Factors affecting contractors’ risk attitudes in construction projects: Case study from China
The DOI matches its Crossref record; 29 of the 29 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society. Series A (General) · doi:10.2307/2344428 · Cited by 35,697
Bürgel, O. (2000) · ZEW Economic Studies · doi:10.1007/978-3-642-57671-3_6 · Cited by 3,570
A domain‐specific risk‐attitude scale: measuring risk perceptions and risk behaviors
Weber, E. U., Blais, A., & Betz, N. E. (2002) · Journal of Behavioral Decision Making · doi:10.1002/bdm.414 · Cited by 2,936
Intrinsic motivation, extrinsic reinforcement, and inequity.
Deci, E. L. (1972) · Journal of Personality and Social Psychology · doi:10.1037/h0032355 · Cited by 888 · cited 1×
“According to Deci (1972), intrinsic motivation comes from rewards inherent to a task or activity itself; the intrinsic motivation of a contractor to fight against project risks could originate from various sources.”
BackgroundUnderstanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859 · cited 8×
“…many external economic environment related factors have been considered as important risks in construction projects in China (Shen et al., 2001; Zou et al., 2007), the external economic environment was ranked fairly low in our survey in terms of its influence on contractors’ risk attitudes.”
BackgroundResultInfluentialSelf-citationRisk analysis and management in construction
Akintoye, A. S., & MacLeod, M. J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00035-x · Cited by 755 · cited 1×
“In step one, a thorough literature examination, typically including Akintoye and Macleod (1997), Kaming et al. (1997), Shen et al. (2001), Fang et al. (2004), Ghosh and Jintannapakanont (2004), Wang and Liu (2004), Zou et al. (2007), and Tang et al. (2007), was carried out in order to develop…”
MethodFactors influencing construction time and cost overruns on high-rise projects in Indonesia
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997) · Construction Management and Economics · doi:10.1080/014461997373132 · Cited by 698 · cited 2×
“The wrong RBDM directly results in cost overrun (Kaming et al., 1997), time delay (Shen, 1997; Kaming et al., 1997), bad quality (Lee et al., 2005), poor safety performance (Tam et al., 2004), or/and poor environmental sustainability performance (Dione et al., 2005) of a construction project.”
BackgroundMethodIdentifying elements of poor construction safety management in China
Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004) · Safety Science · doi:10.1016/j.ssci.2003.09.001 · Cited by 590 · cited 1×
“The wrong RBDM directly results in cost overrun (Kaming et al., 1997), time delay (Shen, 1997; Kaming et al., 1997), bad quality (Lee et al., 2005), poor safety performance (Tam et al., 2004), or/and poor environmental sustainability performance (Dione et al., 2005) of a construction project.”
BackgroundApplication of a fuzzy based decision making methodology to construction project risk assessment
Zeng, J., An, M., & Smith, N. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.006 · Cited by 537 · cited 2×
“During the lifecycle of construction projects, especially in the planning phase, the participants are confronted with enormous RBDM problems, which are usually addressed through identifying, analyzing and responding to potential risks, and ultimately optimizing solutions (Al-Bahar and Crangell, 1990; Raftery, 2003; Ze…”
BackgroundThe skills and career path of an effective project manager
El-Sabaa, S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00034-4 · Cited by 449 · cited 1×
“This echoes with Thevendram and Mawdesley (2004) and Sabaa (2001) who both emphasized the importance of human factors to the project success in their studies.”
BackgroundSystematic Risk Management Approach for Construction Projects
Al‐Bahar, J. F., & Crandall, K. C. (1990) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1990)116:3(533 · Cited by 414 · cited 1×
“…projects, especially in the planning phase, the participants are confronted with enormous RBDM problems, which are usually addressed through identifying, analyzing and responding to potential risks, and ultimately optimizing solutions (Al-Bahar and Crangell, 1990; Raftery, 2003; Zeng et al., 2007).”
