260917 (gold-guideline-v0.2) on 2026-09-28.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review