Methodological-Technological Framework for Construction 4.0
The DOI matches its Crossref record; 148 of the 148 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
1 retracted
RETRACTED: Industry 4.0: key findings and analysis from the literature arena
Rejikumar, G., Sreedharan, V. R., Arunprasad, P., Persis, J., & Sreeraj, K. M. (2019) · Benchmarking An International Journal · doi:10.1108/bij-09-2018-0281 · Cited by 102
RetractedResearch Design: Qualitative, Quantitative, and Mixed Methods Approaches
Creswell, J. W. (1994) · Cited by 35,508
Research Design: Qualitative, Quantitative, and Mixed Methods Approaches
Sloane-Seale, A. (2009) · Canadian Journal of University Continuing Education · doi:10.21225/d54s3d · Cited by 14,328
Internet of Things (IoT): A vision, architectural elements, and future directions
Gubbi, J., Buyya, R., Marusic, S., & Palaniswami, M. (2013) · Future Generation Computer Systems · doi:10.1016/j.future.2013.01.010 · Cited by 12,293
An Overview of Blockchain Technology: Architecture, Consensus, and Future Trends
Zheng, Z., Xie, S., Dai, H., Chen, X., & Wang, H. (2017) · 2017 IEEE International Congress on Big Data (BigData Congress) · doi:10.1109/bigdatacongress.2017.85 · Cited by 4,515
Deep Learning‐Based Crack Damage Detection Using Convolutional Neural Networks
Cha, Y., Choi, W., & Büyüköztürk, O. (2017) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12263 · Cited by 3,295
Industry 4.0: state of the art and future trends
Xu, L. D., Xu, E. L., & Li, L. (2018) · International Journal of Production Research · doi:10.1080/00207543.2018.1444806 · Cited by 3,221
Industry 4.0: A survey on technologies, applications and open research issues
Lu, Y. (2017) · Journal of Industrial Information Integration · doi:10.1016/j.jii.2017.04.005 · Cited by 3,012
The rise of big data on cloud computing: Review and open research issues
Hashem, I. A. T., Yaqoob, I., Anuar, N. B., Mokhtar, S., Gani, A., & Ullah Khan, S. (2015) · Information Systems · doi:10.1016/j.is.2014.07.006 · Cited by 2,656
The rise of 3-D printing: The advantages of additive manufacturing over traditional manufacturing
Attaran, M. (2017) · Business Horizons · doi:10.1016/j.bushor.2017.05.011 · Cited by 1,822
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741
A Review of the Roles of Digital Twin in CPS-based Production Systems
Negri, E., Fumagalli, L., & Macchi, M. (2017) · Procedia Manufacturing · doi:10.1016/j.promfg.2017.07.198 · Cited by 1,669
Oesterreich, T. D., & Teuteberg, F. (2016) · Computers in Industry · doi:10.1016/j.compind.2016.09.006 · Cited by 1,526
Tao, F., Qi, Q., Wang, L., & Nee, A. Y. C. (2019) · Engineering · doi:10.1016/j.eng.2019.01.014 · Cited by 1,487
Wang, S., Wan, J., Zhang, D., Li, D., & Zhang, C. (2016) · Computer Networks · doi:10.1016/j.comnet.2015.12.017 · Cited by 1,404
Brettel, M., Friederichsen, N., Keller, M., & Rosenberg, M. (2014) · RWTH Publications (RWTH Aachen) · doi:10.5281/zenodo.1336426 · Cited by 1,362
“Industrie 4.0” and Smart Manufacturing – A Review of Research Issues and Application Examples
Thoben, K.-D., BIBA – Bremer Institut für Produktion und Logistik GmbH, T. U. O. B., Wiesner, S., Wuest, T., Faculty of Production Engineering, U. O. B., & Industrial and Management Systems Engineering (2017) · International Journal of Automation Technology · doi:10.20965/ijat.2017.p0004 · Cited by 1,133
Emerging Artificial Intelligence Methods in Structural Engineering
Salehi, H., & Burgueño, R. (2018) · Engineering Structures · doi:10.1016/j.engstruct.2018.05.084 · Cited by 1,068
A critical review of virtual and augmented reality (VR/AR) applications in construction safety
Li, X., Yi, W., Chi, H.-L., Wang, X., & Chan, A. P. C. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.11.003 · Cited by 1,055
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041 · cited 1×
