The DOI matches its Crossref record; 139 of the 139 references it cites were found in a registry or an index.
A state-of the-art survey & testbed of fuzzy AHP (FAHP) applications
Open accessOverview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,852
The Internet of Things: A survey
Atzori, L., Iera, A., & Morabito, G. (2010) · Computer Networks · doi:10.1016/j.comnet.2010.05.010 · Cited by 15,613
The Analytic Hierarchy Process
SAATY, T. L., & KEARNS, K. P. (1985) · Analytical Planning · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,357
Multiple Attribute Decision Making: Methods and Applications
Chen, S.-J. J., Hwang, C. L., Beckmann, M. J., & Krelle, W. E. (1981) · Medical Entomology and Zoology · Cited by 8,207
Applications of the Extent Analysis Method on Fuzzy AHP
Chang, D.-Y. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00300-2 · Cited by 4,874
Survey of multi-objective optimization methods for engineering
Marler, R. T., & Arora, J. S. (2004) · Structural and Multidisciplinary Optimization · doi:10.1007/s00158-003-0368-6 · Cited by 4,710
Analytic hierarchy process: An overview of applications
Vaidya, O. S., & Kumar, S. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.04.028 · Cited by 3,800
Buckley, J. J. (1985) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(85)90090-9 · Cited by 3,360
A fuzzy extension of Saaty's priority theory
van Laarhoven, P. J. M., & Pedrycz, W. (1983) · Fuzzy Sets and Systems · doi:10.1016/s0165-0114(83)80082-7 · Cited by 3,045
Chen, M., Mao, S., & Liu, Y. (2014) · Mobile Networks and Applications · doi:10.1007/s11036-013-0489-0 · Cited by 2,913
A state-of the-art survey of TOPSIS applications
Behzadian, M., Khanmohammadi Otaghsara, S., Yazdani, M., & Ignatius, J. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2012.05.056 · Cited by 2,690
Models, Methods, Concepts & Applications of the Analytic Hierarchy Process
Saaty, T. L., & Vargas, L. G. (2012) · International Series in Operations Research & Management Science · doi:10.1007/978-1-4614-3597-6 · Cited by 2,210
The Analytic Hierarchy Process: Structuring, Measurement, and Synthesis
Wang, J., Chakraborty, C., & Ouyang, H. (2011) · Encyclopedia of Decision Making and Decision Support Technologies · doi:10.4018/9781599048437.ch003 · Cited by 1,328
Handbook of Combinatorial Optimization
(1999) · Springer eBooks · doi:10.1007/978-1-4757-3023-4 · Cited by 1,216
(2012) · Routledge eBooks · doi:10.4324/9780080493084-11 · Cited by 1,105
Mardani, A., Jusoh, A., & Zavadskas, E. K. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.01.003 · Cited by 951
A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection
Lima Junior, F. R., Osiro, L., & Carpinetti, L. C. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.03.014 · Cited by 820
A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods
Sun, C.-C. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.04.066 · Cited by 815
On the extent analysis method for fuzzy AHP and its applications
Wang, Y., Luo, Y., & Hua, Z. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2007.01.050 · Cited by 765
Kannan, D., Khodaverdi, R., Olfat, L., Jafarian, A., & Diabat, A. (2013) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2013.02.010 · Cited by 741
Global supplier selection: a fuzzy-AHP approach
Chan, F. T. S., Kumar, N., Tiwari, M. K., Lau, H. C. W., & Choy, K. L. (2008) · International Journal of Production Research · doi:10.1080/00207540600787200 · Cited by 665
Zadeh, L. A. (1971) · Information Sciences · doi:10.1016/s0020-0255(71)80004-x · Cited by 663
Lee, A. H. I., Chen, W.-C., & Chang, C.-J. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2006.08.022 · Cited by 661
Shaw, K., Shankar, R., Yadav, S. S., & Thakur, L. S. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2012.01.149 · Cited by 609
Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP
