Optimization for a three-stage production system in the Internet of Things: procurement, production and product recovery, and acquisition
The DOI matches its Crossref record; 70 of the 70 references it cites were found in a registry or an index.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“IoT facilitates manufacturers to collect and share data for providing products that are functional and less expensive.”
From Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes (2023) · cites this paper as [104]
In the citing paper
“In this context, manufacturers are forced to select appropriate suppliers for specific components, ensuring lower procurement costs of greenhouse gas emission-contained materials.”
From Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes (2023) · cites this paper as [104]
In the citing paper
“The authors propose the use of IoT to address the questions of how to collect end-of-use items from customers and acquire knowledge about each item.”
From Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes (2023) · cites this paper as [104]
In the citing paper
“By doing so, manufacturers can make a global chain comprising suppliers, factories, and recyclers, which help them assemble products at a lower cost.”
From Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes (2023) · cites this paper as [104]
In the citing paper
“Although there are different types of costs related to the supply chain, two of them are important in this context.They are the costs of purchasing raw materials and the costs of maintaining inventory in production sites [104].”
From Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes (2023) · cites this paper as [104]
Citations
Cites
Internet of Things (IoT): A vision, architectural elements, and future directions
Gubbi, J., Buyya, R., Marusic, S., & Palaniswami, M. (2013) · Future Generation Computer Systems · doi:10.1016/j.future.2013.01.010 · Cited by 12,293
A discrete binary version of the particle swarm algorithm
Kennedy, J., & Eberhart, R. C. (2002) · 1997 IEEE International Conference on Systems, Man, and Cybernetics. Computational Cybernetics and Simulation · doi:10.1109/icsmc.1997.637339 · Cited by 4,767 · cited 1×
“6, and the relevant details are introduced by Kennedy and Eberhart [74].”
BackgroundInternet of things: Vision, applications and research challenges
Miorandi, D., Sicari, S., De Pellegrini, F., & Chlamtac, I. (2012) · Ad Hoc Networks · doi:10.1016/j.adhoc.2012.02.016 · Cited by 3,578 · cited 1×
“Recently, the IoT technology has been greatly extended to various areas with many industrial and social applications [47].”
BackgroundAnt colony optimization theory: A survey
Dorigo, M., & Blum, C. (2005) · Theoretical Computer Science · doi:10.1016/j.tcs.2005.05.020 · Cited by 2,295 · cited 1×
“From the solution aspect, many searching algorithms have been shown to be effective and efficient in dealing with different optimization problems, such as genetic algorithm [70], ant colony algorithm [71], simulated annealing algorithm [72], and particle swarm optimization (PSO) algorithm [73], etc.”
MethodComparison between genetic algorithms and particle swarm optimization
Eberhart, R. C., & Shi, Y. (1998) · Lecture Notes in Computer Science · doi:10.1007/bfb0040812 · Cited by 1,610 · cited 1×
“In this research, the inertia weight method of PSO algorithm [75] is used and the encoding and decoding scheme are developed as follows.”
MethodOR FORUM—The Evolution of Closed-Loop Supply Chain Research
Guide, V. D. R., & Van Wassenhove, L. N. (2009) · Operations Research · doi:10.1287/opre.1080.0628 · Cited by 1,408
Issues in environmentally conscious manufacturing and product recovery: a survey
Gungor, A., & Gupta, S. M. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00167-9 · Cited by 1,107
Ilgin, M. A., & Gupta, S. M. (2010) · Journal of Environmental Management · doi:10.1016/j.jenvman.2009.09.037 · Cited by 1,015
Cloud manufacturing: a new manufacturing paradigm
Zhang, L., Luo, Y., Tao, F., Li, B. H., Ren, L., Zhang, X., Guo, H., Cheng, Y., Hu, A., & Liu, Y. (2014) · Enterprise Information Systems · doi:10.1080/17517575.2012.683812 · Cited by 810 · cited 1×
“Zhang et al. [49] proposed the concept of cloud manufacturing which combined cloud computing and IoTetc., for solving the bottlenecks in manufacturing applications.”