“Design changes during construction Changes in design during construction are recurrent, for different reasons: inconsistencies, owner modifications, regulatory changes, but above all, early tenders where the economic criteria prevails over the technical quality of the design and energy efficiency or environmental cons…”
BackgroundTang, S., Shelden, D. R., Eastman, C. M., Pishdad-Bozorgi, P., & Gao, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.020 · Cited by 853
Sustainable manufacturing in Industry 4.0: an emerging research agenda
Machado, C. G., Winroth, M. P., & Ribeiro da Silva, E. H. D. (2020) · International Journal of Production Research · doi:10.1080/00207543.2019.1652777 · Cited by 829
Automatic creation of semantically rich 3D building models from laser scanner data
Xiong, X., Adan, A., Akinci, B., & Huber, D. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.10.006 · Cited by 703
Plocher, J., & Panesar, A. (2019) · Materials & Design · doi:10.1016/j.matdes.2019.108164 · Cited by 669
Industry 4.0 in Management Studies: A Systematic Literature Review
Piccarozzi, M., Aquilani, B., & Gatti, C. (2018) · Sustainability · doi:10.3390/su10103821 · Cited by 541
Industry 4.0: A Korea perspective
Sung, T. K. (2018) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2017.11.005 · Cited by 539
A critical investigation of Industry 4.0 in manufacturing: theoretical operationalisation framework
Fatorachian, H., & Kazemi, H. (2018) · Production Planning & Control · doi:10.1080/09537287.2018.1424960 · Cited by 522
García de Soto, B., Agustí-Juan, I., Hunhevicz, J., Joss, S., Graser, K., Habert, G., & Adey, B. T. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.04.004 · Cited by 474
Craveiro, F., Duarte, J. P., Bartolo, H., & Bartolo, P. J. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.011 · Cited by 455
Social media big data analytics: A survey
Ghani, N. A., Hamid, S., Targio Hashem, I. A., & Ahmed, E. (2019) · Computers in Human Behavior · doi:10.1016/j.chb.2018.08.039 · Cited by 430
IFC and building lifecycle management
Vanlande, R., Nicolle, C., & Cruz, C. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.05.001 · Cited by 421
The Potential of Additive Manufacturing in the Smart Factory Industrial 4.0: A Review
Mehrpouya, M., Dehghanghadikolaei, A., Fotovvati, B., Vosooghnia, A., Emamian, S. S., & Gisario, A. (2019) · Applied Sciences · doi:10.3390/app9183865 · Cited by 419
Application of machine learning to construction injury prediction
Tixier, A. J.-P., Hallowell, M. R., Rajagopalan, B., & Bowman, D. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.05.016 · Cited by 350
Analyzing the potential of Virtual Reality for engineering design review
Wolfartsberger, J. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.018 · Cited by 345
Chan, D. W. M., Olawumi, T. O., & Ho, A. M. L. (2019) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.100764 · Cited by 342
A review on five key sensors for monitoring of concrete structures
Taheri, S. (2019) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2019.01.172 · Cited by 311
Personal thermal comfort models with wearable sensors
Liu, S., Schiavon, S., Das, H. P., Jin, M., & Spanos, C. J. (2019) · Building and Environment · doi:10.1016/j.buildenv.2019.106281 · Cited by 306
Habibzadeh, H., Nussbaum, B. H., Anjomshoa, F., Kantarci, B., & Soyata, T. (2019) · Sustainable Cities and Society · doi:10.1016/j.scs.2019.101660 · Cited by 303
Wu, J., Cai, N., Chen, W., Wang, H., & Wang, G. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102894 · Cited by 299
The top 10 universal delay factors in construction projects
Zidane, Y. J.-T., & Andersen, B. S. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-05-2017-0052 · Cited by 294
Organizational and managerial challenges in the path toward Industry 4.0
Agostini, L., & Filippini, R. (2019) · European Journal of Innovation Management · doi:10.1108/ejim-02-2018-0030 · Cited by 276
Scopus scientific mapping production in industry 4.0 (2011–2018): a bibliometric analysis
