Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Bayesian Networks and Decision Graphs
Jensen, F. V., & Nielsen, T. D. (2007) · Information Science and Statistics · doi:10.1007/978-0-387-68282-2 · Cited by 4,129
Risk assessment and risk management: Review of recent advances on their foundation
Aven, T. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.12.023 · Cited by 1,713
Sadler, G. R., Lee, H.-C., Lim, R. S.-H., & Fullerton, J. (2010) · Nursing & Health Sciences · doi:10.1111/j.1442-2018.2010.00541.x · Cited by 1,257
The concept of project complexity—a review
Baccarini, D. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00093-3 · Cited by 1,192
The need for new paradigms for complex projects
Williams, T. M. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00047-7 · Cited by 930
Understanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859
Bayesian Networks and Decision Graphs
Ahmed, S. E. (2008) · Technometrics · doi:10.1198/tech.2008.s543 · Cited by 719
Transforming project risk management into project uncertainty management
Ward, S. C., & Chapman, C. B. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00080-1 · Cited by 661
Eight Myths About Causality and Structural Equation Models
Bollen, K. A., & Pearl, J. (2013) · Handbooks of Sociology and Social Research · doi:10.1007/978-94-007-6094-3_15 · Cited by 645
Analytic Hierarchy Process and Expert Choice: Benefits and limitations
Ishizaka, A., & Labib, A. (2009) · OR Insight · doi:10.1057/ori.2009.10 · Cited by 609
Bayesian Networks and Influence Diagrams: A Guide to Construction and Analysis
Kjærulff, U. B., & Madsen, A. L. (2013) · Information Science and Statistics · doi:10.1007/978-1-4614-5104-4 · Cited by 599
Now, let's make it really complex (complicated): A systematic review of the complexities of projects
Geraldi, J., Maylor, H., & Williams, T. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111165848 · Cited by 559
Wallace, L., Keil, M., & Rai, A. (2004) · Decision Sciences · doi:10.1111/j.00117315.2004.02059.x · Cited by 487
Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.07.008 · Cited by 471
A fuzzy approach to construction project risk assessment
Nieto-Morote, A., & Ruz-Vila, F. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.002 · Cited by 464
Williams, T. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.856572 · Cited by 456
Extending the risk process to manage opportunities
Hillson, D. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00074-6 · Cited by 396
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Vidal, L.-A., Marle, F., & Bocquet, J.-C. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.10.016 · Cited by 357
Understanding project complexity: implications on project management
Vidal, L., & Marle, F. (2008) · Kybernetes · doi:10.1108/03684920810884928 · Cited by 355
Impact of risk management on project performance: the importance of soft skills
Carvalho, M. M. D., & Rabechini Junior, R. (2015) · International Journal of Production Research · doi:10.1080/00207543.2014.919423 · Cited by 324
Measuring project complexity using the Analytic Hierarchy Process
Vidal, L.-A., Marle, F., & Bocquet, J.-C. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.07.005 · Cited by 302
A conceptual framework for tackling knowable unknown unknowns in project management
Ramasesh, R. V., & Browning, T. R. (2014) · Journal of Operations Management · doi:10.1016/j.jom.2014.03.003 · Cited by 290
Managing global megaprojects: Complexity and risk management
Kardes, I., Ozturk, A., Cavusgil, S. T., & Cavusgil, E. (2013) · International Business Review · doi:10.1016/j.ibusrev.2013.01.003 · Cited by 278
Davies, A., & Mackenzie, I. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.10.004 · Cited by 277
Project management and its effects on project success: Cross-country and cross-industry comparisons
Carvalho, M. M. D., Patah, L. A., & de Souza Bido, D. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.04.004 · Cited by 243
He, Q., Luo, L., Hu, Y., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.009 · Cited by 243
Managing Risks in Complex Projects
Thamhain, H. (2013) · Project Management Journal · doi:10.1002/pmj.21325 · Cited by 243
And then came Complex Project Management (revised)
Whitty, S. J., & Maylor, H. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.03.004 · Cited by 231
Eybpoosh, M., Dikmen, I., & Talat Birgonul, M. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000382 · Cited by 217
Risk paths in international construction projects: Case study from Chinese contractors
Liu, J., Zhao, X., & Yan, P. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001116 · Cited by 203 · cited 1×
“Using the same approach, Liu et al. (2016) explored risk paths in international construction projects performed by Chinese contractors and evaluated the impact of risks on project objectives.”