BackgroundCCIoT-CMfg: Cloud Computing and Internet of Things-Based Cloud Manufacturing Service System
Tao, F., Cheng, Y., Xu, L. D., Zhang, L., & Li, B. H. (2014) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2014.2306383 · Cited by 722 · cited 2×
“Tao et al. [10] presented a cloud manufacturing service system architecture based on cloud computing and IoT.”
BackgroundMethodMANAGING PRODUCT RETURNS FOR REMANUFACTURING
GUIDE, V. D. R., & VANWASSENHOVE, L. N. (2001) · Production and Operations Management · doi:10.1111/j.1937-5956.2001.tb00075.x · Cited by 708 · cited 1×
“Acquisition of used products is one of the main challenges in reverse supply chain and a highly complex problem due to high variability in return quality and volume [20].”
BackgroundA survey of simulated annealing as a tool for single and multiobjective optimization
Suman, B., & Kumar, P. (2006) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2602068 · Cited by 611 · cited 1×
“From the solution aspect, many searching algorithms have been shown to be effective and efficient in dealing with different optimization problems, such as genetic algorithm [70], ant colony algorithm [71], simulated annealing algorithm [72], and particle swarm optimization (PSO) algorithm [73], etc.”
MethodStage of the Product Life Cycle, Business Strategy, and Business Performance.
Anderson, C. R., & Zeithaml, C. P. (1984) · Academy of Management Journal · doi:10.2307/255954 · Cited by 608 · cited 1×
“PLC is the life span of a particular product in the market and is conventionally divided into four stages that a product goes through from when it was first conceptualized until it is eliminated from the market [14].”
BackgroundService-Oriented Paradigms in Industrial Automation
Jammes, F., & Smit, H. (2005) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2005.844419 · Cited by 601 · cited 1×
“A typical architecture of IoT implementation is composed of three layers related to perception, network, and application levels, respectively [9].”
BackgroundReverse Supply Chains for Commercial Returns
Blackburn, J. D., Guide, V. D. R., Souza, G. C., & Wassenhove, L. N. V. (2004) · California Management Review · doi:10.2307/41166207 · Cited by 590 · cited 1×
“Most of the recoverable value losses in the reverse flow are not due to processing in time [68].”
BackgroundClosed-loop PLM for intelligent products in the era of the Internet of things
Kiritsis, D. (2011) · Computer-Aided Design · doi:10.1016/j.cad.2010.03.002 · Cited by 485 · cited 9×
“PLM describes the engineering aspect of a product, whereas, PLCM refers to the commercial management of a product in the marketing with respect to costs and demand measures.”
BackgroundMethodInfluentialGenetic Algorithm: Review and Application
Kumar, M., Husain, M., Upreti, N., & Gupta, D. (2010) · SSRN Electronic Journal · doi:10.2139/ssrn.3529843 · Cited by 476 · cited 1×
“From the solution aspect, many searching algorithms have been shown to be effective and efficient in dealing with different optimization problems, such as genetic algorithm [70], ant colony algorithm [71], simulated annealing algorithm [72], and particle swarm optimization (PSO) algorithm [73], etc.”
MethodBanks, A., Vincent, J., & Anyakoha, C. (2008) · Natural Computing · doi:10.1007/s11047-007-9050-z · Cited by 472
Time Value of Commercial Product Returns
Guide, V. D. R., Souza, G. C., Van Wassenhove, L. N., & Blackburn, J. D. (2006) · Management Science · doi:10.1287/mnsc.1060.0522 · Cited by 406 · cited 1×
“[11] has given the relationship between return time value and the total cost in the closed loop supply chain.”
Wan, J., Zhang, D., Zhao, S., Yang, L., & Lloret, J. (2014) · IEEE Communications Magazine · doi:10.1109/mcom.2014.6871677 · Cited by 369
Information architecture for supply chain quality management
Xu, L. D. (2011) · International Journal of Production Research · doi:10.1080/00207543.2010.508944 · Cited by 304 · cited 1×
“The information about raw materials and suppliers can be made available on the service platform of IoT [8].”