Kutlu, A. C., & Ekmekçioğlu, M. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.06.044 · Cited by 594
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574
Gumus, A. T. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.03.013 · Cited by 552
Ertuğrul, İ., & Karakaşoğlu, N. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.10.014 · Cited by 531
A fuzzy MCDM approach for evaluating banking performance based on Balanced Scorecard
Wu, H.-Y., Tzeng, G.-H., & Chen, Y.-H. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.01.005 · Cited by 512
Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process
Wang, L., Chu, J., & Wu, J. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.08.005 · Cited by 474
Fuzzy hierarchical analysis: the Lambda-Max method
Csutora, R., & Buckley, J. J. (2001) · Fuzzy Sets and Systems · doi:10.1016/s0165-0114(99)00155-4 · Cited by 447
Önüt, S., Kara, S. S., & Elif, I. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.02.045 · Cited by 437
Enterprise information systems project implementation:
Yusuf, Y., Gunasekaran, A., & Abthorpe, M. S. (2004) · International Journal of Production Economics · doi:10.1016/j.ijpe.2003.10.004 · Cited by 414
Mosadeghi, R., Warnken, J., Tomlinson, R. B., & Mirfenderesk, H. (2014) · Computers Environment and Urban Systems · doi:10.1016/j.compenvurbsys.2014.10.001 · Cited by 411
Evaluating teaching performance based on fuzzy AHP and comprehensive evaluation approach
Chen, J.-F., Hsieh, H.-N., & Do, Q. H. (2015) · Applied Soft Computing · doi:10.1016/j.asoc.2014.11.050 · Cited by 408
Choudhary, D. K., & Shankar, R. (2012) · Energy · doi:10.1016/j.energy.2012.03.010 · Cited by 402
Büyüközkan, G., & Çifçi, G. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.08.061 · Cited by 393
Fuzzy performance evaluation in Turkish Banking Sector using Analytic Hierarchy Process and TOPSIS
Seçme, N. Y., Bayrakdaroğlu, A., & Kahraman, C. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.03.013 · Cited by 383
Zheng, G., Zhu, N., Tian, Z., Chen, Y., & Sun, B. (2012) · Safety Science · doi:10.1016/j.ssci.2011.08.042 · Cited by 381
Liu, H.-C., You, J.-X., You, X.-Y., & Shan, M.-M. (2015) · Applied Soft Computing · doi:10.1016/j.asoc.2014.11.036 · Cited by 377
Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process
Azizi, A., & Fathi, K. (2014) · Management Science Letters · doi:10.5267/j.msl.2014.3.028 · Cited by 374
Fuzzy AHP approach for selecting the suitable bridge construction method
Pan, N.-F. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.03.005 · Cited by 361
Strategic analysis of healthcare service quality using fuzzy AHP methodology
Büyüközkan, G., Çifçi, G., & Güleryüz, S. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.01.103 · Cited by 343
A combined methodology for supplier selection and performance evaluation
Zeydan, M., Çolpan, C., & Çobanoğlu, C. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.08.064 · Cited by 331
A framework for measuring the performance of service supply chain management
Cho, D. W., Lee, Y. H., Ahn, S. H., & Hwang, M. K. (2012) · Computers & Industrial Engineering · doi:10.1016/j.cie.2011.11.014 · Cited by 322
Analyzing the drivers of green manufacturing with fuzzy approach
Govindan, K., Diabat, A., & Madan Shankar, K. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.02.054 · Cited by 308
Cebeci, U. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.11.046 · Cited by 302
The role of fuzzy sets in decision sciences: Old techniques and new directions
Dubois, D. (2011) · Fuzzy Sets and Systems · doi:10.1016/j.fss.2011.06.003 · Cited by 297
Computer-aided machine-tool selection based on a Fuzzy-AHP approach
Durán, O., & Aguilo, J. (2007) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.01.046 · Cited by 297
Cebeci, F. (2009) · Cited by 259
On the normalization of interval and fuzzy weights
Wang, Y., & Elhag, T. (2006) · Fuzzy Sets and Systems · doi:10.1016/j.fss.2006.06.008 · Cited by 253
