Mapping the managerial areas of Building Information Modeling (BIM) using scientometric analysis
Open accessThe DOI matches its Crossref record; 44 of the 44 references it cites were found in a registry or an index.
Abstract
The successful adoption of Building Information Modeling (BIM) leads to the subsequent need for improving management practices and stakeholders' relationships. Previous studies have attempted to explore solutions for non-technical issues; however, a systematic and quantitative review of the details of non-technical field, namely, the managerial areas of BIM (MA–BIM), seems to be missing. Hence, a scientometric approach is used to construct knowledge maps in MA–BIM, thereby allowing bibliometric data to provide an objective and accurate perspective in the field as a whole. Through keyword and abstract term analysis of 126 related papers published from 2007 to 2015, an integrated conceptual framework is proposed to summarize current status and structure future directions of MA–BIM based on five principal research areas. This study shows the transformation of MA–BIM from an individual approach to a wide-ranging organizational strategy. It provides new insights into managing BIM projects by referring to the accurate representation and analysis of previous research efforts.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Modularity and community structure in networks
Newman, M. E. J. (2006) · Proceedings of the National Academy of Sciences · doi:10.1073/pnas.0601602103 · Cited by 12,256
Finding groups in data: an introduction to cluster analysis
(1991) · Choice Reviews Online · doi:10.5860/choice.28-4558 · Cited by 10,474
Armbrust, M., Fox, A., Griffith, R., Joseph, A. D., Katz, R., Konwinski, A., Lee, G., Patterson, D., Rabkin, A., Stoica, I., et al. (2010) · Communications of the ACM · doi:10.1145/1721654.1721672 · Cited by 9,464
Chen, C. (2006) · Journal of the American Society for Information Science and Technology · doi:10.1002/asi.20317 · Cited by 6,433
Finding Groups in Data: An Introduction to Cluster Analysis.
Sarle, W. S., Kaufman, L., & Rousseeuw, P. J. (1991) · Journal of the American Statistical Association · doi:10.2307/2290430 · Cited by 3,539
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Building Information Modeling (BIM) for existing buildings — Literature review and future needs
Volk, R., Stengel, J., & Schultmann, F. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.10.023 · Cited by 2,199
Börner, K., Chen, C., & Boyack, K. W. (2003) · Annual Review of Information Science and Technology · doi:10.1002/aris.1440370106 · Cited by 1,812
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741
Wang, X. (2012) · Construction Economics and Building · doi:10.5130/ajceb.v12i3.2749 · Cited by 1,495
The project benefits of Building Information Modelling (BIM)
Bryde, D., Broquetas, M., & Volm, J. M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.001 · Cited by 1,268 · cited 1×
“Construction projects, particularly megaprojects, are becoming significantly complex and difficult to manage (Bryde et al., 2013).”
BackgroundBursty and Hierarchical Structure in Streams
Kleinberg, J. (2003) · Data Mining and Knowledge Discovery · doi:10.1023/a:1024940629314 · Cited by 1,170
Application Areas and Data Requirements for BIM-Enabled Facilities Management
Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000433 · Cited by 915
Understanding and facilitating BIM adoption in the AEC industry
Gu, N., & London, K. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.002 · Cited by 912
Interaction of Lean and Building Information Modeling in Construction
Sacks, R., Koskela, L., Dave, B. A., & Owen, R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000203 · Cited by 689
Enhancing environmental sustainability over building life cycles through green BIM: A review
Wong, J. K. W., & Zhou, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.003 · Cited by 671
Stakeholder management studies in mega construction projects: A review and future directions
Mok, K. Y., Shen, G. Q., & Yang, J. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.08.007 · Cited by 599
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
Irizarry, J., Karan, E. P., & Jalaei, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.005 · Cited by 481
Value proposition on interoperability of BIM and collaborative working environments
Grilo, A., & Jardim-Goncalves, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.11.003 · Cited by 450
Macro-BIM adoption: Conceptual structures
Succar, B., & Kassem, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.04.018 · Cited by 399
Exploring how information exchanges can be enhanced through Cloud BIM
Redmond, A., Hore, A., Alshawi, M., & West, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.02.003 · Cited by 281
Changing roles of the clients, architects and contractors through BIM
Sebastian, R. (2011) · Engineering, Construction and Architectural Management · doi:10.1108/09699981111111148 · Cited by 274
Bridging BIM and building: From a literature review to an integrated conceptual framework
Chen, K., Lu, W., Peng, Y. M., Rowlinson, S., & Huang, G. Q. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.03.006 · Cited by 273
Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis
Yalcinkaya, M., & Singh, V. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.012 · Cited by 272
Where to Focus for Successful Adoption of Building Information Modeling within Organization
Won, J., Lee, G., Dossick, C., & Messner, J. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000731 · Cited by 267
Practices and effectiveness of building information modelling in construction projects in China
Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., & Zhang, W. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.10.014 · Cited by 266
Self-citationA conceptual framework for integrating building information modeling with augmented reality
Wang, X., Love, P. E. D., Kim, M. J., Park, C.-S., Sing, C.-P., & Hou, L. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.10.012 · Cited by 263 · cited 1×
“The first method is the integration of BIM with augmented reality (Wang et al., 2013), a geographic information system (GIS) (Irizarry et al., 2013), and a wireless sensor (Riaz et al., 2014), which extends the limits of visualized management, with the attempt to fill in the technical gap.”
