An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index
The DOI matches its Crossref record; 9 of the 9 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Williams, T. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.856572 · Cited by 456
Earned value in project management
(2003) · Work Study · doi:10.1108/ws.2003.07952gaf.006 · Cited by 418
Earned Value Project Management Method and Extensions
Anbari, F. T. (2003) · Project Management Journal · doi:10.1177/875697280303400403 · Cited by 392 · cited 1×
“Recently, Morin (2009) has described the origins of this methodology, whose costs and benefits were described in Christensen (1998).1 A detailed explanation of EVM basis can be found in Anbari (2003), Fleming and Koppelman (2005) and PMI (2005).”
BackgroundA comparison of different project duration forecasting methods using earned value metrics
Vandevoorde, S., & Vanhoucke, M. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.10.004 · Cited by 343 · cited 1×
“…proposed extensions to the basic procedures, mainly related to forecasting improvement: Zwikael et al. (2000) evaluate five forecasting methods; Vandevoorde and Vanhoucke (2006, 2007) summarise some of the cost and schedule forecasting methods and study their accuracy in real and simulated…”
MethodLipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.02.009 · Cited by 292 · cited 2×
“More recently, Lipke et al. (2009) have reviewed the main concepts.”
BackgroundMethodWilliams, T. (2002) · Cited by 244
A simulation and evaluation of earned value metrics to forecast the project duration
Vanhoucke, M., & Vandevoorde, S. (2006) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2602296 · Cited by 176
Criticality in Stochastic Networks
Williams, T. (1992) · Journal of the Operational Research Society · doi:10.1057/jors.1992.50 · Cited by 103
A Multi-Dimensional Analysis of Major Risks in Complex Projects
Cagno, E., Caron, F., & Mancini, M. (2007) · Risk Management · doi:10.1057/palgrave.rm.8250014 · Cited by 101 · cited 1×
“2 See Cagno et al. (2007) for a detailed analysis and classification of risks.”
Background
Cited by
A new approach for project control under uncertainty. Going back to the basics
Acebes, F., Pajares, J., Galán, J. M., & López-Paredes, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.003 · Cited by 165
“In order to answer the former question, Pajares and López-Paredes (2011) suggested to split the final project buffer into small buffers for every time interval, being the interval buffers proportional to the risk reduced at the particular time interval.”
BackgroundSelf-citationKhodakarami, V., & Abdi, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.01.001 · Cited by 164
Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques
Acebes, F., Pereda, M., Poza, D., Pajares, J., & Galán, J. M. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.06.012 · Cited by 120
Self-citationOng, H. Y., Wang, C., & Zainon, N. (2016) · Engineering Management Journal · doi:10.1080/10429247.2015.1135033 · Cited by 22
Análisis cuantitativo de riesgos utilizando "MCSimulRisk" como herramienta didáctica
Acebes Senovilla, F., Curto Lorenzo, D., De Antón Heredero, J., & Villafáñez Cardeñoso, F. (2024) · Dirección y Organización · doi:10.37610/dyo.v0i82.662 · Cited by 5
“La obtención de estas curvas son el paso previo para conseguir los indicadores SCoI/CCoI que proponen Pajares & López-Paredes (2011) y que se utilizan para conocer el estado del proyecto en el instante de control, conforme a la incertidumbre aportada por los riesgos identificados del proyecto…”
BackgroundInfluential
Metadata
- Authors
- Pajares, J., & López-Paredes, A.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2011-07
- Volume
- 29
- Issue
- 5
- Pages
- 615-621
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2054692573
- Cited by
- 162
- References
- 9
- FWCI
- 9.16
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.