BackgroundUnderstanding and Managing Risk Attitude
Hillson, D., & Murray-Webster, R. (2017) · Routledge eBooks · doi:10.4324/9781315235448 · Cited by 321
A theory of waste behaviour in the construction industry
Teo, M. M. M., & Loosemore, M. (2001) · Construction Management and Economics · doi:10.1080/01446190110067037 · Cited by 310 · cited 1×
“According to Teo and Loosemore (2001), the attitude is based on individual’s positive or negative evaluation on consequences of a particular type of behavior, as well as personal beliefs or knowledge about the consequences.”
BackgroundRESPONSE MODE, FRAMING, AND INFORMATION-PROCESSING EFFECTS IN RISK ASSESSMENT
Slovic, P., Fischhoff, B., & Lichtenstein, S. (1988) · Decision Making · doi:10.1017/cbo9780511598951.010 · Cited by 252 · cited 6×
“According to an empirical study conducted by Haimlevy Slovic and Fishhoff (1982), decision makers’ risk avoiding tendency would decrease along with the increase of company’s economic strength F24 External economic environment Good external economic environment can contribute to active actions of…”
BackgroundMethodInfluentialGhosh, S., & Jintanapakanont, J. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.004 · Cited by 242 · cited 1×
“…a thorough literature examination, typically including Akintoye and Macleod (1997), Kaming et al. (1997), Shen et al. (2001), Fang et al. (2004), Ghosh and Jintannapakanont (2004), Wang and Liu (2004), Zou et al. (2007), and Tang et al. (2007), was carried out in order to develop in-depth…”
BackgroundRISK MANAGEMENT IN CONSTRUCTION PROJECTS
IQBAL, S., CHOUDHRY, R. M., HOLSCHEMACHER, K., ALI, A., & TAMOŠAITIENĖ, J. (2015) · Technological and Economic Development of Economy · doi:10.3846/20294913.2014.994582 · Cited by 236
Critical Success Factors for Competitiveness of Contractors: China Study
Lu, W., Shen, L., & Yam, M. C. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:12(972 · Cited by 205 · cited 2×
“This method has been widely adopted by previous studies for deriving critical success factors in different contexts (e.g. Li et al., 2005; Lu et al., 2008) and it could also facilitate reaching a broader group of respondents (Ng et al., 2009).”
BackgroundMethodRisk Management in the Chinese Construction Industry
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., & Lu, Y. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:12(944 · Cited by 198 · cited 4×
“According to Teo and Loosemore (2001), the attitude is based on individual’s positive or negative evaluation on consequences of a particular type of behavior, as well as personal beliefs or knowledge about the consequences.”
BackgroundInfluentialAttitudes and perceptions of construction workforce on construction waste in Sri Lanka
Kulatunga, U., Amaratunga, D., Haigh, R., & Rameezdeen, R. (2006) · Management of Environmental Quality: An International Journal · doi:10.1108/14777830610639440 · Cited by 182 · cited 1×
“Udayangani et al. (2006) stated that Likert scales are proper and widely used in attitudinal measurement.”
BackgroundRisk management in the conceptual phase of a project
Uher, T. E., & Toakley, A. R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00024-6 · Cited by 175 · cited 2×
“It is also the very phase at which the greatest degree of uncertainty about the future is encountered (Uher and Toakley, 1999), since the nature of complexity, dynamics and uncertainty of construction projects prevents projects from being implemented in real world the same as they were planned in the feasibility studi…”
BackgroundProject risk management in Hong Kong
Shen, L. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00045-2 · Cited by 160 · cited 2×
“The wrong RBDM directly results in cost overrun (Kaming et al., 1997), time delay (Shen, 1997; Kaming et al., 1997), bad quality (Lee et al., 2005), poor safety performance (Tam et al., 2004), or/and poor environmental sustainability performance (Dione et al., 2005) of a construction project.”