Kipper, L. M., Furstenau, L. B., Hoppe, D., Frozza, R., & Iepsen, S. (2020) · International Journal of Production Research · doi:10.1080/00207543.2019.1671625 · Cited by 272
A conceptual framework for integrating building information modeling with augmented reality
Wang, X., Love, P. E. D., Kim, M. J., Park, C.-S., Sing, C.-P., & Hou, L. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.10.012 · Cited by 263
Data mining in building automation system for improving building operational performance
Xiao, F., & Fan, C. (2014) · Energy and Buildings · doi:10.1016/j.enbuild.2014.02.005 · Cited by 258
Digital twinning of existing reinforced concrete bridges from labelled point clusters
Lu, R., & Brilakis, I. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102837 · Cited by 258
Blockchain and the built environment: Potentials and limitations
Nawari, N. O., & Ravindran, S. (2019) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.100832 · Cited by 254
Construction automation: Research areas, industry concerns and suggestions for advancement
Chen, Q., García de Soto, B., & Adey, B. T. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.028 · Cited by 250
Wang, X., Truijens, M., Hou, L., Wang, Y., & Zhou, Y. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.12.003 · Cited by 242
Industry 4.0 for the Construction Industry—How Ready Is the Industry?
Maskuriy, R., Selamat, A., Ali, K. N., Maresova, P., & Krejcar, O. (2019) · Applied Sciences · doi:10.3390/app9142819 · Cited by 220
Integrating Building Information Modeling and Prefabrication Housing Production
Li, X., Shen, G. Q., Wu, P., & Yue, T. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.12.024 · Cited by 209
Parn, E. A., & Edwards, D. (2019) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-03-2018-0101 · Cited by 202
Robust Pixel-Level Crack Detection Using Deep Fully Convolutional Neural Networks
Alipour, M., Harris, D. K., & Miller, G. R. (2019) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000854 · Cited by 189
Lost data recovery for structural health monitoring based on convolutional neural networks
Fan, G., Li, J., & Hao, H. (2019) · Structural Control and Health Monitoring · doi:10.1002/stc.2433 · Cited by 187
Root-Cause Analysis of Construction-Cost Overruns
Rosenfeld, Y. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000789 · Cited by 187
He, D., Ai, B., Guan, K., Zhong, Z., Hui, B., Kim, J., Chung, H., & Kim, I. (2018) · IEEE Transactions on Intelligent Transportation Systems · doi:10.1109/tits.2017.2771559 · Cited by 185
Moon, D., Chung, S., Kwon, S., Seo, J., & Shin, J. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.07.020 · Cited by 180
Challenges and Benefits of Industry 4.0: an overview
Mamad, M. (2018) · DOAJ (DOAJ: Directory of Open Access Journals) · doi:10.22034/2018.3.7 · Cited by 178
Augmented reality system for facility management using image-based indoor localization
Baek, F., Ha, I., & Kim, H. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.11.034 · Cited by 175
Criticality of Construction Industry Problems in Developing Countries: Analyzing Malaysian Projects
Yap, J. B. H., Chow, I. N., & Shavarebi, K. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000709 · Cited by 173
BIM Execution Planning in Green Building Projects: LEED as a Use Case
Wu, W., & Issa, R. R. A. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000314 · Cited by 172
Nawari, N., & Ravindran, S. (2019) · Buildings · doi:10.3390/buildings9060149 · Cited by 169
A framework for using mobile computing for information management on construction sites
Chen, Y., & Kamara, J. M. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.01.002 · Cited by 168
On-site construction management using mobile computing technology
Kim, C., Park, T., Lim, H., & Kim, H. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.027 · Cited by 163
