Control in Internal and Outsourced Software Projects
The DOI matches its Crossref record; 42 of the 42 references it cites were found in a registry or an index.
Abstract
Although the choice of control mechanisms in systems development projects has been extensively studied in prior research, differences in such choices across internal and outsourced projects and their effects on systems development performance have not received much attention. This study attempts to address this gap using data on 57 outsourced and 79 internal projects in 136 organizations. Our results reveal a paradoxical overarching pattern: controllers attempt greater use of control mechanisms in outsourced projects relative to internal projects, yet controls enhance systems development performance in internal projects but not in outsourced projects. We introduce a distinction between attempted control and realized control to explain this disconnect, and show how anticipated transaction hazards motivate the former but meeting specific informational and social prerequisites facilitate the latter. Our results contribute three new insights to the systems development control literature. First, controllers attempt to use controller-driven control mechanisms to a greater degree in outsourced projects but controllee-driven control mechanisms to a greater degree in internal projects. Second, we establish a hitherto-missing control-performance link. The nuanced differences in internal and outsourced projects simultaneously confirm and refute a pervasive assertion in the information systems controls literature that control enhances performance. Finally, we show how requirements volatility—which can be at odds with control—alters the control—performance relationships. Implications for theory and practice are also discussed.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Convergent and discriminant validation by the multitrait-multimethod matrix.
Campbell, D. T., & Fiske, D. W. (1959) · Psychological Bulletin · doi:10.1037/h0046016 · Cited by 17,116 · cited 1×
“Factor analyses confirmed discriminant validity among the various constructs, and scale alphas of 0.72 and greater and eigenvalues greater than 1 confirmed convergent validity [6].”
BackgroundInfluentialForming inferences about some intraclass correlation coefficients.
McGraw, K. O., & Wong, S. P. (1996) · Psychological Methods · doi:10.1037/1082-989x.1.1.30 · Cited by 6,903 · cited 1×
“Performance assessments of both matched-pair informants for the projects in the sample were cross-validated to verify interrater agreement using the interclass coefficient [29].”
MethodMarkets, Bureaucracies, and Clans
Ouchi, W. G. (1980) · Administrative Science Quarterly · doi:10.2307/2392231 · Cited by 4,735 · cited 3×
“However, realizing clan control requires that the controller and controllee embrace similar values, beliefs, goals, and problem-solving approaches [25], and that sanctions be imposed by the controller on the controllee for noncompliance with these purportedly shared norms [34].”
BackgroundEdwards, J. R., & Lambert, L. S. (2007) · Psychological Methods · doi:10.1037/1082-989x.12.1.1 · Cited by 4,711 · cited 1×
“the interpretation of interaction effects plots relies on comparing the slope rather than absolute values of the relationship for varying levels of the moderator [13].”
BackgroundA Conceptual Framework for the Design of Organizational Control Mechanisms
Ouchi, W. G. (1979) · Management Science · doi:10.1287/mnsc.25.9.833 · Cited by 3,707 · cited 8×
“Ouchi’s [33] control theory, which is derived from agency theory, provides a useful theoretical foundation for conceptualizing both the differences in control portfolios and their effects on systems development performance in internal and outsourced projects. the notion of control is based on the premise that the cont…”
BackgroundMethodInfluentialDo formal contracts and relational governance function as substitutes or complements?
Poppo, L., & Zenger, T. (2002) · Strategic Management Journal · doi:10.1002/smj.249 · Cited by 3,652 · cited 2×
“, like Poppo and Zenger [37], did not distinguish the outcome and process facets of formal contracts as we do.”
BackgroundBetween Trust and Control: Developing Confidence in Partner Cooperation in Alliances
Das, T. K., & Teng, B.-S. (1998) · The Academy of Management Review · doi:10.2307/259291 · Cited by 3,358
Interaction Effects in Multiple Regression.
Richardson, S. C., Jacard, J., Turrisi, R., & Wan, C. K. (1991) · The Statistician · doi:10.2307/2348747 · Cited by 3,309
Control: Organizational and Economic Approaches
Eisenhardt, K. M. (1985) · Management Science · doi:10.1287/mnsc.31.2.134 · Cited by 2,021 · cited 3×
“the notion of control is based on the premise that the controller (the principal) and controllee (the agent) have divergent interests, which control mechanisms attempt to align [14].”