BackgroundRisks in Chinese Construction Market—Contractors’ Perspective
Fang, D., Li, M., Fong, P. S. W., & Shen, L. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:6(853 · Cited by 134 · cited 5×
“Consequences resulted from wrong RBDM have been widely examined by previous studies (Fang et al., 2004; Zou et al., 2007).”
BackgroundMethodResultInfluentialContractor’s Risk Attitudes in the Selection of International Construction Projects
Han, S. H., Diekmann, J. E., & Ock, J. H. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:3(283 · Cited by 125 · cited 2×
“In addition, Han et al. (2005) investigated the risk attitude and decision behavior in international bidding projects based on series of experi- ments, trying to forecast risk attitudes under realistic decision making situations.”
BackgroundFactors contributing to the success of equipment-intensive subcontractors in construction
Ng, S. T., Tang, Z., & Palaneeswaran, E. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.09.006 · Cited by 87 · cited 2×
“, 2008) and it could also facilitate reaching a broader group of respondents (Ng et al., 2009).”
BackgroundMethodManagerial attitudes to risk: a comparison of Scottish chartered accountants and U.K. managers
Helliar, C. V., Lonie, A. A., Power, D., & Sinclair, C. D. (2002) · Journal of International Accounting Auditing and Taxation · doi:10.1016/s1061-9518(02)00068-x · Cited by 66 · cited 1×
“To consider whether the risk-taking attitudes of Scottish chartered accountants are similar to or different from managers of other businesses in the UK, Helliar et al. (2002) conducted a large survey to examine their attitudes to risk.”
BackgroundSubjective Risk Assessment and Perception in the Greek and English Bakery Industries
Alexopoulos, E. C., Kavadi, Z., Bakoyannis, G., & Papantonopoulos, S. A. (2009) · Journal of Environmental and Public Health · doi:10.1155/2009/891754 · Cited by 55 · cited 2×
“Furthermore, Alexopoulos et al. (2009) stated that decision makers perceive risks differently in various situations, which is affected by factors such as early experience, education background, personal beliefs, and culture.”
BackgroundRisk attributes theory: Decision making under risk
He, Y., & Huang, R. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2007.01.012 · Cited by 34 · cited 1×
“Risk-based decision making (RBDM) is in the core of construction risk management (Sturk et al., 1996; He and Huang, 2007).”
BackgroundThatch, D. W. (1975) · Journal of Quality Technology · doi:10.1080/00224065.1975.11980700 · Cited by 32 · cited 1×
“A detailed description of these methods is shown in Table 1 (Cai, 1992; Xu, 1998; Liu and Gao, 1993).”
MethodUtility Functions for Infinite-Period Planning
Harvey, C. M. (1988) · Management Science · doi:10.1287/mnsc.34.5.645 · Cited by 12 · cited 1×
“Harvey (1988) developed a decision model for analyzing the attitude toward risk, based on which he studied the effect of risk attitude on public policy appraisal decision making across different time spans.”
Background
Cited by
Construction and demolition waste management in China through the 3R principle
Huang, B., Wang, X., Kua, H., Geng, Y., Bleischwitz, R., & Ren, J. (2018) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.09.029 · Cited by 1,047
Risk Assessment Using a New Consulting Process in Fuzzy AHP
Lyu, H.-M., Sun, W.-J., Shen, S.-L., & Zhou, A.-N. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001757 · Cited by 279
Xia, N., Zou, P. X. W., Griffin, M. A., Wang, X., & Zhong, R. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.03.006 · Cited by 229
“Specifically, risk-based decisions such as the decision on the concession period between the public and private sector in a PPP arrangement can vary (Xu and Moon, 2014) can vary among stakeholders (e.g., Shealy et al., 2016; Van Os et al., 2015; Wang and Yuan, 2011; J. Wang et al., 2016).”
Background
Metadata
- Authors
- Wang, J., & Yuan, H.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2011-02
- Volume
- 29
- Issue
- 2
- Pages
- 209-219
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2005961314
- Cited by
- 216
- References
- 29
- FWCI
- 9.59
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.