Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects
The DOI matches its Crossref record; 39 of the 39 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Analytic Hierarchy Process
SAATY, T. L., & KEARNS, K. P. (1985) · Analytical Planning · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,357
A scaling method for priorities in hierarchical structures
Saaty, T. L. (1977) · Journal of Mathematical Psychology · doi:10.1016/0022-2496(77)90033-5 · Cited by 10,360 · cited 1×
“The ratio of preference intensity with a scale from 1 to 9 suggested by Saaty (1980) is employed in this study to measure the relative impacts of risk factors on construction project performance.”
MethodMultiple Attribute Decision Making: Methods and Applications
Chen, S.-J. J., Hwang, C. L., Beckmann, M. J., & Krelle, W. E. (1981) · Medical Entomology and Zoology · Cited by 8,207
Buckley, J. J. (1985) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(85)90090-9 · Cited by 3,360
Multiple Attribute Decision Making: Methods and Applications
Tzeng, G., & Huang, J. (2011) · Cited by 2,233
Ranking fuzzy numbers with integral value
Liou, T., & Wang, M. J. (1992) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(92)90223-q · Cited by 1,275
Application of the AHP in project management
Al-Harbi, K. M. A.-S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,125 · cited 1×
“The analytic hierarchy process (AHP) was developed (Saaty, 1977, 1980) to solve decision making problems and has been employed in the construction industry for many decision making problems (Al-Harbi, 2001; Cheung et al., 2002; Fong and Choi, 2000; Mahdi et al., 2002).”
MethodSome issues on consistency of fuzzy preference relations
Herrera-Viedma, E., Herrera, F., Chiclana, F., & Luque, M. (2004) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00725-7 · Cited by 1,000 · cited 3×
“(6) and (7), is one of the suggested properties to explore the consistent reciprocal fuzzy preference relation P=[pij] (Herrera-Viedma et al., 2004).”
BackgroundMethodInfluentialUnderstanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859
Why triangular membership functions?
Pedrycz, W. (1994) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(94)90003-5 · Cited by 782
Fuzzy MCDM approach for planning and design tenders selection in public office buildings
Hsieh, T.-Y., Lu, S.-T., & Tzeng, G.-H. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.01.002 · Cited by 694 · cited 1×
“The mathematical computation of two fuzzy numbers has been described in greater detail elsewhere (Hsieh et al., 2004):”
MethodSelf-citationModelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 587
Application of a fuzzy based decision making methodology to construction project risk assessment
Zeng, J., An, M., & Smith, N. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.006 · Cited by 537 · cited 1×
“Some of these studies have also applied AHP to risk assessments (Dikmen and Birgonul, 2006; Lu, 2010; Lu et al., 2007; Sadiq et al., 2007; Zayed et al., 2008; Zeng et al., 2007).”
BackgroundRisk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468 · cited 1×
“Political El-Sayegh (2008) 7.”
A fuzzy approach to construction project risk assessment
Nieto-Morote, A., & Ruz-Vila, F. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.002 · Cited by 464
Using fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, I., Birgonul, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 374 · cited 1×
“Design risk Dikmen et al. (2007) 6.”
Chapman, R. J. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00070-8 · Cited by 352 · cited 1×
“Three approaches have frequently been applied in construction project risk assessment: probability analysis (Adams, 2008; Elkjaer, 2000; Titarenko and Robust, 1997; Ye and Tiong, 2000), interval analysis (Baccarini and Archer, 2001; Chapman, 2001; Mak, and Picken, 2000), and fuzzy set analysis (Lu et al.”
MethodEvaluating weapon system using fuzzy analytic hierarchy process based on entropy weight
Mon, D.-L., Cheng, C.-H., & Lin, J.-C. (1994) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(94)90052-3 · Cited by 343
Final contractor selection using the analytical hierarchy process
Fong, P. S. W., & Choi, S. K.-Y. (2000) · Construction Management and Economics · doi:10.1080/014461900407356 · Cited by 335 · cited 1×
“The analytic hierarchy process (AHP) was developed (Saaty, 1977, 1980) to solve decision making problems and has been employed in the construction industry for many decision making problems (Al-Harbi, 2001; Cheung et al., 2002; Fong and Choi, 2000; Mahdi et al., 2002).”
MethodAssessing risk and uncertainty inherent in Chinese highway projects using AHP
Zayed, T., Amer, M., & Pan, J. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.05.012 · Cited by 322 · cited 1×
“Some of these studies have also applied AHP to risk assessments (Dikmen and Birgonul, 2006; Lu, 2010; Lu et al., 2007; Sadiq et al., 2007; Zayed et al., 2008; Zeng et al., 2007).”
BackgroundModelling risk allocation decision in construction contracts
Lam, K. C., Wang, D., Lee, P. T. K., & Tsang, Y. T. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.005 · Cited by 248 · cited 1×
“method was derived from Liou and Wang (1992) and has been applied in the studies of Chang et al.”
MethodGhosh, S., & Jintanapakanont, J. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.004 · Cited by 242 · cited 1×
“Political and social Ghosh and Jintanapakanont (2004) 6.”
BackgroundThe risk ranking of projects: a methodology
Baccarini, D., & ARCHER, R. L. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00074-5 · Cited by 239 · cited 1×
“Three approaches have frequently been applied in construction project risk assessment: probability analysis (Adams, 2008; Elkjaer, 2000; Titarenko and Robust, 1997; Ye and Tiong, 2000), interval analysis (Baccarini and Archer, 2001; Chapman, 2001; Mak, and Picken, 2000), and fuzzy set analysis (Lu et al.”
MethodChang, T.-H., & Wang, T.-C. (2009) · Information Sciences · doi:10.1016/j.ins.2008.10.012 · Cited by 206 · cited 1×
“Note: The scales of TFNs are used in Chang and Wang (2009), and Zhang and Lu (2003).”
