Factors affecting cost performance: evidence from Indian construction projects
The DOI matches its Crossref record; 10 of the 10 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The essentials of factor analysis
Child, D. (1970) · Medical Entomology and Zoology · Cited by 1,652
Beaver, R. J., & Press, S. J. (1973) · Biometrics · doi:10.2307/2529157 · Cited by 974
A comparative study of causes of time overruns in Hong Kong construction projects
Chan, D. W., & Kumaraswamy, M. M. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00039-7 · Cited by 831
(2004) · Springer Texts in Statistics · doi:10.1007/b98963 · Cited by 517
Systems Analysis and Project Management.
Schmidt, R. N., Cleland, D. I., & King, W. R. (1969) · Administrative Science Quarterly · doi:10.2307/2391604 · Cited by 411
Design and Build Project Success Factors: Multivariate Analysis
Chan, A. P. C., Ho, D. C. K., & Tam, C. M. (2001) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2001)127:2(93 · Cited by 316
Morris, P. W. G., & Hough, G. (1987) · UCL Discovery (University College London) · Cited by 300
Critical Success Factors in R&D Projects
Pinto, J. K., & Slevin, D. P. (1989) · Research-Technology Management · doi:10.1080/08956308.1989.11670572 · Cited by 294
Why Does Project Management Fail?
Avots, I. (1969) · California Management Review · doi:10.2307/41164208 · Cited by 167
Somers, M. J., & Birnbaum, D. (1991) · Human Relations · doi:10.1177/001872679104401004 · Cited by 35
Cited by
Critical success factors for lean implementation within SMEs
Achanga, P., Shehab, E., Roy, R., & Nelder, G. (2006) · Journal of Manufacturing Technology Management · doi:10.1108/17410380610662889 · Cited by 1,008
Analysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745
Self-citationOlawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478
“using the following formula, as adopted by Kumaraswany and Chan (1997, 1998), Assaf et al (1995) and Iyer and Jha (2005):”
MethodFactors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000391 · Cited by 365
Eriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363
Doloi, H. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000621 · Cited by 325
Commitment, coordination, competence and the iron triangle
Jha, K. N., & Iyer, K. C. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.009 · Cited by 243
“These 55 attributes were collected through case studies, project management literatures and personal interviews of experts in construction industry [24,27].”
BackgroundSelf-citationAn epistemological evaluation of research into projects and their management: Methodological issues
Smyth, H. J., & Morris, P. W. G. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.01.006 · Cited by 241
Parsamehr, M., Perera, U. S., Dodanwala, T. C., Perera, P., & Ruparathna, R. (2023) · Asian Journal of Civil Engineering · doi:10.1007/s42107-022-00501-4 · Cited by 193
“…include poor site management, information delays, changes in scope, aggressive competition, slow decision-making due to its isolated nature, and the usage of traditional cost accounting methods and software (Iyer & Jha, 2005; Shane et al., 2009; Trost et al., 2003; Williams & Gong, 2014).”
MethodPerceptions of the impact of project sponsorship practices on project success
Bryde, D. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.12.001 · Cited by 182
Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore
Li, Y. Y., Chen, P.-H., Chew, D. A. S., Teo, C. C., & Ding, R. G. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000370 · Cited by 174
Zhang, L., Cao, T., & Wang, Y. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.08.014 · Cited by 173
“Keeping favorable collaboration helps not only achieve short-term business objectives such as the three success criteria of cost, time, and quality (Iyer and Jha, 2005; Chiocchio et al., 2011; Kärnä et al., 2013; Brito et al., 2014), but also foster harmonious working relationships and important…”
BackgroundEvolution of studies in construction productivity: A systematic literature review (2006–2017)
Dixit, S., Mandal, S. N., Thanikal, J. V., & Saurabh, K. (2019) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2018.10.010 · Cited by 162
Causes of delay in residential construction projects in Cambodia
Durdyev, S., Omarov, M., & Ismail, S. (2017) · Cogent Engineering · doi:10.1080/23311916.2017.1291117 · Cited by 158
“However, in their studies conducted for the specific locations, Iyer and Jha (2005), Sambasivan and Soon (2007) and Abd El-Razek, Bassioni, and Mobarak (2008) reported the complexity of the delay analysis.”
Background
Metadata
- Authors
- Iyer, K. C., & Jha, K. N.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2005-05
- Volume
- 23
- Issue
- 4
- Pages
- 283-295
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2018207929
- Cited by
- 504
- References
- 10
- FWCI
- 7.85
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.