A fuzzy approach to construction project risk assessment
Open accessThe DOI matches its Crossref record; 28 of the 28 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,857
Multiple Attribute Decision Making: Methods and Applications
Chen, S.-J. J., Hwang, C. L., Beckmann, M. J., & Krelle, W. E. (1981) · Medical Entomology and Zoology · Cited by 8,207
Fuzzy Sets and Fuzzy Logic: Theory and Applications
Klir, G. J., & Yuan, B. (1995) · Medical Entomology and Zoology · Cited by 6,240
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Introduction to Fuzzy Arithmetic
Kaufmann, A., & Gupta, M. M. (1991) · Van Nostrand Reinhold eBooks · Cited by 3,020
DUBOIS, D., & PRADE, H. (1978) · International Journal of Systems Science · doi:10.1080/00207727808941724 · Cited by 2,696
Some issues on consistency of fuzzy preference relations
Herrera-Viedma, E., Herrera, F., Chiclana, F., & Luque, M. (2004) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00725-7 · Cited by 1,000
Modelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 587
Project Risk Management: Processes, Techniques and Insights
Smith, J. U. M. (1998) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600022 · Cited by 555
Application of a fuzzy based decision making methodology to construction project risk assessment
Zeng, J., An, M., & Smith, N. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.006 · Cited by 537
Management of risks, uncertainties and opportunities on projects: time for a fundamental shift
Jaafari, A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00047-2 · Cited by 466
Using fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, I., Birgonul, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 374
INSTITUTION OF CIVIL ENGINEERS
BRODIE, R. (2014) · The Reminiscences of a Civil Engineering Contractor · doi:10.1016/b978-1-4831-6762-6.50015-0 · Cited by 364
Project risk management in the Queensland engineering construction industry: a survey
Lyons, T., & Skitmore, M. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00005-x · Cited by 340
Carr, V, & Tah, J. H. M. (2001) · Advances in Engineering Software · doi:10.1016/s0965-9978(01)00036-9 · Cited by 322
On consistency measures of linguistic preference relations
Dong, Y., Xu, Y., & Li, H. (2008) · European Journal of Operational Research · doi:10.1016/j.ejor.2007.06.013 · Cited by 274
Risk and its management in the Kuwaiti construction industry: a contractors’ perspective
Kartam, N. A., & Kartam, S. A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00014-4 · Cited by 249
Risk Analysis and Its Applications
Carter, H. (1984) · Journal of the Operational Research Society · doi:10.1057/jors.1984.90 · Cited by 219
Project risk analysis and management—PRAM the generic process
Chapman, C. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00079-8 · Cited by 205
Zhang, G., & Zou, P. X. W. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:10(771 · Cited by 172
Risk and risk management in construction: a review and future directions for research
Edwards, P. J., & Bowen, P. A. (1998) · Engineering Construction and Architectural Management · doi:10.1046/j.1365-232x.1998.54072.x · Cited by 160
A fuzzy group decision making approach for bridge risk assessment
Wang, Y., & Elhag, T. (2007) · Computers & Industrial Engineering · doi:10.1016/j.cie.2007.04.009 · Cited by 159
Contractor project risks contingency allocation using linguistic approximation
Tah, J. H. M., Thorpe, A., & McCaffer, R. (1993) · Computing Systems in Engineering · doi:10.1016/0956-0521(93)90052-x · Cited by 119
A risk assessment methodology for incorporating uncertainties using fuzzy concepts
Cho, H.-N., Choi, H., & Kim, Y.-B. (2002) · Reliability Engineering & System Safety · doi:10.1016/s0951-8320(02)00158-8 · Cited by 111
Risk interdependencies and natural language computations
Wirba, E. N., Tah, J. H. M., & Howes, R. (1996) · Engineering Construction & Architectural Management · doi:10.1108/eb021034 · Cited by 73
Cervone, H. F. (2006) · OCLC Systems & Services · doi:10.1108/10650750610706970 · Cited by 62
Risk analysis and its applications
Rivett, P. (1984) · European Journal of Operational Research · doi:10.1016/0377-2217(84)90118-8 · Cited by 53
Cited by
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Chen, S., Liu, J., Zhang, Q., Teng, F., & McLellan, B. C. (2022) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2022.112537 · Cited by 691
Ilbahar, E., Karaşan, A., Cebi, S., & Kahraman, C. (2018) · Safety Science · doi:10.1016/j.ssci.2017.10.025 · Cited by 573
A review of application of multi-criteria decision making methods in construction
Jato-Espino, D., Castillo-Lopez, E., Rodriguez-Hernandez, J., & Canteras-Jordana, J. C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.013 · Cited by 510
Kumar, S., Sahoo, S., Lim, W. M., Kraus, S., & Bamel, U. (2022) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2022.121599 · Cited by 468
Metadata
- Authors
- Nieto-Morote, A., & Ruz-Vila, F.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2011-02
- Volume
- 29
- Issue
- 2
- Pages
- 220-231
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W1971449183
- Cited by
- 464
- References
- 28
- FWCI
- 21.37
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.