An application of fuzzy AHP for evaluating course website quality
Lin, H.-F. (2010) · Computers & Education · doi:10.1016/j.compedu.2009.09.017 · Cited by 249
Jordan, P. (1991) · Manufacturing Engineer · doi:10.1049/me:19910144 · Cited by 248
A fuzzy AHP-based simulation approach to concept evaluation in a NPD environment
Ayağ, Z. (2005) · IIE Transactions · doi:10.1080/07408170590969852 · Cited by 228
Yüksel, İ., & Dağdeviren, M. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.06.002 · Cited by 222
Akkaya, G., Şirin, B. T., & Öztaş, S. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.07.061 · Cited by 219
Singh, S., Olugu, E. U., Musa, S. N., & Mahat, A. B. (2015) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-015-1081-1 · Cited by 195
Somsuk, N., & Laosirihongthong, T. (2014) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2013.08.007 · Cited by 195
Operating system selection using fuzzy replacement analysis and analytic hierarchy process
Tolga, E., Demircan, M. L., & Kahraman, C. (2004) · International Journal of Production Economics · doi:10.1016/j.ijpe.2004.07.001 · Cited by 193
Landfill site selection using fuzzy AHP and fuzzy TOPSIS: a case study for Istanbul
Beşkese, A., Demir, H. H., Özcan, H. K., & Ökten, H. E. (2014) · Environmental Earth Sciences · doi:10.1007/s12665-014-3635-5 · Cited by 190
Mandic, K., Delibasic, B., Knezevic, S., & Benkovic, S. (2014) · Economic Modelling · doi:10.1016/j.econmod.2014.07.036 · Cited by 189
Fuzzy AHP-based multicriteria decision making systems using particle swarm optimization
Javanbarg, M. B., Scawthorn, C., Kiyono, J., & Shahbodaghkhan, B. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.07.095 · Cited by 188
(2013) · Encyclopedia of Corporate Social Responsibility · doi:10.1007/978-3-642-28036-8_101220 · Cited by 185
Celik, M., Deha Er, I., & Ozok, A. F. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.09.004 · Cited by 182
Cho, J., & Lee, J. (2013) · Expert Systems with Applications · doi:10.1016/j.eswa.2013.03.038 · Cited by 179
Fuzzy AHP-based study of cleaner production implementation in Taiwan PWB manufacturer
Tseng, M.-L., Lin, Y.-H., & Chiu, A. S. F. (2009) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2009.03.022 · Cited by 179
Fouladgar, M. M., Yazdani–Chamzini, A., Lashgari, A., Zavadskas, E. K., & Turskis, Z. (2012) · International Journal of Strategic Property Management · doi:10.3846/1648715x.2012.666657 · Cited by 170
Lupo, T. (2013) · Expert Systems with Applications · doi:10.1016/j.eswa.2013.06.045 · Cited by 166
Dehghanian, P., Fotuhi-Firuzabad, M., Bagheri-Shouraki, S., & Razi Kazemi, A. A. (2012) · IEEE Systems Journal · doi:10.1109/jsyst.2011.2177134 · Cited by 165
A new hesitant fuzzy QFD approach: An application to computer workstation selection
Onar, S. Ç., Büyüközkan, G., Öztayşi, B., & Kahraman, C. (2016) · Applied Soft Computing · doi:10.1016/j.asoc.2016.04.023 · Cited by 152
Nezarat, H., Sereshki, F., & Ataei, M. (2015) · Tunnelling and Underground Space Technology · doi:10.1016/j.tust.2015.07.019 · Cited by 147
Garg, C. P., & Barua, M. K. (2016) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2015.12.011 · Cited by 146
An integrated fuzzy multi criteria group decision making approach for ERP system selection
Efe, B. (2015) · Applied Soft Computing · doi:10.1016/j.asoc.2015.09.037 · Cited by 143
Identification and prioritization of coordination barriers in humanitarian supply chain management
Kabra, G., Ramesh, A., & Arshinder, K. (2015) · International Journal of Disaster Risk Reduction · doi:10.1016/j.ijdrr.2015.01.011 · Cited by 142
Fuzzy analytic hierarchy process: Fallacy of the popular methods
Zhü, K. (2013) · European Journal of Operational Research · doi:10.1016/j.ejor.2013.10.034 · Cited by 141
A fuzzy analytic network process model to mitigate the risks associated with offshore wind farms