BackgroundProduction planning and inventory control with remanufacturing and disposal
van der Laan, E., & Salomon, M. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00108-2 · Cited by 304 · cited 1×
“cycle of a remanufacturable product is more complex than that of a non-remanufacturable one in the current model, because during its life cycle, both the demand rate and the return rate can vary over time [15].”
BackgroundHow the internet of things technology enhances emergency response operations
Yang, L., Yang, S. H., & Plotnick, L. (2013) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2012.07.011 · Cited by 297 · cited 1×
“Yang et al. [48] introduced the IoT technology for use in the emergency management community in order to enhance emergency response operations.”
BackgroundOptimal Acquisition and Sorting Policies for Remanufacturing
Galbreth, M. R., & Blackburn, J. D. (2006) · Production and Operations Management · doi:10.1111/j.1937-5956.2006.tb00252.x · Cited by 293 · cited 1×
“Galbreth and Blackburn [36] A, R No D, U No Optimal strategy”
BackgroundReview of Cyber-Physical System in Healthcare
Haque, S. A., Aziz, S. M., & Rahman, M. (2014) · International Journal of Distributed Sensor Networks · doi:10.1155/2014/217415 · Cited by 262 · cited 1×
“In addition, relevant technology named cyber physical systems (CPS) is widely used in the domains of intelligent transportation [57 – 59], smart power grid [60 – 62], and smart healthcare [63], etc.”
QoS-Aware Scheduling of Services-Oriented Internet of Things
Li, L., Li, S., & Zhao, S. (2014) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2014.2306782 · Cited by 250
Jayaraman, V. (2006) · International Journal of Production Research · doi:10.1080/00207540500250507 · Cited by 241 · cited 2×
“There are six value levels in the experiment so as the quality levels as defined in the previous work by Jayaraman [69].”
BackgroundMethodOptimal core acquisition and remanufacturing policies under uncertain core quality fractions
Teunter, R. H., & Flapper, S. D. P. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2010.06.015 · Cited by 232
Collaborative Cost Reduction and Component Procurement Under Information Asymmetry
Kim, S.-H., & Netessine, S. (2013) · Management Science · doi:10.1287/mnsc.1120.1573 · Cited by 220 · cited 1×
“Kim and Netessine [33] P No U No Optimal strategy”
BackgroundResearch issues on closed-loop PLM
Jun, H.-B., Kiritsis, D., & Xirouchakis, P. C. (2007) · Computers in Industry · doi:10.1016/j.compind.2007.04.001 · Cited by 218 · cited 1×
“Jun et al. [53] considered PEID in production life cycle management instead of RFID, which consisted of a RFID tag, sensor, memory, and processor, and the types of PEID depend on the characteristic of PLM applications.”
MethodFrom closed-loop to sustainable supply chains: the WEEE case
Quariguasi Frota Neto, J., Walther, G., Bloemhof, J., van Nunen, J. A. E. E., & Spengler, T. (2010) · International Journal of Production Research · doi:10.1080/00207540902906151 · Cited by 217 · cited 1×
“Fueled by the growing environmental concerns worldwide, legislation in many countries has been passed to regulate the manufacturer’s responsibility, take-back obligations, and explicit recycling objectives [1].”
BackgroundJoint procurement and production decisions in remanufacturing under quality and demand uncertainty
Mukhopadhyay, S. K., & Ma, H. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.07.032 · Cited by 184 · cited 1×
“Mukhopadhyay and Ma [22] considered joint procurement and production decisions in remanufacturing with random quality and demand.”
BackgroundLi, H., Lai, L., & Poor, H. V. (2012) · IEEE Journal on Selected Areas in Communications · doi:10.1109/jsac.2012.120708 · Cited by 183
RFID-based product information in end-of-life decision making
Parlikad, A. K., & McFarlane, D. (2007) · Control Engineering Practice · doi:10.1016/j.conengprac.2006.08.008 · Cited by 176
Procurement management using option contracts: random spot price and the portfolio effect
Fu, Q., Lee, C., & Teo, C. (2010) · IIE Transactions · doi:10.1080/07408171003670983 · Cited by 168
Product acquisition management: Current industry practice and a proposed framework
Daniel, V., Guide, R., & Jayaraman, V. (2000) · International Journal of Production Research · doi:10.1080/00207540050176003 · Cited by 168 · cited 4×
“Guide and Jayaraman [21] reported on current industry practice of endo f - l i f e p roduc t acqu i s i t i on in Nor th Amer i can remanufacturing firms and presented a formal framework for acquisition management.”
