The effects of project uncertainty and risk management on IS development project performance: A vendor perspective
The DOI matches its Crossref record; 31 of the 31 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Structural equation modeling in practice: A review and recommended two-step approach
Anderson, J. C., & Gerbing, D. W. (1988) · Psychological Bulletin · doi:10.1037/0033-2909.103.3.411 · Cited by 41,941
On the Evaluation of Structural Equation Models
Bagozzi, R. P., & Yi, Y. (1988) · Journal of the Academy of Marketing Science · doi:10.1007/bf02723327 · Cited by 26,163
Chin, W. W., Marcolin, B. L., & Newsted, P. R. (2003) · Information Systems Research · doi:10.1287/isre.14.2.189.16018 · Cited by 6,479 · cited 6×
“Although the overall interaction effect size ( f 2 ) is comparatively small, Chin et al. (2003) emphasized that a small f 2 does not necessary imply an unimportant effect.”
BackgroundMethodInfluentialIndex Construction with Formative Indicators: An Alternative to Scale Development
Diamantopoulos, A., & Winklhofer, H. M. (2001) · Journal of Marketing Research · doi:10.1509/jmkr.38.2.269.18845 · Cited by 3,748 · cited 1×
“To ensure the validity of the formative measurement model, we adopted the analytic procedure recommended by Diamantopoulos and Winklhofer (2001) to test the formative measurement model from content specification, indicator specification, indicator collinearity and external validity.”
MethodTwo Structural Equation Models: LISREL and PLS Applied to Consumer Exit-Voice Theory
Fornell, C., & Bookstein, F. L. (1982) · Journal of Marketing Research · doi:10.2307/3151718 · Cited by 3,364
Organization design: an information processing view
Galbraith, J. R. (1974) · Interfaces · doi:10.1287/inte.4.3.28 · Cited by 2,451 · cited 2×
“Organizational designs thus must provide information processing capabilities that are appropriate to the level of uncertainty confronting each organization unit (Galbraith, 1974).”
BackgroundUser Involvement and MIS Success: A Review of Research
Ives, B., & Olson, M. H. (1984) · Management Science · doi:10.1287/mnsc.30.5.586 · Cited by 1,318 · cited 1×
“It is a common wisdom in the IS literature that user participation can improve the chances of successful system implementation, which can be traced to the theory of “ participative decision-making (PDM) ” and “ planned organizational change (POC) ” (Ives and Olson, 1984).”
BackgroundIdentifying Software Project Risks: An International Delphi Study
Schmidt, R., Lyytinen, K., Keil, M., & Cule, P. (2001) · Journal of Management Information Systems · doi:10.1080/07421222.2001.11045662 · Cited by 1,252 · cited 1×
“Researchers have identified various risk or uncertainty factors that can threaten the successful completion of a software development project (Alter and Ginzberg, 1978; Barki et al., 1993; Schmidt et al., 2001; Lihong et al., 2008; Nakatsu and Iacovou, 2009).”
BackgroundAn Empirical Investigation of Information Technology Sourcing Practices: Lessons from Experience1
Lacity, M. C., & Willcocks, L. P. (1998) · MIS Quarterly · doi:10.2307/249670 · Cited by 1,005 · cited 2×
“However, companies are increasingly outsourcing all or part of their IS activities to external vendors (Lacity and Willcocks, 1998), including IS development.”
BackgroundPortfolio approach to information systems
McFarlan, F. W. (1989) · IEEE Press eBooks · Cited by 771
Toward an Assessment of Software Development Risk
Barki, H., Rivard, S., & Talbot, J. (1993) · Journal of Management Information Systems · doi:10.1080/07421222.1993.11518006 · Cited by 717 · cited 3×
“Technical complexity Barki et al. (1993) 2004) ppc1: special attention is paid to project planning ppc2: project milestones are clearly defined ppc3: project progress is monitored closely using PERT or CPM tools ppc4: periodic formal status reports versus plan ppc5: strictly audit at milestone…”
BackgroundNidumolu, S. (1995) · Information Systems Research · doi:10.1287/isre.6.3.191 · Cited by 555 · cited 8×
“One branch of IS research discusses risk management, project success, and the relationships between the two from a contingency perspective (e.g., Nidumolu, 1995; Barki et al., 2001; Jiang et al., 2006).”