Shafiee, M. (2014) · Expert Systems with Applications · doi:10.1016/j.eswa.2014.10.019 · Cited by 137
A multi-phased QFD based optimization approach to sustainable service design
Chowdhury, M. M. H., & Quaddus, M. (2015) · International Journal of Production Economics · doi:10.1016/j.ijpe.2015.09.023 · Cited by 134
Tan, R. R., Aviso, K. B., Huelgas, A. P., & Promentilla, M. A. B. (2013) · Process Safety and Environmental Protection · doi:10.1016/j.psep.2013.11.005 · Cited by 131
Evaluating emergency response capacity by fuzzy AHP and 2-tuple fuzzy linguistic approach
Ju, Y., Wang, A., & Liu, X. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2012.01.061 · Cited by 131
Lupo, T. (2014) · Journal of Air Transport Management · doi:10.1016/j.jairtraman.2014.11.006 · Cited by 127
An application of nonlinear fuzzy analytic hierarchy process in safety evaluation of coal mine
Wang, Q., Wang, H., & Qi, Z. (2016) · Safety Science · doi:10.1016/j.ssci.2016.02.012 · Cited by 125
MARKET SEGMENT EVALUATION AND SELECTION BASED ON APPLICATION OF FUZZY AHP AND COPRAS-G METHODS
Aghdaie, M. H., Zolfani, S. H., & Zavadskas, E. K. (2012) · Journal of Business Economics and Management · doi:10.3846/16111699.2012.721392 · Cited by 124
Ren, J., Fedele, A., Mason, M., Manzardo, A., & Scipioni, A. (2013) · International Journal of Hydrogen Energy · doi:10.1016/j.ijhydene.2013.05.074 · Cited by 123
Product intelligence in industrial control: Theory and practice
McFarlane, D., Giannikas, V., Wong, A. C. Y., & Harrison, M. G. (2013) · Annual Reviews in Control · doi:10.1016/j.arcontrol.2013.03.003 · Cited by 122
Sparsity Preserving Discriminant Projections with Applications to Face Recognition
Ren, Y., Wang, Z., Chen, Y., & Zhao, W. (2016) · Mathematical Problems in Engineering · doi:10.1155/2016/5269236 · Cited by 118
There is no mathematical validity for using fuzzy number crunching in the analytic hierarchy process
Saaty, T. L. (2006) · Journal of Systems Science and Systems Engineering · doi:10.1007/s11518-006-5021-7 · Cited by 116
Bidding strategy to support decision-making by integrating fuzzy AHP and regression-based simulation
Chou, J., Pham, A., & Wang, H. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.06.007 · Cited by 113
Yeap, J. A. L., Ignatius, J., & Ramayah, T. (2013) · Computers in Human Behavior · doi:10.1016/j.chb.2013.10.034 · Cited by 110
Bereketli, İ., & Genevois, M. E. (2013) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2013.03.053 · Cited by 104
A fuzzy multi-criteria decision making approach to assess building energy performance
Kabak, M., Köse, E., Kırılmaz, O., & Burmaoğlu, S. (2014) · Energy and Buildings · doi:10.1016/j.enbuild.2013.12.059 · Cited by 104
Supply chain performance measurement for third party logistics
Jothimani, D., & Sarmah, S. P. (2014) · Benchmarking An International Journal · doi:10.1108/bij-09-2012-0064 · Cited by 99
Computer-aided maintenance management systems selection based on a fuzzy AHP approach
Durán, O. (2011) · Advances in Engineering Software · doi:10.1016/j.advengsoft.2011.05.023 · Cited by 97
Cost-benefit analysis of different hydrogen production technologies using AHP and Fuzzy AHP
Thengane, S. K., Hoadley, A., Bhattacharya, S., Mitra, S., & Bandyopadhyay, S. K. (2014) · International Journal of Hydrogen Energy · doi:10.1016/j.ijhydene.2014.07.107 · Cited by 94
Risk assessment of bridges under multiple hazards in operation period
Andrić, J. M., & Lü, D. (2015) · Safety Science · doi:10.1016/j.ssci.2015.11.001 · Cited by 94
Ren, J., Gao, S., Tan, S., Dong, L., Scipioni, A., & Mazzi, A. (2014) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2014.09.028 · Cited by 92
Deng, Y., Xu, L., Liu, Y., & Mancl, K. M. (2014) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2014.04.031 · Cited by 91
Enhancing China’s energy security: Determining influential factors and effective strategic measures