BackgroundInfluentialManaging production and procurement through option contracts in supply chains with random yield
Xu, H. (2010) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.04.007 · Cited by 142
Optimisation of integrated reverse logistics networks with different product recovery routes
Niknejad, A., & Petrov́ić, D. (2014) · European Journal of Operational Research · doi:10.1016/j.ejor.2014.03.034 · Cited by 133
Collaborative Cost Reduction and Component Procurement under Information AsymmetryPreprint
Kim, S.-H., & Netessine, S. (2010) · SSRN Electronic Journal · doi:10.2139/ssrn.1723231 · Cited by 126
Quality management in product recovery using the Internet of Things: An optimization approach
Ondemir, O., & Gupta, S. M. (2013) · Computers in Industry · doi:10.1016/j.compind.2013.11.006 · Cited by 125 · cited 2×
“The extensive review of product recovery is presented by Ilgin and Gupta [28] and Gungor and Gupta [29].”
BackgroundReal-Time Modeling for Direct Load Control in Cyber-Physical Power Systems
Facchinetti, T., & Vedova, M. L. D. (2011) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2011.2166787 · Cited by 115 · cited 1×
“In addition, relevant technology named cyber physical systems (CPS) is widely used in the domains of intelligent transportation [57 – 59], smart power grid [60 – 62], and smart healthcare [63], etc.”
Intelligent products: From lifecycle data acquisition to enabling product-related services
Yang, X., Moore, P., & Chong, S. K. (2009) · Computers in Industry · doi:10.1016/j.compind.2008.12.009 · Cited by 101 · cited 1×
“Yang et al. [54] proposed a service-enabled reference architecture and prototype which received product life cycle data via the intelligent data unit (IDU) and communication support infrastructure (CSI) and enabled product-related services.”
BackgroundThe effect of remanufacturing on procurement decisions for resellers in secondary markets
Robotis, A., Bhattacharya, S., & Wassenhove, L. N. V. (2004) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.01.013 · Cited by 96
Zhou, S. X., & Yu, Y. (2011) · Operations Research · doi:10.1287/opre.1100.0898 · Cited by 96 · cited 1×
“Zhou and Yu [39] A, R, S No D No Optimal strategy”
BackgroundLi, H., Dimitrovski, A., Song, J. B., Han, Z., & Qian, L. (2014) · IEEE Communications Surveys & Tutorials · doi:10.1109/surv.2014.052914.00130 · Cited by 94 · cited 1×
“Li et al. [51] proposed a three-layer quality of service scheduling model for service-oriented IoT in an attempt to optimize the performance of IoT and resource costs.”
BackgroundDynamic product acquisition in closed loop supply chains
Minner, S., & Kiesmüller, G. P. (2011) · International Journal of Production Research · doi:10.1080/00207543.2010.539280 · Cited by 76 · cited 1×
“Minner and Kiesmuller [24] considered a hybrid production system where demand can be satisfied by both brand new products and remanufacturing buying back used products.”
BackgroundBaki, F., Chaouch, B. A., & Abdul‐Kader, W. (2013) · Computers & Operations Research · doi:10.1016/j.cor.2013.10.001 · Cited by 73
Zhou, W., & Piramuthu, S. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.05.019 · Cited by 73
Integrated procurement-production systems: A review
Goyal, S. K., & Deshmukh, S. G. (1992) · European Journal of Operational Research · doi:10.1016/0377-2217(92)90172-6 · Cited by 72 · cited 1×
“More procurement-related works are presented by Goyal and Deshmukh [19].”