Braun, A., & Borrmann, A. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102879 · Cited by 160
Healthcare big data processing mechanisms: The role of cloud computing
Rajabion, L., Shaltooki, A. A., Taghikhah, M., Ghasemi, A., & Badfar, A. (2019) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2019.05.017 · Cited by 159
Perspectives on a BIM-integrated software platform for robotic construction through Contour Crafting
Davtalab, O., Kazemian, A., & Khoshnevis, B. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.01.006 · Cited by 158
Louis, J., & Dunston, P. S. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.07.005 · Cited by 156
Achieving Lean Design Process: Improvement Methodology
Freire, J., & Alarcón, L. F. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:3(248 · Cited by 154
TOWARDS DIGITIZING THE CONSTRUCTION INDUSTRY: STATE OF THE ART OF CONSTRUCTION 4.0
Hossain, M. A., & Nadeem, A. (2019) · Proceedings of International Structural Engineering and Construction · doi:10.14455/isec.2019.6(1).con-13 · Cited by 154
Mobile augmented reality applications for construction projects
Zaher, M., Greenwood, D. J., & Marzouk, M. M. (2018) · Construction Innovation · doi:10.1108/ci-02-2017-0013 · Cited by 152
Comparative analysis between integrated project delivery and lean project delivery
Mesa, H. A., Molenaar, K. R., & Alarcón, L. F. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.01.012 · Cited by 144
Collaborative Welding System using BIM for Robotic Reprogramming and Spatial Augmented Reality
Tavares, P., Costa, C. M., Rocha, L. F., Malaca, P., Costa, P., Moreira, A. P., Sousa, A. J., & Veiga, G. M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.04.020 · Cited by 139
Tactile internet and its applications in 5G era: A comprehensive review
Gupta, R., Tanwar, S., Tyagi, S., & Kumar, N. (2019) · International Journal of Communication Systems · doi:10.1002/dac.3981 · Cited by 136
Zhu, J., Wang, X., Chen, M., Wu, P., & Kim, M. J. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102859 · Cited by 135
Integrating BIM with building performance analysis in project life-cycle
Jin, R., Zhong, B., Ma, L., Hashemi, A., & Ding, L. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102861 · Cited by 126
A methodology for the optimal modularization of building design
Isaac, S., Bock, T. A., & Stoliar, Y. (2016) · Automation in Construction · doi:10.1016/j.autcon.2015.12.017 · Cited by 125
Supporting smart construction with dependable edge computing infrastructures and applications
Kochovski, P., & Stankovski, V. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.10.008 · Cited by 123
Cyber-physical systems integration of building information models and the physical construction
Akanmu, A., & Anumba, C. J. (2015) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-07-2014-0097 · Cited by 122
Cyber-physical systems for temporary structure monitoring
Yuan, X., Anumba, C., & Parfitt, M. K. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.02.005 · Cited by 121
Applications of BIM: A Brief Review and Future Outline
Pezeshki, Z., & Ivari, S. A. S. (2016) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-016-9204-1 · Cited by 120
Usability studies on building early stage architectural models in virtual reality
de Klerk, R., Duarte, A. M., Medeiros, D., Duarte, J. P., Jorge, J. A., & Lopes, D. S. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.009 · Cited by 119
The Potential of Blockchain in Building Construction
Dakhli, Z., Lafhaj, Z., & Mossman, A. (2019) · Buildings · doi:10.3390/buildings9040077 · Cited by 117
Sharafi, P., Rashidi, M., Samali, B., Ronagh, H. R., & Mortazavi, M. (2018) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000313 · Cited by 109
Dunston, P. S., & Wang, X. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:12(1301 · Cited by 105
Interference management issues for the future 5G network: a review