MethodSon, H., Lee, S., & Kim, C. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.10.012 · Cited by 234
Visualization of Work Flow to Support Lean Construction
Sacks, R., Treckmann, M., & Rozenfeld, O. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000102 · Cited by 226
Seeding the survey and analysis of research literature with text mining
Delen, D., & Crossland, M. D. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.01.035 · Cited by 215
Understanding adoption and use of BIM as the creation of actor networks
Linderoth, H. C. J. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.09.003 · Cited by 208
Impacts of Isomorphic Pressures on BIM Adoption in Construction Projects
Cao, D., Li, H., & Wang, G. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000903 · Cited by 202
Self-citationPollack, J., & Adler, D. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.04.011 · Cited by 182
CoSMoS: A BIM and wireless sensor based integrated solution for worker safety in confined spaces
Riaz, Z., Arslan, M., Kiani, A. K., & Azhar, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.010 · Cited by 181
Research patterns and trends of Recommendation System in China using co-word analysis
Hu, J., & Zhang, Y. (2015) · Information Processing & Management · doi:10.1016/j.ipm.2015.02.002 · Cited by 163
Fox, S., & Hietanen, J. (2007) · Construction Management and Economics · doi:10.1080/01446190600892995 · Cited by 140
Investigating the Role of Lean Practices in Enabling BIM Adoption: Evidence from Two Indian Cases
Mahalingam, A., Yadav, A. K., & Varaprasad, J. (2015) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000982 · Cited by 132
Implementing innovation: a stakeholder competency-based approach for BIM
Murphy, M. (2014) · Construction Innovation · doi:10.1108/ci-01-2014-0011 · Cited by 84
Needs and technology adoption: observation from BIM experience
Singh, V., & Holmström, J. (2015) · Engineering Construction & Architectural Management · doi:10.1108/ecam-09-2014-0124 · Cited by 82
Ibrahim, N. H. (2013) · Journal of Information Technology in Construction · Cited by 81
Preliminary building information modelling adoption model in Malaysia
Enegbuma, W. I., Aliagha, G. U., & Ali, K. N. (2014) · Construction Innovation · doi:10.1108/ci-01-2014-0012 · Cited by 60
ADOPTION PROCESSES FOR EDM, EDI AND BIM TECHNOLOGIES IN THE CONSTRUCTION INDUSTRY
Samuelson, O., & Björk, B. (2014) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2013.801888 · Cited by 55
Aligning Misaligned Systemic Innovations: Probing Inter-Firm Effects Development in Project Networks
Alin, P., Maunula, A., Taylor, J. E., & Smeds, R. (2013) · Project Management Journal · doi:10.1002/pmj.21316 · Cited by 51
Attitudes, behaviours and the transmission of cultural traits
Brewer, G. J., & Gajendran, T. (2012) · Construction Innovation · doi:10.1108/14714171211215949 · Cited by 41
Cited by
Critical evaluation of off-site construction research: A Scientometric analysis
Hosseini, M. R., Martek, I., Zavadskas, E. K., Aibinu, A. A., Arashpour, M., & Chileshe, N. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.12.002 · Cited by 647
Is Metaverse in education a blessing or a curse: a combined content and bibliometric analysis
Tlili, A., Huang, R., Shehata, B., Liu, D., Zhao, J., Metwally, A. H. S., Wang, H., Denden, M., Bozkurt, A., Lee, L.-H., et al. (2022) · Smart Learning Environments · doi:10.1186/s40561-022-00205-x · Cited by 624
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Costin, A., Adibfar, A., Hu, H., & Chen, S. S. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.07.001 · Cited by 464
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
Metadata
- Authors
- He, Q., Wang, G., Luo, L., Shi, Q., Xie, J., & Meng, X.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2017-05
- Volume
- 35
- Issue
- 4
- Pages
- 670-685
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2515112257
- Cited by
- 351
- References
- 44
- FWCI
- 26.69
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.