Ren, J., & Sovacool, B. K. (2014) · Energy Conversion and Management · doi:10.1016/j.enconman.2014.09.001 · Cited by 90
Shaverdi, M., Ramezani, I., Tahmasebi, R., & Rostamy, A. A. A. (2016) · International Journal of Fuzzy Systems · doi:10.1007/s40815-016-0142-8 · Cited by 89
Şen, C. G., & Çınar, G. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.06.075 · Cited by 86
Lee, S. K., Mogi, G., & Kim, J. W. (2009) · Journal of Loss Prevention in the Process Industries · doi:10.1016/j.jlp.2009.07.001 · Cited by 84
Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2
Zou, P. X. W., & Li, J. (2010) · Construction Management and Economics · doi:10.1080/01446193.2010.519781 · Cited by 83
Rostamzadeh, R., & Sofian, S. B. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.10.045 · Cited by 82
Moalagh, M., & Ravasan, A. Z. (2012) · International Journal of Production Research · doi:10.1080/00207543.2012.698318 · Cited by 82
Mangla, S. K., Kumar, P., & Barua, M. K. (2014) · Global Journal of Flexible Systems Management · doi:10.1007/s40171-014-0081-x · Cited by 81
Stark, J. (2015) · Decision engineering · doi:10.1007/978-3-319-24436-5_1 · Cited by 77
Do Decision Makers Know What They Prefer?: MAVT and ELECTRE II
Simpson, L. (1996) · Journal of the Operational Research Society · doi:10.1057/jors.1996.117 · Cited by 76
The Evaluation of Hotel Website Functionality by Fuzzy Analytic Hierarchy Process
Ip, C., Law, R., & Lee, A. (2012) · Journal of Travel & Tourism Marketing · doi:10.1080/10548408.2012.666173 · Cited by 76
Aryafar, A., Yousefi, S., & Ardejani, F. D. (2012) · Environmental Earth Sciences · doi:10.1007/s12665-012-1910-x · Cited by 74
Kumar, A., Shankar, R., & Debnath, R. M. (2014) · Telematics and Informatics · doi:10.1016/j.tele.2014.10.003 · Cited by 74
Zolfani, S. H., Sedaghat, M., & Zavadskas, E. K. (2012) · Technological and Economic Development of Economy · doi:10.3846/20294913.2012.685110 · Cited by 73
Evaluating the critical success factors of supplier development: a case study
Routroy, S., & Pradhan, S. K. (2013) · Benchmarking An International Journal · doi:10.1108/14635771311318117 · Cited by 71
An improved fuzzy preference programming to evaluate entrepreneurship orientation
Rezaei, J., Ortt, R., & Scholten, V. E. (2012) · Applied Soft Computing · doi:10.1016/j.asoc.2012.11.012 · Cited by 68
A method for the evaluation of risk in IT projects
Rodríguez, A., Fernández, F. O., & Concepción, R. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.09.056 · Cited by 68
Sabaghi, M., Mascle, C., Baptiste, P., & Rostamzadeh, R. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2016.02.038 · Cited by 68
Jaganathan, S., Erinjeri, J. J., & Ker, J.-I. (2006) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-006-0446-1 · Cited by 67
Chen, L., & Hung, C.-C. (2010) · International Journal of Production Research · doi:10.1080/00207540903365308 · Cited by 64
Duru, O., Bulut, E., & Yoshida, S. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.10.020 · Cited by 64
Wang, C.-H. (2014) · Computers & Industrial Engineering · doi:10.1016/j.cie.2014.10.005 · Cited by 63
A COMPARISON OF FUZZY MULTICRITERIA DECISION MAKING METHODS FOR INTELLIGENT BUILDING ASSESSMENT
Kaya, İ., & Kahraman, C. (2014) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2013.801906 · Cited by 63
Port safety evaluation from a captain’s perspective: The Korean experience
Pak, J.-Y., Yeo, G., Oh, S., & Yang, Z. (2014) · Safety Science · doi:10.1016/j.ssci.2014.09.007 · Cited by 52
A hybrid fuzzy group decision support framework for advanced-technology prioritization at NASA
Tavana, M., Khalili‐Damghani, K., & Abtahi, A. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2012.07.040 · Cited by 49
An integrated framework for mechatronics based product development in a fuzzy environment
Parameshwaran, R., Baskar, C., & Karthik, T. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.11.013 · Cited by 47