Qamar, F., Hindia, M. H. D. N., Dimyati, K., Noordin, K. A., & Amiri, I. S. (2019) · Telecommunication Systems · doi:10.1007/s11235-019-00578-4 · Cited by 101
Development of building energy saving advisory: A data mining approach
Ashouri, M., Haghighat, F., Fung, B. C. M., Lazrak, A., & Yoshino, H. (2018) · Energy and Buildings · doi:10.1016/j.enbuild.2018.04.052 · Cited by 101
Impact of Fragmentation Issue in Construction Industry: An Overview
Nawi, M. N. M., Baluch, N. H., & Bahauddin, A. Y. (2014) · MATEC Web of Conferences · doi:10.1051/matecconf/20141501009 · Cited by 100
Data mining approach to construction productivity prediction for cutter suction dredgers
Bai, S., Li, M., Kong, R., Han, S., Li, H., & Qin, L. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102833 · Cited by 100
Luo, H., & Paal, S. G. (2019) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12456 · Cited by 99
Blockchain-based multiple groups data sharing with anonymity and traceability
Huang, H., Chen, X., & Wang, J. (2019) · Science China Information Sciences · doi:10.1007/s11432-018-9781-0 · Cited by 98
Taleb, T., Afolabi, I., & Bagaa, M. (2019) · IEEE Network · doi:10.1109/mnet.2018.1800129 · Cited by 98
A new paradigm for Human-Building Interaction: the use of CFD and Augmented Reality
Malkawi, A. M., & Srinivasan, R. S. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.08.001 · Cited by 98
Industry 4.0 technologies basic network identification
da Costa, M. B., Santos, L. M. A. L. D., Schaefer, J. L., Baierle, I. C., & Nara, E. O. B. (2019) · Scientometrics · doi:10.1007/s11192-019-03216-7 · Cited by 95
Ghorbani, M. A., Khatibi, R. H., Karimi, V., Yaseen, Z. M., & Zounemat‐Kermani, M. (2018) · Water Resources Management · doi:10.1007/s11269-018-2038-x · Cited by 95
Paoletti, I. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.04.275 · Cited by 95
Design Assessment in Virtual and Mixed Reality Environments: Comparison of Novices and Experts
Wu, W., Hartless, J., Tesei, A., Gunji, V., Ayer, S. K., & London, J. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001683 · Cited by 94
Fire resistance evaluation through artificial intelligence - A case for timber structures
Naser, M. Z. (2019) · Fire Safety Journal · doi:10.1016/j.firesaf.2019.02.002 · Cited by 93
Hui, Y., Su, Z., Luan, T. H., & Cai, J. (2018) · IEEE Transactions on Intelligent Transportation Systems · doi:10.1109/tits.2018.2873096 · Cited by 87
Industrial renewal within the construction network
Håkansson, H., & Havenvid, M. I. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.737470 · Cited by 84
Zhang, Y., & Bai, L. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.013 · Cited by 79
Digital Twins as the Next Phase of Cyber-Physical Systems in Construction
Kan, C., & Anumba, D. O. C. (2019) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784482438.033 · Cited by 74
Determinants of Industrial Internet of Things Adoption in German Manufacturing Companies
Arnold, C., & Voigt, K. (2019) · International Journal of Innovation and Technology Management · doi:10.1142/s021987701950038x · Cited by 72
Barriers to adoption of RPAs on construction projects: a task–technology fit perspective
Golizadeh, H., Hosseini, M. R., Edwards, D. J., Abrishami, S., Taghavi, N., & Banihashemi, S. (2019) · Construction Innovation · doi:10.1108/ci-09-2018-0074 · Cited by 71
Benefits of Implementation of Common Data Environment (CDE) into Construction Projects
Jan, R., & Kaiser, J. (2019) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/471/2/022021 · Cited by 71
Pang, Z., Xu, P., O’Neill, Z. D., Gu, J., Qiu, S., Lu, X., & Li, X. (2018) · Building and Environment · doi:10.1016/j.buildenv.2018.05.030 · Cited by 68
Robotic data collection and simulation for evaluation of building retrofit performance
Mantha, B. R. K., Menassa, C. C., & Kamat, V. R. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.026 · Cited by 67
Muroni, A., Gaetani, I., Hoes, P.-J., & Hensen, J. J. (2019) · Building Simulation · doi:10.1007/s12273-019-0573-x · Cited by 63