BackgroundMethodInteraction Effects in Multiple Regression
Jaccard, J., & Turrisi, R. (2003) · doi:10.4135/9781412984522 · Cited by 1,797
Coordinating Expertise in Software Development Teams
Faraj, S., & Sproull, L. (2000) · Management Science · doi:10.1287/mnsc.46.12.1554.12072 · Cited by 1,689
Trust as an Organizing Principle
McEvily, B., Perrone, V., & Zaheer, A. (2003) · Organization Science · doi:10.1287/orsc.14.1.91.12814 · Cited by 1,673
Explaining the Role of User Participation in Information System Use
Hartwick, J., & Barki, H. (1994) · Management Science · doi:10.1287/mnsc.40.4.440 · Cited by 1,540
A knowledge-based theory of the firm—The problem-solving perspective
Nickerson, J. A., & Zenger, T. R. (2004) · Organization Science · doi:10.1287/orsc.1040.0093 · Cited by 1,342 · cited 1×
“One interpretation is that the market-based nature of outsourced projects and a realistic threat of vendor interchangeability [27] might obviate the need for outcome control because a controllee’s prospects for obtaining future contracts provides a powerful disincentive from behaving opportunistically [12, 30].”
BackgroundIT Alignment: What Have We Learned?
Chan, Y. E., & Reich, B. H. (2007) · Journal of Information Technology · doi:10.1057/palgrave.jit.2000109 · Cited by 1,066 · cited 1×
“this notion is the foundational premise of the research stream on It–line goal alignment [9].”
BackgroundAn empirical study of speed and communication in globally distributed software development
Herbsleb, J. D., & Mockus, A. (2003) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2003.1205177 · Cited by 997 · cited 1×
“the absence of preexisting controller–controllee informational conduits in outsourced projects makes it difficult for the controller to observe controllee behaviors [10, 18].”
BackgroundSPECIFIC AND GENERAL KNOWLEDGE, AND ORGANIZATIONAL STRUCTURE
Jensen, M. C., & Heckling, W. H. (1995) · Journal of Applied Corporate Finance · doi:10.1111/j.1745-6622.1995.tb00283.x · Cited by 979
Carson, S. J., Madhok, A., & Wu, T. (2006) · Academy of Management Journal · doi:10.5465/amj.2006.22798187 · Cited by 763
Portfolios of Control Modes and IS Project Management
Kirsch, L. S. (1997) · Information Systems Research · doi:10.1287/isre.8.3.215 · Cited by 677 · cited 3×
“is [25] / or is [23] or [24] meant?>> study of internal projects observed greater reliance on formal controls whereas Choudhury and Sabherwal’s [10] study of outsourced projects observed informal controls to a greater degree.”
BackgroundResultThe Management of Complex Tasks in Organizations: Controlling the Systems Development Process
Kirsch, L. J. (1996) · Organization Science · doi:10.1287/orsc.7.1.1 · Cited by 671 · cited 10×
“…Sabherwal [10], we use the term controller to refer to teams of individuals in the client department or organization responsible for designing and implementing controls and controllee to refer to individuals in the It department or vendor organization responsible for systems development [10, 24].”
BackgroundMethodInfluentialOrganizational Control: Two Functions
Ouchi, W. G., & Maguire, M. A. (1975) · Administrative Science Quarterly · doi:10.2307/2392023 · Cited by 651 · cited 1×
“two ideas form the crux of control theory: (1) control is used by a controller as a device for discouraging anticipated opportunistic behavior by a controllee [35] and (2) each control mechanism has informational requirements and social requirements that must be met for it to be effective [33].”
BackgroundPortfolios of Control in Outsourced Software Development Projects
Choudhury, V., & Sabherwal, R. (2003) · Information Systems Research · doi:10.1287/isre.14.3.291.16563 · Cited by 621 · cited 17×
“Furthermore, it appears that kirsch et al. observed attempted control, whereas Choudhury and Sabherwal observed realized control, and attempting to compare them confounds the attempted–realized distinction introduced here.”