BackgroundResultInfluentialWallace, L., Keil, M., & Rai, A. (2004) · Decision Sciences · doi:10.1111/j.00117315.2004.02059.x · Cited by 487 · cited 6×
“The empirical results of Wallace et al. (2004) confirm the negative relationship between planning & control risk and project performance.”
BackgroundMethodResultInfluentialAn Integrative Contingency Model of Software Project Risk Management
Barki, H., Rivard, S., & Talbot, J. (2001) · Journal of Management Information Systems · doi:10.1080/07421222.2001.11045666 · Cited by 410 · cited 14×
“The research of Barki et al. (2001) represents a significant advance in that it adopts the contingency approach to software project risk management from an integrated perspective.”
BackgroundMethodResultInfluentialDoes risk management contribute to IT project success? A meta-analysis of empirical evidence
de Bakker, K., Boonstra, A., & Wortmann, H. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.07.002 · Cited by 332 · cited 1×
“Instead, it is seen as embedded in the various processes and procedures of the project (Bakker et al., 2010).”
BackgroundManagement of Large Software Development Efforts
Zmud, R. W. (1980) · MIS Quarterly · doi:10.2307/249336 · Cited by 271 · cited 3×
“Project planning and control has often been cited as a low information processing capability approach to project management (Alter and Ginzberg, 1978; Zmud, 1980) and, to a certain extent, as reducing the amount of information to be processed (Nidumolu, 1995).”
BackgroundThe Process and Product of System Design
Boland, R. J. (1978) · Management Science · doi:10.1287/mnsc.24.9.887 · Cited by 254 · cited 1×
“Some studies have provided data to support the positive relationship between user participation and systems quality (Boland, 1978; Gallagher, 1974; Nidumolu, 1995).”
BackgroundNakatsu, R. T., & Iacovou, C. L. (2009) · Information & Management · doi:10.1016/j.im.2008.11.005 · Cited by 254 · cited 1×
“Researchers have identified various risk or uncertainty factors that can threaten the successful completion of a software development project (Alter and Ginzberg, 1978; Barki et al., 1993; Schmidt et al., 2001; Lihong et al., 2008; Nakatsu and Iacovou, 2009).”
BackgroundPerceptions of the Value of a Management Information System.
Gallagher, C. A. (1974) · Academy of Management Journal · doi:10.2307/254770 · Cited by 249
The impact of size and volatility on IT project performance
Sauer, C., Gemino, A., & Reich, B. H. (2007) · Communications of the ACM · doi:10.1145/1297797.1297801 · Cited by 246 · cited 3×
“…1987), user participation (McKeen and Guimaraes, 1997), coordination mechanisms (Nidumolu, 1995, 1996a), and user partnering (Jiang et al., 2006), or to specific drivers of uncertainty, such as project size and process volatility (Sauer et al., 2007), and user non-support risk (Jiang et al., 2006).”
BackgroundAn Integrated Performance Model Information Systems Projects
(2002) · Journal of Management Information Systems · doi:10.1080/07421222.2002.11045709 · Cited by 221 · cited 3×
“3 Rai and Hindi (2000), Aladwani (2002) and Wallace et al.”
BackgroundResultInfluentialSuccessful Strategies for User Participation in Systems Development
Mckeen, J. D., & Guimaraes, T. (1997) · Journal of Management Information Systems · doi:10.1080/07421222.1997.11518168 · Cited by 183 · cited 2×
“McKeen and Guimaraes (1997) User participation Use low levels of user participation when project uncertainty is low, whereas enhance user participation.”
BackgroundNidumolu, S. R. (1996) · Journal of Management Information Systems · doi:10.1080/07421222.1996.11518124 · Cited by 183 · cited 5×
“Case study Nidumolu (1995, 1996a) Coordination structure Use vertical coordination for high project uncertainty.”
BackgroundResultInfluentialSoftware Processes and Project Performance
Deephouse, C., Mukhopadhyay, T., Goldenson, D. R., & Kellner, M. I. (1995) · Journal of Management Information Systems · doi:10.1080/07421222.1995.11518097 · Cited by 179
Sabherwal, R. (2003) · Information and Organization · doi:10.1016/s1471-7727(02)00026-x · Cited by 165 · cited 2×
“The results of a number of studies suggest that the two sides may have different perceptions of risk, management mechanisms and project success, because of their different goals (Sabherwal, 2003; Taylor, 2007).”