Automated Bridge Inspection Using Mobile Ground Robotics
Charron, N., McLaughlin, E., Phillips, S., Goorts, K., Narasimhan, S., & Waslander, S. L. (2019) · Journal of Structural Engineering · doi:10.1061/(asce)st.1943-541x.0002404 · Cited by 62
Real-time occupancy prediction in a large exhibition hall using deep learning approach
Kim, S., Kang, S., Ryu, K. R., & Song, G. (2019) · Energy and Buildings · doi:10.1016/j.enbuild.2019.06.043 · Cited by 61
Integrating Ecosystem and Urban Services in Policy-Making at the Local Scale: The SOFA Framework
Antognelli, S., Vizzari, M., & Schulp, C. J. E. (2018) · Sustainability · doi:10.3390/su10041017 · Cited by 61
Smart Sensor: SoC Architecture for the Industrial Internet of Things
Urbina, M., Acosta, T., Lázaro, J., Astarloa, A., & Bidarte, U. (2019) · IEEE Internet of Things Journal · doi:10.1109/jiot.2019.2908264 · Cited by 60
Digital Twin concept for smart injection molding
Liau, Y. Y., Lee, H., & Ryu, K. R. (2018) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/324/1/012077 · Cited by 58
Role of real-time information-sharing through SaaS: An industry 4.0 perspective
Ghouri, A. M., & Mani, V. (2019) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2019.05.026 · Cited by 55
Industry 4.0: tools and implementation
Sanghavi, D., Parikh, S., & Raj, S. A. (2019) · Management and Production Engineering Review · doi:10.24425/mper.2019.129593 · Cited by 55
Configuring and operating global production networks
Jaehne, D. M., Li, M., Riedel, R., & Mueller, E. (2009) · International Journal of Production Research · doi:10.1080/00207540802375697 · Cited by 55
Xue, F., Chen, K., Lu, W., Niu, Y., & Huang, G. Q. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.023 · Cited by 55
Navarro-Rubio, J., Pineda, P., & Martínez, A. G. (2018) · Sustainable Cities and Society · doi:10.1016/j.scs.2018.10.045 · Cited by 54
Augmented Reality for Identifying Maintainability Concerns during Design
Khalek, I. A., Chalhoub, J., & Ayer, S. K. (2019) · Advances in Civil Engineering · doi:10.1155/2019/8547928 · Cited by 53
Napolitano, R., & Glišić, B. (2018) · Engineering Structures · doi:10.1016/j.engstruct.2018.12.036 · Cited by 53
Cuerda, E., Guerra-Santin, O., Sendra, J. J., & González, F. J. N. (2019) · Building Simulation · doi:10.1007/s12273-019-0539-z · Cited by 49
Cadini, F., Sbarufatti, C., Corbetta, M., Cancelliere, F., & Giglio, M. (2019) · Structural Control and Health Monitoring · doi:10.1002/stc.2451 · Cited by 44
Sun, C. T., Zhang, R., Sharples, S., Han, Y., & Zhang, H. (2018) · Building and Environment · doi:10.1016/j.buildenv.2018.12.036 · Cited by 43
Diagnoses in the Aging Process of Residential Buildings Constructed Using Traditional Technology
Nowogońska, B. (2019) · Buildings · doi:10.3390/buildings9050126 · Cited by 43
Yan, L., Fang, X., & Fang, Y. M. (2017) · IEEE Transactions on Intelligent Transportation Systems · doi:10.1109/tits.2017.2685426 · Cited by 41
Fatigue performance of distributed optical fiber sensors in reinforced concrete elements
Barrias, A., Casas, J. R., & Villalba, S. (2019) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2019.05.072 · Cited by 41
Potočnik, P., Vidrih, B., Kitanovski, A., & Govekar, E. (2019) · Building Simulation · doi:10.1007/s12273-019-0548-y · Cited by 36
The future of computing and wisdom: Insights from Human–Computer Interaction
Pargman, D. S., Eriksson, E., Bates, O., Kirman, B. J., Comber, R., Hedman, A., & van den Broeck, M. (2019) · Futures · doi:10.1016/j.futures.2019.06.006 · Cited by 36
Ma, G., Jun, J., & Shang, S. (2019) · Advances in Civil Engineering · doi:10.1155/2019/6870507 · Cited by 35
Big data analytics and cloud computing for sustainable building energy efficiency
Chou, J., Ngo, N.-T., Chong, W. K., & Gibson, G. E. (2016) · Elsevier eBooks · doi:10.1016/b978-0-08-100546-0.00016-9 · Cited by 33