Indicators of Entrepreneurial University: Fuzzy AHP and Fuzzy TOPSIS Approach
Mavi, R. K. (2014) · Journal of the Knowledge Economy · doi:10.1007/s13132-014-0197-4 · Cited by 45
Le, T. N., Quyen, H. A., & Nguyen, N. A. (2015) · International Journal of Electrical Power & Energy Systems · doi:10.1016/j.ijepes.2015.11.044 · Cited by 45
Ballı, S., & Korukoğlu, S. (2012) · Expert Systems · doi:10.1111/exsy.12002 · Cited by 42
Mačužić, I., Tadić, D., Aleksić, A., & Stefanovic, M. Z. (2015) · Journal of Loss Prevention in the Process Industries · doi:10.1016/j.jlp.2015.12.013 · Cited by 41
A spatial web/agent-based model to support stakeholders' negotiation regarding land development
Pooyandeh, M., & Marceau, D. J. (2013) · Journal of Environmental Management · doi:10.1016/j.jenvman.2013.07.028 · Cited by 40
A hybrid intelligent approach for supply chain management system
Kubat, C., & Yüce, B. (2010) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-010-0431-2 · Cited by 38
A fuzzy ANP model for the selection of 3D coordinate-measuring machine
Kumru, M., & Yıldız, P. (2014) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-014-0882-y · Cited by 32
Roghanian, E., & Alipour, M. (2014) · Journal of industrial engineering international · doi:10.1007/s40092-014-0068-4 · Cited by 32
Group fuzzy AHP approach to embed relevant data on “communicating material”
Sylvain Kubler, A., Voisin, A., Derigent, W. J. E., André Thomas, B., Rondeau, É., & Främling, K. (2014) · Computers in Industry · doi:10.1016/j.compind.2014.01.018 · Cited by 31
Self-citationMirhedayatian, M., Jafarian, M., Adnani, S., et al. (2013) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-013-4856-6 · Cited by 29
Multicriteria model for maintenance benchmarking
Carnero, M. C. (2014) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2013.12.006 · Cited by 28
Rostamzadeh, R., Ismail, K., & Noubar, H. B. K. (2014) · The Scientific World JOURNAL · doi:10.1155/2014/703650 · Cited by 23
Zare, R., Nouri, J., Abdoli, M. A., Atabi, F., & Alavi, M. (2016) · Advances in Materials Science and Engineering · doi:10.1155/2016/1359691 · Cited by 16
Technology Evaluation and Selection of 3DIC Integration Using a Three-Stage Fuzzy MCDM
Lee, Y.-C., & Chou, C. P. (2016) · Sustainability · doi:10.3390/su8020114 · Cited by 13
Develop a ranking algorithm for the green building project
Chang, C. (2012) · Quality & Quantity · doi:10.1007/s11135-012-9812-2 · Cited by 12
Selection of Key Component Vendor from the Aspects of Capability, Productivity, and Reliability
Yu, V. F., Kuo, C. W., & Dat, L. Q. (2014) · Mathematical Problems in Engineering · doi:10.1155/2014/124652 · Cited by 6
Cited by
A review of fuzzy AHP methods for decision-making with subjective judgements
Liu, Y., Eckert, C. M., & Earl, C. (2020) · Expert Systems with Applications · doi:10.1016/j.eswa.2020.113738 · Cited by 1,079
Inundation risk assessment of metro system using AHP and TFN-AHP in Shenzhen
Lyu, H.-M., Zhou, W.-H., Shen, S.-L., & Zhou, A.-N. (2020) · Sustainable Cities and Society · doi:10.1016/j.scs.2020.102103 · Cited by 366
Calabrese, A., Costa, R., Levialdi, N., & Menichini, T. (2019) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2018.11.005 · Cited by 279
Lin, S.-S., Shen, S.-L., Zhou, A., & Xu, Y.-S. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103490 · Cited by 271
Bimodal fuzzy analytic hierarchy process (BFAHP) for coronary heart disease risk assessment
Sabahi, F. (2018) · Journal of Biomedical Informatics · doi:10.1016/j.jbi.2018.03.016 · Cited by 36
Metadata
- Authors
- Kubler, S., Robert, J., Derigent, W., Voisin, A., & Le Traon, Y.
- Venue
- Expert Systems with Applications
- Publisher
- Elsevier BV
- Published
- 2016-12
- Volume
- 65
- Pages
- 398-422
- ISSN
- 0957-4174 (ISSN-L)
- OpenAlex
- W2512479836
- Cited by
- 441
- References
- 139
- FWCI
- 39.05
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.