BackgroundMethodInfluentialManaging I/S Design Teams: A Control Theories Perspective
Henderson, J. C., & Lee, S. (1992) · Management Science · doi:10.1287/mnsc.38.6.757 · Cited by 591 · cited 5×
“this finding complements and draws a boundary condition around Henderson and lee’s [17] unreplicated observation from internal projects that outcome control improves performance.”
BackgroundResultInfluentialIn Pursuit of Moderation: Nine Common Errors and Their Solutions1
Carte, T. A., & Russell, C. J. (2003) · MIS Quarterly · doi:10.2307/30036541 · Cited by 565 · cited 2×
“Although Carte and russell [8] recommend this procedure in addition to examining beta values, it conflicts with Jaccard and turrisi’s [20, p.”
MethodNidumolu, S. (1995) · Information Systems Research · doi:10.1287/isre.6.3.191 · Cited by 555
Controlling Information Systems Development Projects: The View from the Client
Kirsch, L. J., Sambamurthy, V., Ko, D.-G., & Purvis, R. L. (2002) · Management Science · doi:10.1287/mnsc.48.4.484.204 · Cited by 459 · cited 10×
“In projects with high outcome measurability, with high behavior observability, and where the controller possesses high levels of technical knowledge, controllers are more likely to attempt to use formal control mechanisms [24, 25].”
BackgroundResultInfluentialIT Outsourcing Strategies: Universalistic, Contingency, and Configurational Explanations of Success
Lee, J.-N., Miranda, S. M., & Kim, Y.-M. (2004) · Information Systems Research · doi:10.1287/isre.1040.0013 · Cited by 430 · cited 1×
“One interpretation is that the market-based nature of outsourced projects and a realistic threat of vendor interchangeability [27] might obviate the need for outcome control because a controllee’s prospects for obtaining future contracts provides a powerful disincentive from behaving opportunistically [12, 30].”
BackgroundAn Integrative Contingency Model of Software Project Risk Management
Barki, H., Rivard, S., & Talbot, J. (2001) · Journal of Management Information Systems · doi:10.1080/07421222.2001.11045666 · Cited by 410 · cited 1×
“Second, the relative complexity and relative size of the project can influence performance [4].”
BackgroundAnderson, S. W., & Dekker, H. C. (2005) · Management Science · doi:10.1287/mnsc.1050.0456 · Cited by 389
Lance, C. E. (1988) · Applied Psychological Measurement · doi:10.1177/014662168801200205 · Cited by 375
Reconciling user and project manager perceptions of IT project risk: a Delphi study1
Keil, M., Tiwana, A., & Bush, A. (2002) · Information Systems Journal · doi:10.1046/j.1365-2575.2002.00121.x · Cited by 255 · cited 1×
“Fourth, controllers and controllees might have different perceptions about the extent to which various control mechanisms were attempted in a project (see [22]); our use of It informants for this data limits our results’ generalizability.”
Self-citationThe Contracting Organization: A Strategic Guide to Outsourcing
Domberger, S. (1998) · doi:10.1093/0198774575.001.0001 · Cited by 251 · cited 6×
“Broadly speaking, control refers to the process and rules governing controllee actions implemented by the controller to promote desirable controllee behaviors [10, 12, 21].”
BackgroundInfluentialDistinguishing costs of cooperation and control in alliances
White, S., & Siu‐Yun Lui, S. (2005) · Strategic Management Journal · doi:10.1002/smj.490 · Cited by 231 · cited 1×
“) Controllers incur costs in terms of managerial effort in attempting control [43], and the perceived threat of opportunistic controllee behavior that formal control attempts to discourage is likely less pronounced in internal projects relative to outsourced projects.”
BackgroundPredictors of Formal Control Usage in IT Outsourcing Partnerships
Rustagi, S., King, W. R., & Kirsch, L. J. (2008) · Information Systems Research · doi:10.1287/isre.1080.0169 · Cited by 224 · cited 2×
“, [10, 39]) that predict controls’ choice rather than their impact on performance.”