BackgroundA General, But Readily Adaptable Model of Information System Risk
Alter, S., & Sherer, S. A. (2004) · Communications of the Association for Information Systems · doi:10.17705/1cais.01401 · Cited by 154 · cited 2×
“Distinguishing between risks that exist prior to a phase and those that emerge during a phase is important for risk management, because factors that exist prior to a particular project or operational phase may need to be managed differently than those that emerge during that phase (Alter and Sherer, 2004).”
BackgroundA model of information systems development project performance
Yetton, P., Martin, A., Sharma, R., & Johnston, K. D. (2000) · Information Systems Journal · doi:10.1046/j.1365-2575.2000.00088.x · Cited by 147 · cited 4×
“Previous research has demonstrated a positive relationship between planning and process performance (Deephouse et al., 1996; Yetton et al., 2000).”
BackgroundResultInfluentialThe Effects of User Partnering and User Non-Support on Project Performance
Jiang, J. J., Klein, G. L., & Chen, H.-G. (2006) · Journal of the Association for Information Systems · doi:10.17705/1jais.00082 · Cited by 120 · cited 4×
“One branch of IS research discusses risk management, project success, and the relationships between the two from a contingency perspective (e.g., Nidumolu, 1995; Barki et al., 2001; Jiang et al., 2006).”
BackgroundInfluentialThe effects of development process modeling and task uncertainty on development quality performance
Rai, A., & Al-Hindi, H. A. (2000) · Information & Management · doi:10.1016/s0378-7206(00)00047-1 · Cited by 104 · cited 2×
“Of the 600 questionnaires administered, 181 usable responses from 93 respondents were obtained from the survey, a response rate of approximately 30.2%, which compares well with most other IS surveys (e.g., Rai and Hindi, 2000; Aladwani, 2002; Wallace et al., 2004).”
MethodResultInfluentialUser participation in software development projects
Subramanyam, R., Weisstein, F. L., & Krishnan, M. S. (2010) · Communications of the ACM · doi:10.1145/1666420.1666455 · Cited by 90 · cited 1×
“Empirical evidence provided by Subramanyam et al. (2010) supports the argument that potential conflicts arising from greater user participation may play a vital role in the perceived satisfaction of software developers and users.”
BackgroundPrediction of IS Project Escalation Based on Software Development Risk Management
Kim, E. H., & Park, Y. (2007) · Journal of Information & Knowledge Management · doi:10.1142/s0219649207001688 · Cited by 3 · cited 1×
“Based on prior research (McFarlan, 1981; Barki et al., 2001; Kim and Park, 2007), we focus on three key constructs reflecting software project risk management practice: project planning and control, internal integration and user participation.”
Method
Cited by
Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., & Arawomo, O. O. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.01.022 · Cited by 260
Factors associated with the software development agility of successful projects
Sheffield, J., & Lemétayer, J. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.09.011 · Cited by 222
Savolainen, P., Ahonen, J. J., & Richardson, I. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.07.002 · Cited by 168
“Only recently have studies appeared which note that the customer and the supplier may have different perceptions of risk, risk management, and project success (Jun et al., 2010; Taylor, 2007).”
Kassem, M. A. (2022) · Gases · doi:10.3390/gases2020003 · Cited by 36
Tukamuhabwa, B. R., Mutebi, H., Akandwanaho, E., Kabagambe, L., & Tumukunde, I. (2023) · Cogent Business & Management · doi:10.1080/23311975.2023.2263994 · Cited by 8
“…which governance mechanisms influence project performance, which had been identified in the project management literature (Haq et al., 2019) as well as the controversial debate on the contribution of risk management (Bakker et al., 2010; Carson et al., 2006; Guo et al., 2014; Jun et al., 2011).”
Background
Metadata
- Authors
- Jun, L., Qiuzhen, W., & Qingguo, M.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2011-10
- Volume
- 29
- Issue
- 7
- Pages
- 923-933
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2030341195
- Cited by
- 184
- References
- 31
- FWCI
- 26.20
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.