MethodKnowledge-Based Approach to Construction Project Risk Management
Tah, J. H. M., & Carr, V. (2001) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2001)15:3(170 · Cited by 166 · cited 1×
“Three approaches have frequently been applied in construction project risk assessment: probability analysis (Adams, 2008; Elkjaer, 2000; Titarenko and Robust, 1997; Ye and Tiong, 2000), interval analysis (Baccarini and Archer, 2001; Chapman, 2001; Mak, and Picken, 2000), and fuzzy set analysis (Lu et al., 2001; Rebias…”
MethodUsing Risk Analysis to Determine Construction Project Contingencies
Mak, S., & Picken, D. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:2(130 · Cited by 165
Applying fuzzy hierarchy multiple attributes to construct an expert decision making process
Chang, C., Wu, C., & Lin, H. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.09.026 · Cited by 149 · cited 1×
“method was derived from Liou and Wang (1992) and has been applied in the studies of Chang et al. (2009) and Wu et al.”
MethodZhang, H. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.004 · Cited by 140 · cited 1×
“Risk assessment further computes project risk by evaluating the potential impact on project performance and possibility of occurrence of these potential risk factors (Zhang, 2007).”
BackgroundZhang, G., & Lü, J. (2003) · Group Decision and Negotiation · doi:10.1023/b:grup.0000004197.04668.cf · Cited by 132
Dikmen, İ., & Birgönül, M. T. (2006) · Canadian Journal of Civil Engineering · doi:10.1139/l05-087 · Cited by 108 · cited 1×
“Some of these studies have also applied AHP to risk assessments (Dikmen and Birgonul, 2006; Lu, 2010; Lu et al., 2007; Sadiq et al., 2007; Zayed et al., 2008; Zeng et al., 2007).”
BackgroundSadiq, R., Kleiner, Y., & Rajani, B. B. (2007) · Risk Analysis · doi:10.1111/j.1539-6924.2007.00972.x · Cited by 108
Judgmental risk analysis process development in construction projects
Öztaş, A., & Ökmen, Ö. (2004) · Building and Environment · doi:10.1016/j.buildenv.2004.10.013 · Cited by 93 · cited 1×
“Pedrycz (1994) verified that linear triangle membership functions are good enough to capture the vagueness of these linguistic assessments with a fuzzy modeling mechanism.”
BackgroundInformation modelling for a construction project risk management system
Tah, J. H. M., & Carr, V. (2000) · Engineering Construction & Architectural Management · doi:10.1046/j.1365-232x.2000.00126.x · Cited by 80
Adams, F. K. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.05.007 · Cited by 77 · cited 1×
“Three approaches have frequently been applied in construction project risk assessment: probability analysis (Adams, 2008; Elkjaer, 2000; Titarenko and Robust, 1997; Ye and Tiong, 2000), interval analysis (Baccarini and Archer, 2001; Chapman, 2001; Mak, and Picken, 2000), and fuzzy set analysis (Lu et al.”
MethodFuzziness and randomness in investment project risk appraisal
Rębiasz, B. (2005) · Computers & Operations Research · doi:10.1016/j.cor.2005.05.006 · Cited by 57 · cited 1×
“Three approaches have frequently been applied in construction project risk assessment: probability analysis (Adams, 2008; Elkjaer, 2000; Titarenko and Robust, 1997; Ye and Tiong, 2000), interval analysis (Baccarini and Archer, 2001; Chapman, 2001; Mak, and Picken, 2000), and fuzzy set analysis (Lu et al., 2001; Rebias…”
MethodElkjaer, M. (2000) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00078-7 · Cited by 53 · cited 1×
“Three approaches have frequently been applied in construction project risk assessment: probability analysis (Adams, 2008; Elkjaer, 2000; Titarenko and Robust, 1997; Ye and Tiong, 2000), interval analysis (Baccarini and Archer, 2001; Chapman, 2001; Mak, and Picken, 2000), and fuzzy set analysis (Lu et al.”
MethodA Fuzzy ANP-based Approach to Evaluate Medical Organizational Performance
Wu, C., Chang, C., & Lin, H. (2008) · Cited by 47
Application of Analytic Network Process (ANP) in Assessing Construction Risk of Urban Bridge Project
Lu, S.-T., Lin, C.-W., & Ko, P.-H. (2007) · doi:10.1109/icicic.2007.172 · Cited by 23 · cited 1×
“Some of these studies have also applied AHP to risk assessments (Dikmen and Birgonul, 2006; Lu, 2010; Lu et al., 2007; Sadiq et al., 2007; Zayed et al., 2008; Zeng et al., 2007).”
BackgroundSelf-citationLu, S.-T. (2010) · International Conference on Machine Learning and Cybernetics · doi:10.1109/icmlc.2010.5580509 · Cited by 4 · cited 2×
“Some of these studies have also applied AHP to risk assessments (Dikmen and Birgonul, 2006; Lu, 2010; Lu et al., 2007; Sadiq et al., 2007; Zayed et al., 2008; Zeng et al., 2007).”
BackgroundSelf-citation
Cited by
Risk Assessment Using a New Consulting Process in Fuzzy AHP
Lyu, H.-M., Sun, W.-J., Shen, S.-L., & Zhou, A.-N. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001757 · Cited by 279
Risk paths in international construction projects: Case study from Chinese contractors
Liu, J., Zhao, X., & Yan, P. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001116 · Cited by 203
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Islam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163
Metadata
- Authors
- Kuo, Y.-C., & Lu, S.-T.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2013-05
- Volume
- 31
- Issue
- 4
- Pages
- 602-614
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2018706939
- Cited by
- 199
- References
- 39
- FWCI
- 11.54
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.