BackgroundImproved recycling with life cycle information tagged to the product
Luttropp, C., & Johansson, J. (2009) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2009.10.023 · Cited by 70 · cited 1×
“Luttropp and Johansson [55] demonstrated in recycling process that the product life cycle information can improve the recycling efficiency.”
BackgroundOn the network connectivity of platoon-based vehicular cyber-physical systems
Jia, D., Lu, K., & Wang, J. (2013) · Transportation Research Part C Emerging Technologies · doi:10.1016/j.trc.2013.10.006 · Cited by 70 · cited 1×
“In addition, relevant technology named cyber physical systems (CPS) is widely used in the domains of intelligent transportation [57 – 59], smart power grid [60 – 62], and smart healthcare [63], etc.”
Lot sizing for a single product recovery system with variable setup numbers
Konstantaras, I., & Skouri, K. (2009) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.07.018 · Cited by 68 · cited 1×
“Konstantaras and Skouri [43] R, S No D No Optimal strategy”
BackgroundLi, X., Li, Y., & Saghafian, S. (2012) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2012.2215873 · Cited by 67
System architecture for closed-loop PLM
Jun, H.-B., Shin, J.-H., Kiritsis, D., & Xirouchakis, P. (2007) · International Journal of Computer Integrated Manufacturing · doi:10.1080/09511920701566624 · Cited by 65 · cited 1×
“PEID makes it possible to gather the whole life data of products at any time and in any place, and some useful decisions can be made via analyzing the product-related information [52].”
BackgroundFuzzy multi-objective vendor selection under lean procurement
Yu, M.-C., Goh, M., & Lin, H.-C. (2012) · European Journal of Operational Research · doi:10.1016/j.ejor.2011.12.028 · Cited by 64
Optimal End-of-Life Management in Closed-Loop Supply Chains Using RFID and Sensors
Ondemir, O., Ilgın, M. A., & Gupta, S. M. (2011) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2011.2166767 · Cited by 63 · cited 2×
“Disas-sembly costs in the model are set to the same as previously described by Ondemir et al. [26].”
MethodSung, W., & Chiang, Y.-C. (2012) · Journal of Medical Systems · doi:10.1007/s10916-012-9848-9 · Cited by 63 · cited 1×
“Sung and Chiang [50] presented a particle swarm optimization (PSO) algorithm for android medical care IoT to enhance physiological multi-sensor data fusion measurement precision in IoT system.”
BackgroundIntegrated supply chain model for a deteriorating item with procurement cost dependent credit period
Das, B. C., Das, B., & Mondal, S. K. (2013) · Computers & Industrial Engineering · doi:10.1016/j.cie.2012.12.020 · Cited by 56
Coordination mechanisms for a three‐stage reverse supply chain to increase profitable returns
Zeng, A. Z. (2012) · Naval Research Logistics (NRL) · doi:10.1002/nav.21517 · Cited by 56
Vadde, S., Kamarthi, S. V., & Gupta, S. M. (2007) · International Journal of Production Research · doi:10.1080/00207540701449973 · Cited by 52
Pricing decisions in a multi-criteria setting for product recovery facilities
Vadde, S., Zeid, A., & Kamarthi, S. V. (2010) · Omega · doi:10.1016/j.omega.2010.06.005 · Cited by 52
A hybrid two-stock inventory control model for a reverse supply chain
Zolfagharinia, H., Hafezi, M., Farahani, R. Z., & Fahimnia, B. (2014) · Transportation Research Part E Logistics and Transportation Review · doi:10.1016/j.tre.2014.04.010 · Cited by 48 · cited 1×
“A typical assumption is that the demand during PLC is a constant, and it has been a common practice in traditional inventory control models with long PLC [67].”