BackgroundTiwana, A. (2008) · Strategic Management Journal · doi:10.1002/smj.673 · Cited by 211 · cited 1×
“First, how does attempted control relate to sharing of project decision rights between the controller and controllee? the unexplored linkages between what a project should do (“decision control rights”) and how it should do it (“decision management rights”) conceptualized in recent research [41] present new opportunit…”
BackgroundSelf-citationA Knowledge-based Theory of the Firm - A Problem-solving Perspective
Nickerson, J. A., & Zenger, T. R. (2004) · SSRN Electronic Journal · doi:10.2139/ssrn.596964 · Cited by 163
User Participation, Conflict, and Conflict Resolution: The Mediating Roles of Influence
Barki, H., & Hartwick, J. (1994) · Information Systems Research · doi:10.1287/isre.5.4.422 · Cited by 162 · cited 1×
“, [3, 16]) that active involvement of a system’s future users enhances project outcomes.”
BackgroundThe Matrix of Control: Combining Process and Structure Approaches to Managing Software Development
NIDUMOLU, S. R., & SUBRAMANI, M. R. (2003) · Journal of Management Information Systems · doi:10.1080/07421222.2003.11045774 · Cited by 155 · cited 2×
“Nidumolu and Subramani [32], for example, proposed but did not test the relationship between formal control and performance, and Henderson and lee [17] studied only formal controls in internal projects.”
BackgroundThe Moderating Effects of Structure on Volatility and Complexity in Software Enhancement
Banker, R. D., & Slaughter, S. A. (2000) · Information Systems Research · doi:10.1287/isre.11.3.219.12209 · Cited by 132 · cited 2×
“requirements volatility is defined as the extent to which project requirements unpredictably change over the course of the systems development life cycle [2].”
BackgroundStopping Behavior of Systems Analysts During Information Requirements Elicitation
Pitts, M. G., & Browne, G. J. (2004) · Journal of Management Information Systems · doi:10.1080/07421222.2004.11045795 · Cited by 123 · cited 1×
“In other words, stable requirements are necessary for systems development to proceed according to plan [36].”
BackgroundSoftware project management under incomplete and ambiguous specifications
Rowen, R. B. (1990) · IEEE Transactions on Engineering Management · doi:10.1109/17.45260 · Cited by 65 · cited 1×
“this also makes it difficult to accurately estimate the time and development effort that a project will require [38].”
BackgroundSengupta, K. C., & Abdel‐Hamid, T. K. (1996) · IEEE Transactions on Systems Man and Cybernetics - Part A Systems and Humans · doi:10.1109/3468.485744 · Cited by 39 · cited 1×
“A key source of uncertainty in systems development projects is volatile requirements [40].”
Background
Cited by
Tiwana, A. (2010) · Journal of Management Information Systems · doi:10.2753/mis0742-1222270203 · Cited by 246
Self-citationOrganizational information security policies: a review and research framework
Cram, W. A., Proudfoot, J. G., & D’Arcy, J. (2017) · European Journal of Information Systems · doi:10.1057/s41303-017-0059-9 · Cited by 223
“…future research investigating drivers for policy creation and implementation could build on the work of Kirsch (1997), Gregory et al (2013), and Tiwana & Keil (2009) to consider in more depth the rationale behind the controls underlying security policies and what choices managers have in…”
BackgroundCost and time project management success factors for information systems development projects
Sanchez, O. P., Terlizzi, M. A., & de Moraes, H. R. D. O. C. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.09.007 · Cited by 173
Ramasubbu, N., & Kemerer, C. F. (2021) · Journal of Management Information Systems · doi:10.1080/07421222.2021.1870377 · Cited by 17
“manifested as requirements volatility, impacts the construction of the IS controls portfolio and moderates the relationship between execution of IS controls and performance outcomes [1, 57, 73, 82].”
BackgroundInfluential
Metadata
- Authors
- Tiwana, A., & Keil, M.
- Venue
- Journal of Management Information Systems
- Publisher
- Informa UK Limited
- Published
- 2009-12
- Volume
- 26
- Issue
- 3
- Pages
- 9-44
- ISSN
- 0742-1222 (ISSN-L)
- 1557-928X
- OpenAlex
- W2077584050
- Cited by
- 202
- References
- 42
- FWCI
- 18.19
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.