Duryan, M., & Smyth, H. (2018) · Built Environment Project and Asset Management · doi:10.1108/bepam-04-2018-0060 · Cited by 31
BIM-based software for construction waste analytics using artificial intelligence hybrid models
Akinadé, O. O. (2017) · UWE Research Repository (UWE Bristol) · Cited by 30
Human-Robot Interaction in an Unknown Human Intention Scenario
Awais, M., & Henrich, D. (2013) · International Conference on Frontiers of Information Technology (FIT) · doi:10.1109/fit.2013.24 · Cited by 29
Prediction of bond performance of tension lap splices using artificial neural networks
Hwang, H., Baek, J.-W., Kim, J., & Kim, C.-S. (2019) · Engineering Structures · doi:10.1016/j.engstruct.2019.109535 · Cited by 29
Integration of Social Media in Day-to-Day Operations of Construction Firms
Azhar, S., Riaz, Z., & Robinson, D. W. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000660 · Cited by 28
Artificial Intelligence Applications in Civil Engineering
Dede, T., Kankal, M., Vosoughi, A. R., Grzywıńskı, M., & Kripka, M. (2019) · Advances in Civil Engineering · doi:10.1155/2019/8384523 · Cited by 28
Cartography for Civil Engineering Projects: Photogrammetry Supported by Unmanned Aerial Vehicles
Reinoso-Gordo, J. F., Gonçalves, J. E., Pereira, C., et al. (2017) · Iranian Journal of Science and Technology Transactions of Civil Engineering · doi:10.1007/s40996-017-0076-x · Cited by 26
Liu, M., Han, S., & Lee, S. H. (2017) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784480847.018 · Cited by 26
Risk source-based constructability appraisal using supervised machine learning
Kifokeris, D., & Xenidis, Y. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.04.012 · Cited by 25
Slika, W., & Saad, G. A. (2016) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2016.04.025 · Cited by 24
Integrative Simulation Environment for Conceptual Structural Analysis
Li, G., & Kuester, F. (2014) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000405 · Cited by 19
A pattern-based decision framework in the era of Industry 4.0
Shin, W. S., Lee, Y., & Dahlgaard, J. J. (2019) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2019.1665840 · Cited by 17
Enabling a self-sufficient energy efficient retrofit services sector future: A qualitative study
Gooding, L., & Gul, M. (2017) · Energy and Buildings · doi:10.1016/j.enbuild.2017.09.072 · Cited by 15
Le, C., Le, T., Jeong, H. D., & Lee, E. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001672 · Cited by 12
Client-oriented Building Mass Customization (CoBMC)
Lee, X. S., Khamidi, M. F., Kuppusamy, S., & Heng, C. T. (2017) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/291/1/012011 · Cited by 11
Modeling the cybersecurity of hospitals in natural and man-made hazards
Zhao, X., Miers, I., Green, M., & Mitrani‐Reiser, J. (2018) · Sustainable and Resilient Infrastructure · doi:10.1080/23789689.2018.1448666 · Cited by 11
Open Computing Infrastructure for Sharing Data Analytics to Support Building Energy Simulations
Karaguzel, O. T., Elshambakey, M., Zhu, Y., Hong, T., Tolone, W. J., Bhattacharjee, S. D., Cho, I., Wenwen Dou, A., Wang, H., Lu, S., et al. (2019) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000857 · Cited by 10
Bukhsh, F. A., & Weigand, H. (2017) · International Conference on Frontiers of Information Technology (FIT) · doi:10.1109/fit.2017.00049 · Cited by 7
Simulation of Nonlinear Behavior of Beam Structures Based on Discrete Element Method
Feng, R., Zhu, B., Hu, C., & Wang, X. (2019) · International Journal of Steel Structures · doi:10.1007/s13296-019-00228-0 · Cited by 5
Metadata
- Authors
- Muñoz-La Rivera, F., Mora-Serrano, J., Valero, I., & Oñate, E.
- Venue
- Archives of Computational Methods in Engineering
- Published
- 2020-06-29
- Volume
- 28
- Issue
- 2
- Pages
- 689-711
- ISSN
- 1134-3060 (ISSN-L)
- 1886-1784
- OpenAlex
- W3039169703
- Cited by
- 178
- References
- 148
- FWCI
- 12.63
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.