BackgroundNetwork theory-based analysis of risk interactions in large engineering projects
Fang, C., Marle, F., Zio, E., & Bocquet, J.-C. (2012) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2012.04.005 · Cited by 193
Analysing the organizational factors of project complexity using structural equation modelling
Qureshi, S. M., & Kang, C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.04.006 · Cited by 189
Giezen, M. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.01.010 · Cited by 188
An Analytical Network Process model for risks prioritisation in megaprojects
Boateng, P., Chen, Z., & Ogunlana, S. O. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.08.007 · Cited by 172
Quantifying the complexity of transportation projects using the fuzzy analytic hierarchy process
Nguyen, A. T., Nguyen, L. D., Le‐Hoai, L., & Dang, C. N. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.007 · Cited by 171
An optimization method for selecting project risk response strategies
Zhang, Y., & Fan, Z. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.06.006 · Cited by 169
Complexity, uncertainty-reduction strategies, and project performance
Floricel, S., Michela, J. L., & Piperca, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.11.007 · Cited by 169
Thomé, A. M. T., Scavarda, L. F., Scavarda, A., & Thomé, F. E. S. D. S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.10.012 · Cited by 162
Padalkar, M., & Gopinath, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.02.009 · Cited by 159
Lu, Y., Luo, L., Wang, H., Le, Y., & Shi, Q. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.12.005 · Cited by 158
On the new ISO guide on risk management terminology
Aven, T. (2011) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2010.12.020 · Cited by 155
Liu, S. (2015) · Journal of Operations Management · doi:10.1016/j.jom.2015.03.003 · Cited by 148
Bayesian belief nets for managing expert judgement and modelling reliability
Sigurdsson, J. H., Walls, L., & Quigley, J. (2001) · Quality and Reliability Engineering International · doi:10.1002/qre.410 · Cited by 145
Self-citationA knowledge-based risk mapping tool for cost estimation of international construction projects
Yildiz, A. E., Dikmen, İ., Birgönül, M. T., Ercoskun, K., & Alten, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.03.010 · Cited by 135
The impacts of product design changes on supply chain risk: a case study
Lin, Y., & Zhou, L. (2011) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600031111118549 · Cited by 133
Ackermann, F., Howick, S., Quigley, J. M., Walls, L., & Houghton, T. (2014) · European Journal of Operational Research · doi:10.1016/j.ejor.2014.03.035 · Cited by 131
Self-citationOntology for Relating Risk and Vulnerability to Cost Overrun in International Projects
Fidan, G., Dikmen, İ., Tanyer, A. M., & Birgönül, M. T. (2011) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000090 · Cited by 127
Kutsch, E., & Hall, M. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.06.009 · Cited by 125
Generating project risk response strategies based on CBR: A case study
Fan, Z., Li, Y.-H., & Zhang, Y. (2014) · Expert Systems with Applications · doi:10.1016/j.eswa.2014.11.034 · Cited by 99
Quantitative modeling and analysis of supply chain risks using Bayesian theory
Badurdeen, F., Shuaib, M. A., Wijekoon, K., Brown, A., Faulkner, W., Amundson, J., Jawahir, I. S., Goldsby, T. J., Iyengar, D., & Boden, B. (2014) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-10-2012-0097 · Cited by 94
On the management of social risks of hydraulic infrastructure projects in China: A case study
Shi, Q., Liu, Y., Zuo, J., Pan, N., & Ma, G. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.06.003 · Cited by 91
Bayesian belief network-based framework for sourcing risk analysis during supplier selection
Nepal, B. P., & Yadav, O. P. (2015) · International Journal of Production Research · doi:10.1080/00207543.2015.1027011 · Cited by 85
Risk Matrix Integrating Risk Attitudes Based on Utility Theory
Ruan, X., Yin, Z., & Frangopol, D. M. (2015) · Risk Analysis · doi:10.1111/risa.12400 · Cited by 83
House of Project Complexity—understanding complexity in large infrastructure projects
Lessard, D. R., Sakhrani, V., & Miller, R. L. (2014) · Engineering Project Organization Journal · doi:10.1080/21573727.2014.907151 · Cited by 80
A comparative study of the measurements of perceived risk among contractors in China
Lu, S., & Yan, H. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.06.001 · Cited by 54
Hwang, W., Hsiao, B., Chen, H., & Chern, C.-C. (2016) · Project Management Journal · doi:10.1002/pmj.21563 · Cited by 40
The application of cognitive mapping methodologies in project management research
Edkins, A., Kurul, E., Maytorena-Sanchez, E., et al. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.04.003 · Cited by 39
Cited by
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
The front-end of projects: a systematic literature review and structuring
Williams, T., Vo, H., Samset, K., & Edkins, A. (2019) · Production Planning & Control · doi:10.1080/09537287.2019.1594429 · Cited by 145
Metadata
- Authors
- Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2016-10
- Volume
- 34
- Issue
- 7
- Pages
- 1183-1198
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2463573071
- Cited by
- 294
- References
- 58
- FWCI
- 26.28
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.