BackgroundHu, F., Lim, C., & Lu, Z. (2014) · Applied Mathematics and Computation · doi:10.1016/j.amc.2014.01.149 · Cited by 46
An Advanced Heuristic for Multiple‐Option Spare Parts Procurement after End‐of‐Production
Inderfurth, K., & Kleber, R. (2012) · Production and Operations Management · doi:10.1111/j.1937-5956.2012.01358.x · Cited by 45 · cited 1×
“Inderfurth and Kleber [42] P, A No U No Heuristic”
BackgroundChen, K. (2012) · International Journal of Production Economics · doi:10.1016/j.ijpe.2012.03.009 · Cited by 40
Dynamic buy-back for product recovery in end-of-life spare parts procurement
Kleber, R., Schulz, T., & Voigt, G. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.560202 · Cited by 28
Kim, T., & Goyal, S. K. (2011) · International Journal of Production Research · doi:10.1080/00207543.2010.532918 · Cited by 23 · cited 2×
“Kim and Goyal [45] R No D No Optimal strategy”
BackgroundCyber physical system for vehicle application
Nawa, K., Chandrasiri, N. P., Yanagihara, T., & Oguchi, K. (2013) · Transactions of the Institute of Measurement and Control · doi:10.1177/0142331213510018 · Cited by 20 · cited 1×
“In addition, relevant technology named cyber physical systems (CPS) is widely used in the domains of intelligent transportation [57 – 59], smart power grid [60 – 62], and smart healthcare [63], etc.”
Reverse supply chain coordination and design for profitable returns-an example of ink cartridge
Bai, H. (2009) · Digital WPI · Cited by 20
A three‐stage procurement optimization problem under uncertainty
Prince, M., Smith, J. C., & Geunes, J. (2013) · Naval Research Logistics (NRL) · doi:10.1002/nav.21541 · Cited by 16 · cited 1×
“Prince et al. [17] considered a three-stage problem faced by a firm procuring a material input from a set of suppliers.”
Background
Cited by
Internet of things and supply chain management: A literature review
Ben-Daya, M., Hassini, E., & Bahroun, Z. (2019) · International Journal of Production Research · doi:10.1080/00207543.2017.1402140 · Cited by 1,501
“Fang et al. (2016) proposed an integrated three-stage model based on IoT technology for the optimisation of procurement, production and product recovery, pricing and strategy of return acquisition.”
MethodKamble, S. S., Gunasekaran, A., & Sharma, R. (2018) · Computers in Industry · doi:10.1016/j.compind.2018.06.004 · Cited by 727
The adoption of digital technologies in supply chains: Drivers, process and impact
Yang, M., Fu, M., & Zhang, Z. (2021) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2021.120795 · Cited by 510
Abdel-Basset, M., Manogaran, G., & Mohamed, M. (2018) · Future Generation Computer Systems · doi:10.1016/j.future.2018.04.051 · Cited by 427
RetractedHaddud, A., DeSouza, A., Khare, A., & Lee, H. (2017) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-05-2017-0094 · Cited by 373
Metadata
- Authors
- Fang, C., Liu, X., Pardalos, P. M., & Pei, J.
- Affiliations
- Hefei University of Technology (CN)
- Corresponding author
- Fang, Chang
- ORCID
- Venue
- The International Journal of Advanced Manufacturing Technology
- Published
- 2015-07-30
- Volume
- 83
- Issue
- 5-8
- Pages
- 689-710
- ISSN
- 0268-3768 (ISSN-L)
- 1433-3015
- OpenAlex
- W1008780993
- Cited by
- 102
- References
- 70
- Citations by year
- 2026: 2 · 2025: 5 · 2024: 9 · 2023: 11 · 2022: 14 · 2021: 17 · 2020: 16 · 2019: 11 · 2018: 10 · 2017: 3 · 2016: 3
- FWCI
- 13.77
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.springer.com/tdm (tdm)
- Locations
- The International Journal of Advanced Manufacturing Technology (publishedVersion)
- Funders
- National Natural Science Foundation of China
- Laboratory of Algorithms and Technologies for Networks Analysis
- Topics
- Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
- Social Sciences › Decision Sciences › Management Science and Operations Research › Supply Chain and Inventory Management
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Product Development and Customization
- Keywords
- Internet of Things, product recovery, procurement, production planning, product life cycle, refurbishment, component reuse, disposal, pricing strategy, particle swarm optimization, heuristic methods, end-of-life products
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.